C-1002 (Desulpharization Vessel) : Dated Ndts Performed Extent of Inspection
C-1002 (Desulpharization Vessel) : Dated Ndts Performed Extent of Inspection
DATED
EXTENT OF
INSPECTION
NDTs PERFORMED
04-DEC-2002
Initial inspection
before
commisioning
VI
25-MAR-2006
16-JAN-2009
Top Bed
19-JAN-2012
Top Bed
11-JAN-2014
pharization Vessel)
OBSERVATIONS
BOTTOM GRID
1. Crack in shell to plate welding at east and west side of the north side
grid support beam.
2. 2mm deep pit in capping of bottom head to circumferential weld.
3. Approx. 10'long shell portion adjacent to outlet pipe was found filled
up by welding.
WORK DONE
1. Grinding followed by repair welding carried out at
cracked support beam weld
2. Grinding of pit revealed a slight linear indicaiton.
However, not grinded further.