WeeklyPlan 091213
WeeklyPlan 091213
Mining Operations
Material Movement
Total Tonnes Mined Month budget
Total Sulfide Ore Tonnes Mined
Oxide Ore Tonnes Mined
Waste Tonnes Mined
Budget
Tonnes
1,050,000
318,338
35,157
696,505
1,050,000
Rehandle Material
Current Week 50
Current
Tonnes
1,118,859
342,729
127,152
648,978
Difference
Tonnes
68,859
24,391
91,995
-47,527
12-Dec
Variance
%
6.6
7.7
261.7
-6.8
Month to date
Budget
Tonnes
1,800,000
545,722
60,269
1,194,009
1,800,000
47,401
Current
Tonnes
1,875,939
647,963
155,304
1,072,672
Difference
Tonnes
75,939
102,241
95,035
-121,337
Variance
%
4.2
18.7
157.7
-10.2
41,811
7.7
Variance
%
4.0
4.3
10.6
1.0
-5.4
-33.2
-54.1
-1.3
-1.8
3.6
-18.0
-2.9
-8.9
3.3
4.4
-10.3
2.9
8.5
-20.0
64,068
Crusher feeding
318,150
Nota: Primary crusher stopped 11:15 hours this week
S.R.
Equipment
Trucks CAT 789
Trucks CAT 785
Loaders
Shovels
Dozers
Water truck
Grader
Drills (m/hr.)
Trucks CAT 789
Trucks CAT 785
Loaders
Shovels
Dozers
Water truck
Grader
Drills (m/hr.)
Loaders
Shovels
Drills (m/hr.)
Availability
Availability
Availability
Availability
Availability
Availability
Availability
Availability
Utilization
Utilization
Utilization
Utilization
Utilization
Utilization
Utilization
Utilization
Productivity TPH
Productivity TPH
Productivity (m/hr.)
353,366
35,216
2.30
2.17
Target
Current
Difference
85%
75%
76%
85%
85%
85%
85%
85%
85%
83%
86%
86%
85%
85%
85%
88%
1,500
2,400
40
89%
82%
86%
90%
78%
45%
49%
90%
82%
85%
68%
82%
70%
88%
88%
79%
1,490
2,717
34
4%
7%
10%
5%
-7%
-40%
-36%
5%
-3%
2%
-18%
-4%
-15%
3%
3%
-9%
-10
317
-6
11.1
Variance
%
4.6
9.1
13.7
5.6
-7.8
-46.7
-42.0
5.4
-3.6
2.8
-21.0
-4.1
-17.4
4.0
3.4
-10.5
-0.7
13.2
-15.0
545,400
587,211
2.30
2.19
Target
Current
Difference
85%
75%
76%
85%
85%
85%
85%
85%
85%
83%
86%
86%
85%
85%
85%
88%
1,500
2,400
40
88%
78%
84%
86%
80%
57%
39%
84%
83%
86%
71%
84%
77%
88%
89%
79%
1,543
2,605
32
3%
3%
8%
1%
-5%
-28%
-46%
-1%
-2%
3%
-15%
-2%
-8%
3%
4%
-9%
43
205
-8
Production Statistics
Crusher target = 301,000
Thousands
1,119
11001050
1050
1050
1050
1050
1050
10501100
994
963
915
1,061
1050
Thousands
(KTonnes)
900
900844
900
815
700
700
500
500
336
301
301
375
301
366
331
329
301
301
301
326
301
353
318
300
300
209
100
100
24-Oct
31-Oct
7-Nov
14-Nov
Total Mined
Budget
21-Nov
Crusher feeding
28-Nov
5-Dec
12-Dec
Date
Crusher Budget
Productivities
Shovel Target = 2,400 T/hr
(Tonnes/ hr)
3,000
3,000
2,800
2717 2,800
2,600
2,600
2,400
2,400
2,400
2248
2,400
2,400
2,400
2422
2,400
2,400
2,400
2269
2238
2,200
2,000
2,400
2095
2,200
2073
2,000
1887
1,778
1,800
1,559
1,600 1500
1500
1,441
1,800
1,616
1500
1500
1500
1,473
1500
1,459
1,583
1500
1500 1,600
1,490
1,400
1,400
1,200
1,200
1,000
1,000
24-Oct
31-Oct
7-Nov
14-Nov
21-Nov
28-Nov
5-Dec
12-Dec
Date
Loader Productivity
Shovel Productivity
Shovel Target
Loader target
Loader Target = 76 %
Shovel Target = 85 %
100%
90%
100%
85%
85%
85%
85%
80% 76%
76%
76%
76%
85%
85%
73%
72%
72%
76%
76%
76%
75%
76% 80%
71%
70%
63%
90%
86% 90%
85%
82%
82%
76%
76%
85%
70%
65%
62%
60%
60%
55%
50%
50%
41%
40%
40%
24-Oct
31-Oct
7-Nov
14-Nov
Shovel Availability %
Loader Availability
21-Nov
Shovel Target
28-Nov
5-Dec
12-Dec
Date
Loader Target
(%)
100%
100%
95%
95%
88%
90%
85%
85%
88%
85%
85%
83%
85%
85%
85%
85%
85%
89% 90%
85%
82%
81%
78%
80%
75%
88%
75%
75%
74%
75%
85%
80%
75%
74%
75%
75%
75%
75%
75%
73%
75%
71%
70%
70%
65%
66%
65%
65%
60%
60%
55%
55%
50%
50%
24-Oct
31-Oct
7-Nov
14-Nov
21-Nov
28-Nov
5-Dec
12-Dec
Date
686500 mE
686000 mE
Jayula
4040
105%
7667000 mN
80%
Jayula
4080
Tesorera
4100
7666500 mN
110%
0%
0%
Ejecutado
Planificado
Tesorera
4130
105%
% Cumplimiento
Tesorera
4010
40%
7666000 mN
MINERA SAN CRISTOBAL S.A.
Weekly 50
Date:13/12/2009
Author: MPT
% Cumplimiento
Office: Wayville
Drawing: MPT
Scale: 1:6000
50
100
metres
200
5,020
1,999
JY4040
32,350
7,707
2,750
8,057
50,864
NSR
AGKRG
LG ORE
PBKRG
ZNKRG TONNES
66
28
52
22
1.04
0.41
3.42
1.52
60
23
67
66
103
44
185
129
0.38
0.11
0.56
0.75
2.53
0.87
1.39
2.25
7,019
NSR
AGKRG
OX ORE
PBKRG
ZNKRG TONNES
40
165
0.98
0.18
34,019
WASTE
S.R
AGKRG TONNES
2,102
23,018
85,202
14
62
0.49
0.28
2,102
108,220
36
23
150
96
7,753
7,577
7,195
14,772
32,350
7,707
2,750
8,057
50,864
195,728
218,746
121,323
340,069
195,728
TS4100
29,223
11,642
43
33
1
2
0.55
0.32
2.96
2.35
40,865
6,229
0.16
0.56
6,229
223,671
112,817
TS4010
222,952
26,986
20 827
20,827
270,765
187,500
15,344
20 827
20,827
TS4090
48,977
483,872
50
38
92.85
42.11
0.53
0.43
1.98
2.00
532,849
665,616
107,769
9.71
0.13
0.49
107,769
41
54
0.47
1.98
116,100
10
0.14
0.49
112,817
112,817
112,817
48,977
614,149
663,126
22,508
108,220
TOTAL
TONNES
2,557
5,196
TS4130
34,019
NSR
22,508
562,477
1.2
1,452,413
686500 mE
686000 mE
Jayula
4040
7667000 mN
Jayula
4060
Jayula
4070
Tesorera
4190
Tesorera
4100
7666500 mN
SEMANA 2
SEMANA 1
Tesorera
4130
Tesorera
4010
7666000 mN
Date:13/12/2009
WEEKLY PLAN
(12Dic09-19Dic09)
Author: mpt
Office: Wayville
Drawing: mpt
Scale: 1:7000
75
150
metres
300
NSR
AGKRG
Semana
LG ORE
PBKRG
ZNKRG TONNES
NSR
AGKRG
OX ORE
PBKRG
ZNKRG TONNES
NSR
WASTE
1
S.R
AGKRG TONNES
JY4070
19,262
39
47
0.57
1.86
62
111
0.50
2.45
39
38
160
165
0.91
1.31
0.21
0.04
43
32
1
2
0.55
0.33
2.96
2.28
61
33
81.94
29.69
0.80
0.38
2.96
1.97
19,262
JY4040
50,795
TS4130
31,678
1,980
50,795
33,658
TS4100
29,291
28,138
14,491
180,000
7,456
7,920
77,072
15,658
18
78
0.56
0.15
6,180
84,778
0.16
52
0.49
2.01
98,414
102
94
172
9.71
0.14
15
0.17
29,291
110,144
139,435
75,826
0.50
0.48
225,097
86,508
15,658
327,263
75,826
14,491
264,787
-
10
185,499
185,499
50,795
50,795
25
21
42
0.56
84,778
40
252,579
100,650
6,180
194,491
355,635
7,456
57,429
TS4010
271,841
271,841
252,579
100,650
9
25
107
TOTAL
TONNES
513,913
279,278
2.0
1,068,612
.
50,805.0
14,059.1
14,378.6
73,416.1
152,658.9
NSR
AGKRG
Semana
LG ORE
PBKRG
ZNKRG TONNES
NSR
1.41
2.52
24
AGKRG
OX ORE
PBKRG
ZNKRG TONNES
0.29
0.67
NSR
WASTE
2
S.R
AGKRG TONNES
JY4070
80,139
68
97
80,139
7,492
54
7,492
143,850
143,850
56,219
56,219
JY4040
JY4060
7,490
76,669
13,546
23
66
19
32
68
26
0.20
0.82
0.19
1.09
3.30
0.92
97,705
210,491
0.16
0.76
210,491
7,490
317,160
13,546
338,196
30,000
350732
TS4010
30,000
TS4190
15,147
170,740
40
36
88.22
44.03
0.36
0.41
185,887
363,731
49
62
0.70
2.20
217,983
350,732
350,732
350,732
1.29
1.80
0.16
0.75
TOTAL
TONNES
3,107
31,919
18,254
202,659
-
35,026
220,913
471,977
67,425.3
1.9
1,053,691
.
51,961.6
31,140.4
150,527.3
Perforacin y Voladura
TALADROS
Tipo
Malla
Prioridad
Equipo
Malla
1
2
701
701
Jy 4080
sobretama;os
0
1
2
3
4
704
704
704
704
704
Jy 4070_23
Jy 4040_04
Ts 4090_02
Jy 4070_24
Jy 4060_18
Total
Bloque
Saldo
Inicial
Por da
Domingo
Lunes
Martes
35
40
0
0
15
20
15
15
15
206
81
225
251
280
206
65
90
0
0
60
60
70
70
70
(metros)
Mircoles
Jueves
20
20
Viernes
Sbado
Taladros
Semana
Saldo
Final
45
40
Metros
-10
0
270
80
85
0
1
2
3
4
1
2
3
4
5
6
705
705
705
705
705
Ts 4010_06
Ts 4010_08
Ts 4010_09
Ts 4010_10
Ts 4010_11
706
706
706
706
706
706
Jy 4130_04
Ts 4100_09
Ts 4090_02
Ts 4190_01
Ts 4090_03
Ts 4090_04
6.06
5.63
5.63
6.06
6.06
5.63
5.63
5.63
5.63
5.63
4.33
5.63
5.63
6.06
5.63
5.63
7
6.5
6.5
7
7
6.5
6.5
6.5
6.5
6.5
218
190
145
160
175
5
6.5
6.5
7
6.5
6.5
80
80
225
280
220
260
218
160
0
0
0
20
0
135
0
0
0
60
60
70
70
70
40
70
60
70
60
65
16
50
70
15
55
70
70
56
70
30
35
70
40
20
40
30
40
30
40
30
70
60
10
30
30
70
0
16
135
251
70
PM 5 hr.
472
70
0
30
145
160
135
70
55
PM 5 hr.
70
350
0
0
0
0
210
0
176
1,485
2,761
770
5,192
0
0
0
0
40
0
330
1,595
1,760
1,485
470
60
80
90
240
0
0
5,170
0
0
0
40
220
260
660
880
990
2,640
0
0
470
Total taladros a perforar
Total metros a perforar
VOLADURAS
Voladur
as
1
2
3
4
5
6
7
8
9
10
Malla
Jy 4070_23
Ts 4010_06
Jy 4040_04
Ts 4010_08
Jy 4130_04
Ts 4010_09
Ts 4100_09
Ts 4090_02
Ts 4010_10
Jy 4070_24
Total
Taladros
Dimetr
o
PF
BX S
(Pulg)
(Kg/m3)
(m x m)
10 5/8
10 5/8
11 5/8
10 5/8
10 5/8
10 5/8
10 5/8
11 5/8
11 5/8
3 5/8
0.55
0.64
0.64
0.64
1.09
0.64
0.64
0.64
0.64
0.55
6.06
5.63
5.63
5.63
4.33
5.63
5.63
5.63
5.63
6.06
7
6.5
6.5
6.5
5
6.5
6.5
6.5
6.5
7
206
218
81
190
80
145
80
225
160
251
TONELAJE QUEBRADO
TONELAJE PLAN C&T
ANFO Planificado (KG)
Domingo
Lunes
Martes
5,170
1412
15,532
(toneladas)
Mircoles
Jueves
Viernes
Sbado
Observaciones
192,317
175,484
65,203
166,848
38,105
116,721
70,252
197,584
140,504
255,630
0
240,686
204,954
186,973
197,584
140,504
255,630
52,887
77,020
74,159
59,831
63,227
44,961
70,298
1,226,330
0
442,383
P y V MSC
Toldos,Noviembre2009
PlanificacionMina
PlataformaPROVE
450x180m
61,000m2
Toldos,Noviembre17,2009
MineraSanCristobalS.A.
PlataformaPROVE
Distanciaa
PlataforamPROVE
2,735m,
Gradiente+/ 6.5%
Distanciaa
Botadero5
3,145m,
Gradiente+/ 10%
Toldos,Diciembre2009
PlanificacionMina
TRABAJOSENCHANCADORLEVANTE1.5M
Toldos,Diciembre2009
PlanificacionMina
NuevoDisenoTF3
4190
179Kt
4180
298Kt
4160
861Kt
4140
1.0Mt
4170
643Kt
4150
1.1Mt
4130
1.5MtWst
6.0KtOre
New Rampa
Yuki
4130
New Rampa
Yuki
Reporte de
Mantenimiento Mina
Diciembre 2009 Sem 49 y 50
Programacin de
Mantenimiento