Power plant
Root Cause Analysis - Power MAT (
Problem
Statement
Power Plant Restoration A
1st Why
AT 23:49 HR. , SMS # 3 HT BRK.
TRIPPED ON E/F
AT 23:49 HR. , B/C # 2
TRIPPED ON O/C.
2nd Why
Inspection of SMS # 3 cable done
and Find out one cable Faulty .
CHECKING THE ALL HT
BRK & RACKOUT THE
SMS # 3 HT BRK.
3rd Why
Faulty cable removed from both the
End for rectification.
AT 23:59 HR., B/C # 2
BRK. MADE ON.
4th Why
AT 05:30 HR. , SMS # 3 BRK.
CHARGED , AFTER FAULTY CABLE
ISOLATED.
5th Why
6th Why
Project
7th
Why- Udaan /Maintenance/
8th Why
9th Why
Revision 0
10th Why
Actions
Identified
Proper inspection should be done at
time of shutdown maintenance
HT cable insulation test should be
carried out during Shut Down
Name and sign
of members
Members present-Suryakant Verma .
Power MAT (Operation/Mechanical/Electrical/Instrumentation)
estoration After Black Out On 31/01/2015 At 23:49 HRS
AT 23:49 HR. , TG # 4 TURBINE
TRIPPED ON "LUB. OIL PRESS.
LOW."
AT 23:51 HR , TG # 1 TURBINE
TRIPPED ON " HOTWELL LEVEL HIGH"
PARTIALLY BLACK - OUT
OCCURRED IN PP PHASE-1
PARTIALLY BLACK - OUT OCCURRED
IN PP PHASE-1
Auxillary Supply provided AFTER
B/C # 2 BRK. MADE ON.
Auxillary Supply provided AFTER B/C # 2
BRK. MADE ON.
AFTER TG ROLLONG TG # 4
SYNCH. WITH SYSTEM AT
00:33 HR.
AFTER TG ROLLONG TG # 1 SYNCH.
WITH SYSTEM AT 01:23 HR.
Revision 01
Power plant
Problem
Statement
1st Why
2nd Why
3rd Why
4th Why
5th Why
Action required
Name and sign
of members