Cost - Code Data Date PR.01 PR.02 27-Jan-12 SC.01 27-Jan-12 SC.02 27-Jan-12 SC.03 27-Jan-12

This document contains cost and schedule data for 5 cost codes related to a construction project. It includes budgeted costs, actual costs to date, estimates to complete, and physical progress for each code. The total budgeted cost is $19,838 and to date $471 has been spent, with estimates to complete of $21,829 bringing the total estimated cost to $22,300, a variance of $2,462 over budget.

Uploaded by

Zitheeq Umar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views18 pages

Cost - Code Data Date PR.01 PR.02 27-Jan-12 SC.01 27-Jan-12 SC.02 27-Jan-12 SC.03 27-Jan-12

This document contains cost and schedule data for 5 cost codes related to a construction project. It includes budgeted costs, actual costs to date, estimates to complete, and physical progress for each code. The total budgeted cost is $19,838 and to date $471 has been spent, with estimates to complete of $21,829 bringing the total estimated cost to $22,300, a variance of $2,462 over budget.

Uploaded by

Zitheeq Umar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Cost_Code

PR.01
PR.02
SC.01
SC.02
SC.03

Description
Pumps
Other Equipemets
Engineering and Surveys
Civil & Building Works
Mechanical Works

cost_Codes not assigned on the schedule

Data Date
27-Jan-12

27-Jan-12
27-Jan-12
27-Jan-12
27-Jan-12

Physical_Complete
0.00%
0.00%
0.00%
7.25%
11.30%

Start

Baseline
Finish

15-Jan-12

14-Feb-12

3-May-12

4-Jun-12

1-Jan-12
1-Jan-12
29-Jan-12

15-Jan-12
29-Jan-12
26-Feb-12

Forecast
Start
15-Jan-12
3-May-12
1-Mar-12
1-Jan-12
1-Jan-12

Forecast
Finish
14-Feb-12
4-Jun-12
15-Apr-12
29-Mar-12
26-Feb-12

Cost_Code_L1
PR
PR
SC
SC
SC

Cost_Code_L2
PR.01
PR.02
SC.01
SC.02
SC.03

scope
orig
orig
orig
orig
orig

Description
Pumps
Other Equipemets
Engineering and Surveys
Civil & Building Works
Mechanical Works

BAC
$
$
$
$
$

5,000
9,000
2,300
1,000
2,538

AC
$
$
$
$
$

ETC
$
$
$
$
$

EAC
$
$
$
$
$

5,000
9,000
2,300
1,000
2,538

Start
15-Jan-12
3-May-12
1-Jan-12
1-Jan-12
29-Jan-12

Finish
14-Feb-12
4-Jun-12
15-Jan-12
29-Jan-12
26-Feb-12

OD
31
33
15
29
29

28-Jan-12
2258
0
2300
966
0

28-Feb-12
5000
0
2300
1000
2538

28-Mar-12
5000
0
2300
1000
2538

28-Apr-12
5000
0
2300
1000
2538

28-May-12
5000
7091
2300
1000
2538

28-Jun-12
5000
9000
2300
1000
2538

28-Jul-12
5000
9000
2300
1000
2538

28-Aug-12
5000
9000
2300
1000
2538

28-Sep-12
5000
9000
2300
1000
2538

28-Oct-12
5000
9000
2300
1000
2538

28-Nov-12
5000
9000
2300
1000
2538

28-Dec-12
5000
9000
2300
1000
2538

28-Jan-13
5000
9000
2300
1000
2538

28-Feb-13
5000
9000
2300
1000
2538

Cost_Code
PR.01
PR.02
SC.01
SC.02
SC.03

scope
orig
orig
orig
orig
orig

Description
Pumps
Other Equipemets
Engineering and Surveys
Civil & Building Works
Mechanical Works

BAC
$
$
$
$
$

5,000
9,000
2,300
1,000
2,538

AC
$
$
$
$
$

100
256
100
5
10

ETC
$
$
$
$
$

5,900
8,744
2,200
995
3,990

EAC
$
$
$
$
$

6,000
9,000
2,300
1,000
4,000

Data Date
Progress
28-Jan-12 0.00%
28-Jan-12 0.00%
28-Jan-12 0.00%
28-Jan-12 7.25%
28-Jan-12 11.30%

Start
15-Jan-12
3-May-12
1-Mar-12
1-Jan-12
1-Jan-12

Finish
14-Feb-12
4-Jun-12
15-Apr-12
29-Mar-12
26-Feb-12

OD
31
33
46
89
57

28-Jan-12
100
256
100
5
10

28-Feb-12
6000
0
0
663
4000

28-Mar-12
6000
0
1400
989
4000

28-Apr-12
6000
0
2300
1000
4000

28-May-12
6000
7091
2300
1000
4000

28-Jun-12
6000
9000
2300
1000
4000

28-Jul-12
6000
9000
2300
1000
4000

28-Aug-12
6000
9000
2300
1000
4000

28-Sep-12
6000
9000
2300
1000
4000

28-Oct-12
6000
9000
2300
1000
4000

28-Nov-12
6000
9000
2300
1000
4000

28-Dec-12
6000
9000
2300
1000
4000

28-Jan-13
6000
9000
2300
1000
4000

28-Feb-13
6000
9000
2300
1000
4000

Cost_Code

PR
PR.01
PR.02
SC
SC.01
SC.02
SC.03

Description
Original Scope of Work
Procurement and Logistics
Pumps
Other Equipemets
Sub-Contracts
Engineering and Surveys
Civil & Building Works
Mechanical Works
Approved Variantion
Total

BAC

Original Budget

Physical progress

$
$
$
$
$
$
$
$

19,838
14,000
5,000
9,000
5,838
2,300
1,000
2,538

19,838

0.00%
0.00%
0.00%
7.25%
11.30%

BCWP

ACWP

ETC

EAC

Variance

Earned Cost

Actual cost

Estimate
to Complete

Estimation
at completion

Variance
at completion
[BAC-BAC]

$
$
$
$
$
$
$
$

359
359
72
287

$
$
$
$
$
$
$
$

471
356
100
256
115
100
5
10

$
$
$
$
$
$
$
$

359

471 $

21,829
14,644
5,900
8,744
7,185
2,200
995
3,990

$
$
$
$
$
$
$
$

21,829 $

22,300
15,000
6,000
9,000
7,300
2,300
1,000
4,000

$
$
$
$
$
$
$
$
$
22,300 $

(2,462)
(1,000)
(1,000)
(1,462)
(1,462)
(2,462)

Jan-12

Budget
actual

Feb-12

Jan-12
5,524
471

Mar-12

Feb-12
10,838
10,663

Apr-12

Mar-12
10,838
12,389

May-12

Apr-12
10,838
13,300

May-12
17,929
20,391

Jun-12

Jul-

12

Cost Curve
Budget

Jun-12

Jun-12
19,838
22,300

Jul-12

Jul-12
19,838
22,300

actual

Aug-12

Aug-12
19,838
22,300

Sep-12

Sep-12
19,838
22,300

Oct-12

Oct-12
19,838
22,300

Nov-12

Nov-12
19,838
22,300

Dec-12

25,000
20,000
15,000
10,000
5,000

Nov-12

Dec-12

Dec-12
19,838
22,300

Jan-13

Jan-13
19,838
22,300

Feb-13

Feb-13
19,838
22,300