The document provides settings and calculations for protective relay equipment. It lists minimum and maximum load currents, a maximum primary winding value, and a minimum short-circuit current. It then shows calculations to determine boundary values for ID>1, ID>2, and Is based on percentages of the load current and primary winding. Graphs show the 100% curve and 70% curve with the boundary values indicated.

Uploaded by

rtsr1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
403 views3 pages

Idiff Ibias B

The document provides settings and calculations for protective relay equipment. It lists minimum and maximum load currents, a maximum primary winding value, and a minimum short-circuit current. It then shows calculations to determine boundary values for ID>1, ID>2, and Is based on percentages of the load current and primary winding. Graphs show the 100% curve and 70% curve with the boundary values indicated.

Uploaded by

rtsr1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

SETTINGS

IloadMin =
50
IloadMax =
1600
Biggest PW** = 2000
Icc min* =
12000

A
A
A
A

ID>2 =
Is =
k=
ID>1 =

Idiff x ILoadMax

DATA

2000 A
150 A
0.7
40 A

* Minimum short-circuit current (usually ph-ph)


** Biggest PW = Biggest CT primary winding

or

10
9
8
7

CHECK LIST
Minimum
1600
1920

11

OK
OK

Maximum
6000
9600

OK
OK

ID>2 =
2000

40

OK

Is =
150

OK

600

40

OK

ID>1 =
40

OK

40

6
5
4
3
2
1

CALCULATION :
ID>2 =
Is =
ID>1 =

1 or 1.2 x IloadMax <


ID>1 <
2% of the Biggest PW <

ID>2 =
Is =
ID>1 =

1.25 x ILoadMax
0.09 x ILoadMax
0.03 x ILoadMax

<
<
<

Ibias x ILo

0.5 or 0.8 x Icc min


Crossing value of 100% curve and k% curve must be below ID>2
0.8 x IloadMin

100%
ID>1
ID>2
0.7
0 crossing k1

Ibias x ILoadMax

% curve must be below ID>2

Ibias

100%
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10

0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10

ID>1 =
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025

ID>2 =
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25

Pente a Is Pente a 0
0.09375
0.00
0.44375
0.35
0.79375
0.70
1.14375
1.05
1.49375
1.40
1.84375
1.75
2.19375
2.10
2.54375
2.45
2.89375
2.80
3.24375
3.15
3.59375
3.50
3.94375
3.85
4.29375
4.20
4.64375
4.55
4.99375
4.90
5.34375
5.25
5.69375
5.60
6.04375
5.95
6.39375
6.30
6.74375
6.65
7.09375
7.00

You might also like