0% found this document useful (0 votes)
244 views1 page

Pltu 2X30 MW Amurang Project Space Technology: Pt. Gutji Swarnadwipa

This document belongs exclusively to PT. Gutji Swarnadwipa and is not to be shared, copied, or communicated without prior authorization. It provides details on the PLTU 2x30 MW Amurang Project, including the project owner, consultant, contractor, and revision details.

Uploaded by

Sibolis Naburju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views1 page

Pltu 2X30 MW Amurang Project Space Technology: Pt. Gutji Swarnadwipa

This document belongs exclusively to PT. Gutji Swarnadwipa and is not to be shared, copied, or communicated without prior authorization. It provides details on the PLTU 2x30 MW Amurang Project, including the project owner, consultant, contractor, and revision details.

Uploaded by

Sibolis Naburju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

This document is the exclusive property of

and shall not be used,copied or communicated to third parties without prior autorisation

10

11

12

13

14

15

16

REV

ESTABLISHED
DATE

CHECKED
DATE

APPROVED
DATE

MODIFICATIONS

STATUS

OWNER

CONSULTANT

PLTU 2x30 MW AMURANG PROJECT


SPACE TECHNOLOGY

OWNER DRAWING NO.:

CONTRACTOR

PT. GUTJI SWARNADWIPA


ISSUED BY

10

11

12

13

14

15

16

You might also like