0% found this document useful (0 votes)
11 views

Procedure: Field Name User Action and Values Comment

This document provides instructions for creating two data views in SAP IBP: 1) The YDP_DV_FORECAST data view is for forecasting and includes key figures for historical sales, corrections, overrides, corrected history, statistical forecasts, and manual forecasts. 2) The YDP_DV_MACRO data view is used to consolidate all inputs to generate a final demand plan and includes key figures for statistical forecasts, manual forecasts, local adjustments, additional demand, central adjustments, and the demand plan. The instructions describe setting up fields and assigning key figures to each data view.

Uploaded by

ddukem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Procedure: Field Name User Action and Values Comment

This document provides instructions for creating two data views in SAP IBP: 1) The YDP_DV_FORECAST data view is for forecasting and includes key figures for historical sales, corrections, overrides, corrected history, statistical forecasts, and manual forecasts. 2) The YDP_DV_MACRO data view is used to consolidate all inputs to generate a final demand plan and includes key figures for statistical forecasts, manual forecasts, local adjustments, additional demand, central adjustments, and the demand plan. The instructions describe setting up fields and assigning key figures to each data view.

Uploaded by

ddukem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Procedure

Go to the Data View tab page and enter the following values:

Field name

User action and values

Comment

Data View

YDP_DV_FORECAST

Data view Descr.

FORECASTING

Status

Changeable

TB Profile ID
(Future)

YDP_MON24

24 months in future, your


time bucket profile.

TB Profile ID
(History)

YDP_MON24

24 months in history, your


time bucket profile.

Visible

/ from 01.05.2009 (first period)

choose enter if the field is


not editable

Input

/ from 01.05.2009 (first period)

choose enter if the field is


not editable

Period Information

Title
Title 1stGridI

DPA_DV_FORECASTING

Unit Column
Unit column
2

Unit of measure visible

Choose Continue to go to the Key figures tab page and assign the following key figures from the
planning book area at right side to the data view area at the left side via drag and drop:

Key Figures

Description

ZY93_BK91

Historical Sales without additional demand

ZY93_BK04

Historical Sales Correction

ZY93_BK05

Historical Sales Override

ZY93_BK06

Corrected Sales History

ZY93_BK07

Statistical Forecast

ZY93_BK08

Manual Forecast

You can use the up and down pushbuttons to move key figure up and down to
change the key figure display sequence in the data view.
3

Choose complete.

Data View - YDP_DV_MACRO

Use
This data view is used to consolidate all input to get the final demand plan which can be released to ECC
or SNP for further planning.

Procedure
1

Go to the Data View tab page and enter the following values:

Field name

User action and values

Comment

Data View

YDP_DV_MACRO

Data view Descr.

MACRO

Status

Changeable

TB Profile ID
(Future)

YDP_MON24

24 months in future, your


time bucket profile.

TB Profile ID
(History)

YDP_MON24

24 months in history, your


time bucket profile.

Visible

/ from 01.05.2009 (first period)

choose enter if the field is


not editable

Input

/ from 01.05.2009 (first period)

choose enter if the field is


not editable

Period Information

Title
Title 1stGridI

DPA_DV_MACRO

Unit Column
Unit column
2

Unit of measure visible

Choose continue to go to the Key figures tab page and assign the following key figures from the
planning book area at right side to the data view area at the left side via Drag and drop:

Key Figures

Description

ZY93_BK07

Statistical Forecast

ZY93_BK08

Manual Forecast

ZY93_BK10

Local Planners Forecast Adjustment

ZY93_BK09

Additional demand

ZY93_BK11

Central Planners Forecast Adjustment

ZY93_BK12

Demand Plan

You can use the up and down pushbuttons to move key figure up and down to
change the key figure display sequence in the data view.
3

Choose complete.

You might also like