0% found this document useful (0 votes)
55 views3 pages

Busin Ess Blueprin T For Sap Ecc 6.0 Implementation: Module Co

This 3 sentence summary provides an overview of the key details in the document: The document outlines a business blueprint for implementing the SAP ECC 6.0 Controlling module at Gujarat Glass (P) Ltd. in India, including flow charts and lists of reports and gaps. It was prepared by Giri Chandran on September 15, 2006, reviewed on October 25, 2006, and is the third draft version of the blueprint.

Uploaded by

Angela Terrell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

Busin Ess Blueprin T For Sap Ecc 6.0 Implementation: Module Co

This 3 sentence summary provides an overview of the key details in the document: The document outlines a business blueprint for implementing the SAP ECC 6.0 Controlling module at Gujarat Glass (P) Ltd. in India, including flow charts and lists of reports and gaps. It was prepared by Giri Chandran on September 15, 2006, reviewed on October 25, 2006, and is the third draft version of the blueprint.

Uploaded by

Angela Terrell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

BUSIN ESS BLUEPRIN T FOR SAP ECC 6.

0
IMPLEMENTATION
AT

GUJARAT GLASS (P) LTD.


INDIA (JAMBUSAR, KOSAMBA)
SL (RATMANALA, NATTANDIYA)
MODULE CO
CONTROLLING

Document Information
Project Name:

Gujarat glass private limited

SAP ECC 6.0 Implementation

Project Director:
Opportunity Roadmap Phase:
Quality Review Method:
Prepared By:

Document Version No:

Business Blueprint Preparation

3.0

Document Version Date:

27/10/2006

Preparation Date:

15/09/2006

Review Date:

25/10/2006

Review Method
Giri Chandran

Reviewed By:

Distribution List
From

Date

Giri Chandran

27/10/2006

To

Action*

Mr A Balaji

Acceptance/Signoff

HP

Phone/Fax

Due Date

Phone/Fax

Mr. V. Rajshekar

* Action Types: Approve, Review, Inform, File, Action Required, Attend Meeting, Other (please specify)
Version History
Ver. No.

Ver. Date

Revised By

Description

Ver. 1.0

14.09.06

Giri Chandran

New Document

Ver. 2.0

15.09.06

Giri Chandran

Modified the document to


Include flow charts.

GGPL_BBP_CO_Ver2.0.doc

Ver. 3.0

28.09.06

Giri Chandran

Modified the document to


modify the list of GAPS, to
modify the list of reports, to
include US & UK Processes.

GGPL_BBP_CO_Ver3.0.doc

SAP ECC 6.0 Business Blueprint for


GGPL Controlling Module

Hewlett-Packard
- confidential -

Filename

Draft Version

GGPL_BBP_CO_Ver1.0.doc

Page 2 of 86

Ver. No.

Ver. Date

SAP ECC 6.0 Business Blueprint for


GGPL Controlling Module

Revised By

Description

Hewlett-Packard
- confidential -

Filename

Page 3 of 86

You might also like