Sub Station BLDG 1
Sub Station BLDG 1
Footing
F1
No.
Excavation
conc.work
F2
Excavation
Conc. Work
5
5
Footing reinforcement
F1
10 tor 150 c/c
Bars parallel to length
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
Bars parallel to breadth
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
F2
12 tor 150 c/c
Bars parallel to length
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2
Bars parallel to breadth
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2
Surface dressing
Lean Conc
In footing
F1
F2
For plinth beam
No. of column in
footing
4
5
H
V
Reinforcement detail
C1
of Height 4 m
Length of Lateral Ties
2*(0.41)+4*(0.26)
Spacing 12 Dia 75c/c
Height of column/75
4/0.075 = 53 Bar + 1= 54
HOOKS= 8*Dia
8*0.012
54
4
4
Plinth beams
PB 1
Excavation
H PB 1
V PB 1
2
2
Conc. Work
HPB 1
V PB 1
2
2
Reinf. Of 16 Dia
PB 2
Excavation
HPB 2
VPB 2
1
1
Conc Work
HPB 2
VPB 2
1
1
Reinf. Of 12 Dia
Roof Beam
RB 1
HRB 1
Reinf. Of 12 Dia
2
6
RB 2
HRB 2
VRB 2
Reinf. Of 16 Dia
1
3
6
LB 1
HLB1
VLB1
Reinf. Of 12 Dia
9
3
3
6
Shuttering
Ar of roof
Column
C1
of Height 4 m
Plinth Beam
PB 1
HPB 1
VPB 2
PB 2
HPB 2
VPB 2
10
11
12
13
Column in footing
F1
F2
4
5
Wall
steps
Plaster
of Height 4 m
Roof Slab
RS 1
RS 2
1
1
RS 2
Reinf. Of 10 Dia 150 c/c
Spacing of bars
Length /0.150 = 4.73/0.15
4.73/0.15= 32 Bar + 1 = 33
Breadth /0.15= 7.23/0.15
7.23/0.15= 48 Bar + 1 = 49
14
Flooring
sub station
Platform
15
window
Rolling shutter
16
24
49
33
49
Quantity
Unit
1.4
1.4
1.6
12.544
cum
1.3
1.3
1.5
10.14
1.6
1.5
1.6
1.5
1.6
1.5
20.48
16.875
Total Excavation
Total Conc. Work
33.024
27.015
cum
cum
No. of Bars
10
40
10
40
11
1.2
66
11
1.2
66
9.77
4.5
9.37
4.2
Total
91.5449
18.9
110.4449
sqm
0.15
0.15
1.014
1.6875
cum
cum
1.3
1.5
1.3
1.5
24.48
21.69
0.23
0.23
0.15
0.15
0.84456
0.748305
cum
cum
0.3
0.45
4.86
cum
1.956
950.616
6.121
6.313
220.356
227.268
m
m
1.86
0.096
10.72
8.86
0.23
0.23
0.6
0.6
Total
Excavation
1.47936
1.22268
0.6
0.6
Total Conc
work
2.25216
1.99548
16.32
14.46
0.23
0.23
2.70204
cum
4.24764
cum
184.68
5.16
4.23
0.23
0.23
0.45
0.45
0.53406
0.437805
cum
cum
8.16
7.23
0.23
0.23
0.45
0.45
0.84456
0.748305
cum
cum
92.34
1.68912
cum
97.92
0.84456
2.244915
cum
cum
179.1
2.53368
2.244915
cum
cum
277.02
62.4968
sqm
16.32
0.23
0.45
8.16
21.69
24.48
21.69
0.23
0.23
0.23
0.23
0.45
0.45
0.45
0.45
0.3
0.45
54
2*(lh+bh)
16.32
14.46
0.23
0.23
0.6
0.6
19.86
17.628
sqm
sqm
8.16
7.23
0.23
0.23
0.45
0.45
Total
7.551
6.714
51.753
sqm
sqm
sqm
1.3
1.5
42.65
1.96
1.3
1.5
0.23
0.3
42.65
3.43
4.73
7.23
7.23
1.5
1.5
Total
31.2
45
76.2
sqm
4
0.15
39.238
0.2646
cum
cum
341.2
sqm
0.13
0.15
3.223857
5.129685
cum
cum
7.23
173.52
3.43
168.07
683.18
7.23
238.59
4.73
231.77
940.72
58.9968
3.5
sqm
sqm
8.16
1
7.23
3.5
7.8
3
1.2
2.4
9.36
7.2
sqm
sqm
2.2
3.5
0.6
2.31
cum
.1m added
extra
10
80
12
132
12
1638.252
16
591.048
2(lh+bh)
2 SIDES
8
683.18
10
940.72
2* becoz of
bottom and top
Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for
foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in
soft/loose soil.
M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of
surface area
Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion
per sqm of vertical surface
Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of
surface.
7
8
Treating the soil along with external perimeter of building at the rate of 2.25 litre
of emulsion per meter of perimeter of wall.
Cement concrete in foundation filling and mass concrete type D2 1:4:8
TMT bars 10 mm dia and over cut to length bent to shape required including
cranking bending spirally for hooping for cloumns hooking ends and binding with
mild steel wire not less than 0.9-0 mm dia
10
11
12
Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and
similar works
13
14
Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan
not exc 6 m mean radius
15
16
Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster
17
Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas
slabs etc
18
20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over
100 mm thick PCC Type D2 over 150 mm thick hard core
19
20
21
22
7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM
1:4 over 100 mm thick PCC 1:2:4
Roof treatment
Dry distemper
Three coats of white wash on ceiling
23
24
Supply and fix steel windows with side hung shutters including projecting type
hinges with steel handle and steel peg stays with glazing bars
25
shutter
shutter?
Qty
110.4449
Unit
Sqm
Rate
7.9
Amount
872.51471
SSR
3011
36.697905
Cum
115.2
4227.5987
3006
3.8424
Cum
41.7
160.22808
3009
203.148
Sqm
80.6
16373.729
3047
69.255
Sqm
126.8
8781.534
3048
62.4968
Sqm
80.6
5037.2421
3049
110.4449
Sqm
38.6
4263.1731
3051
4.294365
Cum
2303.3
9891.2109
4025
3392.549
kg
48.6
164877.88
10034
181.953
Sqm
134.2
24418.093
7004
49.582695
Cum
3482.2
172656.86
4053
62.4968
Sqm
211.5
13218.073
7006
8.353542
Cum
3770
31492.853
4055
39.5026
Cum
255.3
10085.014
5019
170.6
Sqm
134.8
153.6
Sqm
77.3
62.4968
Sqm
76.3
Sqm
805.69
Sqm
520.4
13074
Sqm
Sqm
Sqm
300
31.1
11.8
0
0
0
Assessed
15010
15006
14001
4768.5058
14001 & 14004
Sqm
11.8
15006
9.36
Sqm
1689.4
15812.784
10071
7.2
Sqm
Total
0
521807.46
Add 3% for
unforeseen
items
15654.224
Grand total
537461.68
Plinth area of
building
Plinth area
rate per Sqm
Sqm
#DIV/0!
10
12
16
20
25
0.39
0.61
0.89
1.57
2.46
3.85
683.18
80
132
591.048
940.72
1638.252
1020.72
1770.252
683.18
266.4402
591.048
3392.549