0% found this document useful (0 votes)
504 views1 page

EASA Part M Training Programme

The 2-day EASA Part M training programme provides a holistic understanding of the EASA Part M continuing airworthiness requirements, including the purpose and structure of Part M, the relationship between Part M and other regulations such as Part 66, Part 145, and Part 147, and the technical requirements and implementation strategies of Part M. The training is suitable for aircraft owners, operators, and maintenance personnel new to or wanting to improve their knowledge of Part M. Upon completing the programme, participants will understand the key aspects of Part M and be able to outline strategies for successful implementation. Related more practical programmes on continuing airworthiness management and aircraft maintenance management are also available.

Uploaded by

budiaero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
504 views1 page

EASA Part M Training Programme

The 2-day EASA Part M training programme provides a holistic understanding of the EASA Part M continuing airworthiness requirements, including the purpose and structure of Part M, the relationship between Part M and other regulations such as Part 66, Part 145, and Part 147, and the technical requirements and implementation strategies of Part M. The training is suitable for aircraft owners, operators, and maintenance personnel new to or wanting to improve their knowledge of Part M. Upon completing the programme, participants will understand the key aspects of Part M and be able to outline strategies for successful implementation. Related more practical programmes on continuing airworthiness management and aircraft maintenance management are also available.

Uploaded by

budiaero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WING ENGINEERING LIMITED | 2015 TRAINING BROCHURE EXTRACT

EASA PART M: CONTINUING AIRWORTHINESS REQUIREMENTS

PROGRAMME REFERENCE:

PROGRAMME DURATION:

EPM

2 Days - 12 Training Hours

PROGRAMME PRE-REQUISITES:

PROGRAMME AVAILABILITY:

None.

SCHEDULED TRAINING: Available View dates here

ONSITE TRAINING: Available; Standard & Abridged

PROGRAMME SYNOPSIS:
The

EASA

Part

designed

to

training

provide

qualitative but

holistic

programme

has

participants

been

with

understanding

of

ONLINE TRAINING: Available from September 2015

a
the

PROGRAMME FEE:

purpose, structure, and requirements of the EASA


Part

implementing

rules

including

AMCs

and

GMs. The relationship between Part M, Part 66,

SCHEDULED TRAINING: 750 per participant


ONSITE TRAINING: Please contact us for a quote

Part 145, and Part 147 is also covered.


ONLINE TRAINING: To be confirmed

KEY TOPICS:
WHO SHOULD ATTEND?

Continuing Airworthiness Regulations


EASA Part M: Purpose & Structure

Aircraft owners, operators, form 4 post holders,

EASA Part M: Technical Reqs, AMCs, & GMs

accountable managers, & continuing airworthiness

Strategies for Successful Implementation

management

personnel.

In

particular,

the

programme is suitable for personnel who are new


to the subject matter, or those who are already

BENEFITS OF ATTENDING:

familiar with the fundamentals of the subject,


By the end of the programme, participants will

but

be able to:

knowledge, and practical understanding.

1.

Outline

the

purpose

and

structure

of

the

between

Part

M,

Part M implementing rules.


2.

Outline

the

relationship

4.

Provide

qualitative

formal

training

to

improve

their

RELATED PROGRAMMES:
The following programmes provide the practical

Part 66, Part 145, and Part 147.


3.

require

analysis

and

knowledge

and

skills

for

the

day-to-day

evaluation of the technical requirements of

implementation of Part M:

Part M.

CONTINUING AIRWORTHINESS MANAGEMENT (CAM) for

Outline

strategies

for

the

successful

implementation of Part M.

CAMOs i.e. Part M Subpart G Organisations.


AIRCRAFT
MROs

i.e.

MAINTENANCE
Part

Organisations.

FOR FURTHER INFORMATION PLEASE CONTACT US

145

MANAGEMENT
and

Part

(AMM)

for

Subpart

You might also like