0% found this document useful (0 votes)
30 views1 page

Gantt Chart For Server Intrusion Detection

This Gantt chart outlines the tasks and timeline for a server intrusion detection project from February to May 2010. It includes tasks such as analyzing requirements, planning, collecting data, designing modules, coding four modules, testing, documenting, and implementing the project over the two month period.

Uploaded by

sudevwarrier
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Gantt Chart For Server Intrusion Detection

This Gantt chart outlines the tasks and timeline for a server intrusion detection project from February to May 2010. It includes tasks such as analyzing requirements, planning, collecting data, designing modules, coding four modules, testing, documenting, and implementing the project over the two month period.

Uploaded by

sudevwarrier
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

GANTT CHART FOR SERVER INTRUSION DETECTION

Mar 2010 Apr 2010 May 2010


ID Task Name Start Finish Duration
2/28 3/7 3/14 3/21 3/28 4/4 4/11 4/18 4/25 5/2

1 Analyze 2/26/2010 3/5/2010 6d

2 Planning 3/8/2010 3/12/2010 5d

3 Requirement Analysis 3/15/2010 3/22/2010 6d

4 Collecting the data 3/23/2010 3/31/2010 7d

5 Designing 4/1/2010 4/9/2010 7d

6 Review Design 4/12/2010 4/13/2010 2d

7 Module 1 : coding 4/14/2010 4/16/2010 3d

8 Module 2 : Coding 4/16/2010 4/19/2010 2d

9 Module 3 : Coding 4/19/2010 4/21/2010 3d

10 Module 4 : Coding 4/21/2010 4/23/2010 3d

11 Testing 4/23/2010 4/27/2010 3d

12 Documentation 4/28/2010 5/7/2010 8d

13 Implementation 5/10/2010 5/11/2010 2d