Podul Cairo: Vedere de Ansamblu

The document discusses the Cairo Bridge project in Illinois, US. The bridge had insufficiently resistant concrete pillars to seismic activity. Sika provided a solution to increase seismic resistance by wrapping the pillars with SikaWrap composite fabric. Over 9,400 square meters of SikaWrap-100 G and 9,100 liters of Sikadur-300 epoxy were applied in 4 to 14 layers to the pillars, and protected with Sikagard 670 from UV and temperature. The wrapping solution successfully reinforced the pillars to withstand seismic forces.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views10 pages

Podul Cairo: Vedere de Ansamblu

The document discusses the Cairo Bridge project in Illinois, US. The bridge had insufficiently resistant concrete pillars to seismic activity. Sika provided a solution to increase seismic resistance by wrapping the pillars with SikaWrap composite fabric. Over 9,400 square meters of SikaWrap-100 G and 9,100 liters of Sikadur-300 epoxy were applied in 4 to 14 layers to the pillars, and protected with Sikagard 670 from UV and temperature. The wrapping solution successfully reinforced the pillars to withstand seismic forces.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 10

Construction

Podul Cairo

Vedere de ansamblu

Construction

Podul Cairo
Proiect:
Autostrada I-57 - Cairo City Illinois, US
Structura compozita cu
grinzi
continue cu inima plina si tablier din beton armat
Stalpi din beton armat cu diametrul de 1,50 m

Construction

Podul Cairo
Problema:

Rezistenta insuficienta a stalpilor podului la


actiuni seismice
Primul pod consolidat in Mississippi Valley
Program al D.O.T. Illinois

Construction

Podul Cairo
Solutia Sika:
Cresterea rezistentei la actiuni seismice a
stalpilor podului folosind tesatura compozita
SikaWrap
SikaWrap-100 G
Total
Sikadur-300

: 9400 m2
: 9100 l

Aplicare umeda - Wet Lay-Up-Saturator

Construction

Podul Cairo
Solutia Sika
Numarul de straturi aplicate
min. = 4
max. = 14
Protectia tesaturii aplicate impotriva
ultravioletelor si a temperaturii, folosind Sikagard
670

Construction

Podul Cairo

Aplicarea amorsei

Construction

Podul Cairo

Imbibarea tesaturii

Construction

Podul Cairo

Aplicarea SikaWrap

Construction

Podul Cairo

Aplicarea SikaWrap

Construction

Podul Cairo

Netezirea tasaturii SikaWrap