Redni Broj Opis Pozicije Jedinica Mere Jedinična Cena (Din) (Din)

The document provides specifications for three construction jobs: 1) Manufacturing and installing a single-wing aluminum door with mineral wool insulation and EPDM rubber sealing. The door is to have a handle, lock, and hinges. 2) Covering a building roof with corrugated aluminum sheeting mounted on a wood substructure. 3) Covering a chimney with galvanized sheet metal extending at least 20cm from the chimney.

Uploaded by

Miljan Kovacevic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

Redni Broj Opis Pozicije Jedinica Mere Jedinična Cena (Din) (Din)

The document provides specifications for three construction jobs: 1) Manufacturing and installing a single-wing aluminum door with mineral wool insulation and EPDM rubber sealing. The door is to have a handle, lock, and hinges. 2) Covering a building roof with corrugated aluminum sheeting mounted on a wood substructure. 3) Covering a chimney with galvanized sheet metal extending at least 20cm from the chimney.

Uploaded by

Miljan Kovacevic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Redni

broj

OPIS POZICIJE

3.

Izrada i ugradnja AL jednokrilnih vrata, krilo vrata je puno, dvostruko oblozeno AL limom sa ispunom od mineralne vune debljine 20 mm, dihtovati
EPDM gumom, eloksirati u prirodnoj
boji aluminijuma.Krilo snabdeti rukohvatom, elzet bravom sa 3 kljuca i sarke.Obracun se vrsi po ugradjenom
komadu.
-dimenzija 70 x 205
-dimenzija 90/205

Jedinica koliina
mere

kom

Jedinina
cena
( din)

1.

2.

LI M AR S K I R AD O V I
Opivanje strehe objekta AL lamperijom razvijene irine 75 cm.U cenu
uraunati izradu podkonstru-kcije od
letava 3 x 5 cm. Obraun se vrsi po
m2.
Opivanje dimnjaka pocinkovanim
limom , debljina lima 0,60 mm.Lim
uz
dimnjak
podii
min
20
cm.Obracun se vrsi po ugradjenom
komadu.

m2

kom

2
UKUPNO

XII
1.

2.

MOLERSKO-FARBARSKI RADOVI
Bojenje zidova i plafona disperzionom bojom u 2 premaza, uz prethodno gletovanje .U cenu uracunati
upotrebu pomocne skele. Obraun se
vrsi po m2.
Bojenje postojeih prozora i vrata
preko stare boje u 2 premaza uz prethodno kitiranje i bruenje. Obraun
se vrsi po obojenom komadu

m2

kom
U K U PN O

XIII
1.

VODOVOD I KANALIZACIJA
Nabavka i ugradnja PE vodovodnih
cevi za unutranji razvod u sanitarnom voru sa svim pripadajuim
komadima i spojnim materijalom.
Obraun se vri po kompletu.

kom

( din)

1
2
UKUPNO

XI

UKUPNO

121.572,oo