C-1002 (Desulpharization Vessel) : Dated Ndts Performed Extent of Inspection

This documents is a reference document for inspections previously performed in previous years regarding thinning, pitting, sulpharization,

Uploaded by

William Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

C-1002 (Desulpharization Vessel) : Dated Ndts Performed Extent of Inspection

This documents is a reference document for inspections previously performed in previous years regarding thinning, pitting, sulpharization,

Uploaded by

William Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

C-1

DATED

EXTENT OF
INSPECTION

NDTs PERFORMED

04-DEC-2002

Initial inspection
before
commisioning

VI

25-MAR-2006

Top and Bottom Bed VI, MPT of 04shell T-joints

16-JAN-2009

Top Bed

VI, MPT of accessible Tjoints (~02)

19-JAN-2012

Top Bed

VI, MPT of 03 T-joints, M1


& M3 nozzle welds

11-JAN-2014

Top and Bottom Bed

VI, MPT of ~90% weld


joints

C-1002 (Desulpharization Vessel)


OBSERVATIONS
TOP GRID

1. 01 pinhole in ladder rung weld


2. 02 pits having upto 2~3 mm depth at north side shell wall.
1. Slight pitting at scattered locations (depth ~0.5mm)
2. 02 nos. deep pits (3.8mm and 2.5mm) at east side of shell near M3
manway.
3. Minimum thickness of 50.2 mm recorded (design 52mm)
1. 03 pinholes in shell to top dish end welds.
2. other observations of pitting and pinhole at ladder rung weld found as
such.

1. Gas pore in gas inlet nozzle to dish end nozzle.


2. porosity in shell Manway nozzle (M4) at 02 locaitons.
3. 03 crater cracks in , Manway nozzle (M3), thermowell nozzle (N8) and gas outlet noz

pharization Vessel)
OBSERVATIONS
BOTTOM GRID
1. Crack in shell to plate welding at east and west side of the north side
grid support beam.
2. 2mm deep pit in capping of bottom head to circumferential weld.
3. Approx. 10'long shell portion adjacent to outlet pipe was found filled
up by welding.

pinhole in ladder rung weld


to 2~3 mm depth at north side shell wall.

gas inlet nozzle to dish end nozzle.


ll Manway nozzle (M4) at 02 locaitons.
zzle (M3), thermowell nozzle (N8) and gas outlet nozzle.

WORK DONE
1. Grinding followed by repair welding carried out at
cracked support beam weld
2. Grinding of pit revealed a slight linear indicaiton.
However, not grinded further.

1. Pinholes removed by grinding of up to 02mm


1. Deep grinding carried out at manway (M4) and
Level 2 FFS assesment carried out and found ok.
2. All other defects found satisfactory