InstruCalc Process Engineering

The document appears to be a report from I-Size Solutions Inc regarding a crude expansion project for Asco Refining. It provides input data for a water hammer analysis of a liquid flow line including fluid properties, operating conditions, pipe dimensions and a selected closing time. The output data includes a critical closing time of 2.999 seconds and estimated wave pressure and thrust at that time, as well as a minimum closing time to remain within the maximum allowable pressure.

Uploaded by

georgD2010
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views

InstruCalc Process Engineering

The document appears to be a report from I-Size Solutions Inc regarding a crude expansion project for Asco Refining. It provides input data for a water hammer analysis of a liquid flow line including fluid properties, operating conditions, pipe dimensions and a selected closing time. The output data includes a critical closing time of 2.999 seconds and estimated wave pressure and thrust at that time, as well as a minimum closing time to remain within the maximum allowable pressure.

Uploaded by

georgD2010
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

I-Size Solutions Inc

Asco Refining
Project . Crude Expansion
Water Hammer - Liquid flow
Tag number

Input Data
Fluid
Liquid flow
Max allowable pressure
Flow temperature
Operating pressure
SG @ flow conditions
Liquid bulk modulus
Pipe elastic mod
Line length
Pipe inside diameter
Pipe wall thickness
Pipe material
Selected closing time

Water
400 litre/s
1000 kPag
100 degC
900 kPag
1
100 kpa
196083838 kpa
15 m
40 mm
6 mm
Carbon Steel
secs

Output data
Critical closing time conditons
Critical closing time
Wave velocity
Wave pressure
Estimated thrust

2.999 secs
10 m/s
4078 kPag
407.3 kg

Closing time for allowable pressure


Minimum closing time

95.32 secs

Selected closing time conditions


Wave pressure
Estimated thrust

Note
12
34
56

kPag
kg

werfg

1/7/2015