0% found this document useful (0 votes)
65 views1 page

Manual Monthly Time Sheet: Rakesh Rana 1-Jul-15 Jazan, KSA 31-Jul-15 8-Jul-15

The document is a monthly timesheet for Rakesh Rana, a Senior Engineer working on Project No. JI-2018/2019 in Jazan, KSA from July 1-31, 2015. It tracks his normal hours worked each day as well as any overtime. Rana's normal hours are 10 per day. The timesheet requires signatures from the employee, supervisor, and project approval to verify the reported hours worked. Instructions at the bottom explain how to fill out the timesheet for different contractual hours and leave types.

Uploaded by

rakeshrana1974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Manual Monthly Time Sheet: Rakesh Rana 1-Jul-15 Jazan, KSA 31-Jul-15 8-Jul-15

The document is a monthly timesheet for Rakesh Rana, a Senior Engineer working on Project No. JI-2018/2019 in Jazan, KSA from July 1-31, 2015. It tracks his normal hours worked each day as well as any overtime. Rana's normal hours are 10 per day. The timesheet requires signatures from the employee, supervisor, and project approval to verify the reported hours worked. Instructions at the bottom explain how to fill out the timesheet for different contractual hours and leave types.

Uploaded by

rakeshrana1974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Manual Monthly Time Sheet

SHJ-

HR-FRM-X-08597 Rev 0

Name:

Rakesh Rana

Designation:

Project No:

Job Code
Normal Hours

10

10

250640

B. No.:

Senior Engineer Contracts

10

10

10

10

10

10

JI-2018/2019

Location:

Jazan,KSA

From:

1-Jul-15

To:

31-Jul-15

Date:

8-Jul-15

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
8

10

10

10

10

10

Fixed Over Time


( Restricted to those contratually eligible for FOT)

Current Month OT
(Restricted to Weekends & public Holidays Only)

Previous Month Over Time

Previous Month OT

Employee Signature

Supervisor Approval

Project Approval

Name:

Name:

Name:

Signature:

Signature

Signature:

Date

Date

Date

In order to easily read your Time Sheet, please use as follows;


For Junior Staff Only
Time Sheet Legend

Contractual Hrs

Remarks

P/8 - Normal contract hours are 8

Normal

FOT

P/10 - Normal contract hours are 10


W - Week-end
H - National Holiday

Use FOT row to enter FOT hours. Use OT row for weekends & PH up to max. of 10 hours

Use OT row to enter max 2 hours OT during workweek and up to max. of 10 hours on weekends & PH

10

No FOT or OT entries allowed during workweek. Up to max 10 hours allowed on weekends & PH

AL Annual Leave
RR Rest & Recreation
SL Sick Leave
CL Compassionate Leave
UL Unpaid Leave

You might also like