Typical FEED Schedule
Typical FEED Schedule
Activity
Contract Effective Date
Process simulations
PFD
H&MB
Equipment list
Fluids list
P&IDs preparation and 1st issue (IFR)
PR
P&ID review with COMPANY
P&IDs 2nd issue (IFH)
HAZOP review
P&IDs IFD
Process equipment sizing & data sheets
Equipment Mechanical design, dwgs, data sheets
EQT Equipment Material Requisitions
Equipment Technical Bid Tabulations
PRT Inquiries to Equipment Vendors
Material selection report
PM
Piping classes summary & specifications
Plot plan - 1st issue (IFR)
HAZID + Plot Plan review with COMPANY
PL
Plot Plan IFD
Piping routing
PI
Piping MTO
Instrument list
System architecture drawing
I&C
Main cable routing drawings
MTO
Load list
Single line diagram
Equipment sizing
EL
Sub-station arangement drawings
Main cable routing drawings
MTO
HSE Fire Protection drawing
Building architectural drawings
General Underground Networks drawing
Foundation guide drawings
CIV
Pipe-racks and Steel structures outline drawings
Civil MTO
SUB Inquiries to Construction contractors
COST Cost estimate
Project Month
4 5 6 7 8 9 10 11 12
(c) The Oil & Gas Engineering Guide, Herv Baron, Eidtions Technip, 2005
Disc.
Gen