The document summarizes a project to improve a wastewater treatment plant in Yorkshire, England. To support the construction of a new activated sludge plant comprising a large concrete tank, over 5,000 vibro stone columns and 600 vibro concrete columns were installed. This design solution was able to provide the required bearing capacities of 75-180kPa and limit settlement to specifications, by taking into account the varying soil conditions found at the site. The £300,000 ground improvement contract supported a total £64 million project to meet new EU regulations.

Uploaded by

Alfredo A Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Project Esholt

The document summarizes a project to improve a wastewater treatment plant in Yorkshire, England. To support the construction of a new activated sludge plant comprising a large concrete tank, over 5,000 vibro stone columns and 600 vibro concrete columns were installed. This design solution was able to provide the required bearing capacities of 75-180kPa and limit settlement to specifications, by taking into account the varying soil conditions found at the site. The £300,000 ground improvement contract supported a total £64 million project to meet new EU regulations.

Uploaded by

Alfredo A Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Esholt WWTW - Vibro stone and concrete columns

General view of the construction site

Project Description

Design Solution

Improvements to the Esholt wastewater


treatment works in Yorkshire require a new
activated sludge plant comprising a massive
reinforced concrete tank, 204m long 80m wide
with perimeter walls 6.5m high.

Working in conjunction with consultant Carl


Bro and main contractor Morgan Est Pennines
geotechnical engineers were able to design a
scheme using 5000 vibro stone columns and
600 vibro concrete columns. Close co-operation
including
programming
additional
site
investigation following land remediation,
enabled the reuse of excavated material from
other areas of the site as well as providing data
to enable Pennine to rationalise their design to
suit the varying ground conditions and the range
of bearing capacities.

Soil conditions below the tank range from


competent sand and gravel overlying coal
measures and bedrock of variable quality, to
made ground and weak alluvial clay and sand
and gravel. The site had also been used for
waste tipping as well as a slurry lagoon.
The sludge plant required bearing capacities
ranging from 75kPa to 180kPa, total settlement
was to be less than 30mm with differential
settlement limited to 1 in 500.

The 300,000 subcontract will support


Yorkshire Waters total spend of 64million to
meet new EU discharge regulations.

www.pennine.co.uk