Conductor Analysis Spreadsheet
Conductor Analysis Spreadsheet
1
Well Name:
Example #1
Configuration
Fixed Point Below Mudline
30.0 ft
Wellhead Stick Up Above Mudline 30.00 ft
LMRP/BOP Height
ft
51
Conductor Specification
OD
Wall Thickness
Grade
Include secondary conductor?
Include surface casing?
36.0
2.00
70
YES
YES
in
in
ksi
Shear load
(kips)
0%
2%
4%
6%
8%
10%
10.0
30.0
50.0
70.0
90.0
110.0
1.5
1.5
9.6
28.0
300
5000
deg
kip-ft/deg
kips
kip-ft
RUN
10.00
Example #1
Factor of Safety for Pipe Body vs % of Vessel Offset for 36 in OD;2 in Wall; X-70
Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft
Secondary Conductor Included?: YES
Surface Casing Included?: YES
Conductor
Secondary
Conductor
Surface Casing
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
10.00
Example #1
Factor of Safety for Pipe Body vs % of Vessel Offset for 36 in OD;2 in Wall; X-70
Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft
Secondary Conductor Included?: YES
Surface Casing Included?: YES
Conductor
Secondary
Conductor
Surface Casing
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
6.00
Example #1
Factor of Safety for Connection vs % of Vessel Offset for 36 in OD;2 in Wall; X-70
Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft
Secondary Conductor Included?: YES
Surface Casing Included?: YES
Elastic
Plastic
5.00
4.00
3.00
2.00
1.00
0.00
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
Example #1
Wellhead Analysis
Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft
Secondary Conductor Included?: YES
Surface Casing Included?: YES
6000
5000
4000
3000
2000
1000
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%