Work Programme (Project Management)
Work Programme (Project Management)
TASK
Period Highlight:
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
35
42
47
51
55
60
63
64
Actual
% Complete
PLAN
PLAN ACTUAL ACTUAL PERCENT
START DURATION START DURATIONCOMPLETE PERIODS (WEEK)
1 2
1 Development
2
Land Survey
Plan
Plan design
2
Engineering
2
Bidding
3
Permits
7
Site Planning
Grading
8
Excavation
10
Install drain tile and grav 12
Backfilling
14
Final grading
18
Utilities
Rough in main sewer
20
Rough in water main
21
Rough in electrical main 22
Foundation
Set forms for foundation 23
Set steel for foundation 26
Pour foundation
29
Strip foundation
30
Framing
Set sill plates
31
Sheath first floor
33
Build first floor walls (except
35
Set 2nd floor joists
37
Sheath 2nd floor
39
Build 2nd floor walls (except
41
Dry In
43
Exterior Finishes
51
Interior Finishes
Cabinetry & Countertops 67
Interior Trim & Stairs
68
Tile & Ceramics
70
Wall Finishes
73
Door & Closet Hardware 77
Bath Hardware
78
Appliances
79
Landscaping and Grounds80Work
Final Acceptance
80
11
13
15
19
20
21
22
23
27
30
31
31
33
35
37
39
41
43
16
51
20
67
68
70
4
1
1
1
1
2
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
70%
50%
50%
50%
0%
0%
0%
0%
0%
0%
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80