0% found this document useful (0 votes)
47 views1 page

Gantt Chart

The Gantt chart outlines the timeline for an undergraduate student's final year project from 2014 to 2015. It includes receiving the project title, meeting with a supervisor, conducting research, site visits, writing draft proposals and the thesis, submitting for defense, and a final viva presentation at the end of the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Gantt Chart

The Gantt chart outlines the timeline for an undergraduate student's final year project from 2014 to 2015. It includes receiving the project title, meeting with a supervisor, conducting research, site visits, writing draft proposals and the thesis, submitting for defense, and a final viva presentation at the end of the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

GANTT CHART

Month (2014 -2015)


Received project title and choose Supervisor
Meeting with supervisor to discuss project

10

11

12

title
Constructing Base Map
Library Research for Journals and Articles
Locating Project Site and Site Visit
Writing First Draft Proposal
Submission of Proposal
Proposal Defense
Submission of First Draft of Proposal
Submission of Final Draft of Proposal
Mapping and Data Collection
Analysing Data
Writing Thesis
Submission of Thesis
Final Year Project for Undergraduate Viva
Submission of First Draft of Thesis
Submission of Final Draft of Thesis

31

You might also like