0% found this document useful (0 votes)
46 views1 page

Technical Props

The document outlines the schedule and logistics for a film shoot on June 3rd, 2010. It details the times and locations for scenes, notes the actors and props needed at each location, and lists the technical equipment like cameras. The shoot began with preparation at 4:30PM and included scenes at a park from 6:30-7:15PM, a second location at an isolated road from 7:30-7:40PM, and a third in an alley from 8:00-8:15PM. Technical equipment was transported between locations as scenes wrapped and actors moved to their next positions. The day of filming ended at 8:15PM after completing all scheduled scenes.

Uploaded by

EshaMakol
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Technical Props

The document outlines the schedule and logistics for a film shoot on June 3rd, 2010. It details the times and locations for scenes, notes the actors and props needed at each location, and lists the technical equipment like cameras. The shoot began with preparation at 4:30PM and included scenes at a park from 6:30-7:15PM, a second location at an isolated road from 7:30-7:40PM, and a third in an alley from 8:00-8:15PM. Technical equipment was transported between locations as scenes wrapped and actors moved to their next positions. The day of filming ended at 8:15PM after completing all scheduled scenes.

Uploaded by

EshaMakol
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 1

DATE TIME LOCATION ACTORS PROPS TECHNICAL NOTE

PROPS

06/03/10 4:30P.M ____________ ____________ -costume


-actors
-camera
-lighting
}preparation before
arriving to the
location.

06/03/10 5:00P.M Leaving to go first Actors all should be All props should be Technical props
destination which, is at the location at the placed at the current should also be
the park. latest 6:30P.M location. placed at the park.

06/03/10 6:30P.M Arrived at the Actors should be all The football should
location. Which is at dressed in costume. be placed at the
Camera should be
ready for shooting.
the park. scene.

06/03/10 6:45P.M Bushy park. Scene


begins playing
All the football actors Football
and the coach should
Camera ready to
press record.
Zooming in and out
showing match on
football. be set in position. action.

06/03/10 7:00P.M First shooting begins. Actors acting in there Football being used. Camera on roll.
The park on green. position.

06/03/10 7:15P.M First scene ends at


the the park. Exist
Actors leave to arrive _____________
at the second
Pack up technical
equipment and take it
park. location. to next location.

06/03/10 7:30P.M Arrive at second


location. Isolated
Actors ready at the
second scene.
_____________ Camera set up.
Ready to record.
Wheeling the
camera.
road.

06/03/10 7:40P.M Second scene


begins. On a less
Actors walking
towards there house.
_____________ Camera on roll.

busy road.

06/03/10 8:00P.M Third scene begins


on a ally.
Other actors exit the Headphones.
scene.
Camera still on roll.

06/03/10 8:15P.M ______________ ______________ ______________ _____________ END OF SHOOTING

You might also like