The document provides details for the provision of hook-up, commissioning, and topside major maintenance services from 2013 to 2018. It includes sections on the project scope of work, turnaround scope of work for two areas (TKP-A and WLDP-C), job method statements with man-hours, manpower and material requirements, procedures, drawings, and other documentation required for the planned maintenance.

Uploaded by

anjangandak2932
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
294 views64 pages

TOC-TA Wpack Rev.1

The document provides details for the provision of hook-up, commissioning, and topside major maintenance services from 2013 to 2018. It includes sections on the project scope of work, turnaround scope of work for two areas (TKP-A and WLDP-C), job method statements with man-hours, manpower and material requirements, procedures, drawings, and other documentation required for the planned maintenance.

Uploaded by

anjangandak2932
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 64

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR

MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:
SECTION

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001
WORKPACK ITEM DESCRIPTION (TURNAROUND)

June 2, 2015
BOOK

Introduction
Project Summary & Overall Scope of Work
Organizational Charts
Emergency Response Plan

Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3

Turnaround Scope of Work (SOW)


Detailed Turnaround Scope of Work
TKP-A
WLDP-C
Inspection Test Plan (Inspection Methodology)
Pre-commissioning & Commissioning Procedure

Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3

3.3
3.4

Job Method Statement (Jobcards) with Manhours


Individual Activity Job Method Statement (Jobcards)
with Manhours - TKP-A
Individual Activity Job Method Statement (Jobcards)
with Manhours - WLDP-C
Manhours Summary List - TKP-A
Manhours Summary List - WLDP-C

Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3

4.1
4.2

Manpower Mobilization Plan (Turnaround)


Manpower Loading & List (Turnaround) - TKP-A
Manpower Loading & List (Turnaround) - WLDP-C

Book 1 of 3
Book 1 of 3
Book 1 of 3

5.1
5.2

Blind/Spading List
TA Physical Isolation List & Spading Plan (P&ID Mark-up) - TKP-A
TA Physical Isolation List & Spading Plan (P&ID Mark-up) - WLDP-C

Book 1 of 3
Book 1 of 3
Book 1 of 3

6.1
6.2
6.3
6.4

Material & Consumable List


Overall Material Take-off (TKP-A)
Overall Material Take-off (WLDP-C)
Material Take-off (TA) and Consumable List - TKP-A
Material Take-off (TA) and Consumable List - WLDP-C

Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3

7.1
7.2
7.3
7.4

Equipment & Tools Loading (Turnaround)


Equipment & Tools Loading Detail List (TKP-A)
Equipment & Tools Loading Detail List (WLDP-C)
Equipment Loading Plan with Layout (TKP-A)
Equipment Loading Plan with Layout (WLDP-C)

Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3
Book 1 of 3

8.1
8.2

Project Schedule
Overall Offshore HUC Schedule (TKP-A & WLDP-C)
Turnaround Schedule (TKP-A & WLDP-C)

Book 2 of 3
Book 2 of 3
Book 2 of 3

9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13

Site Specific Procedures (Turnaround)


Project Quality Plan
Lifting & Rigging Procedure
Scaffolding Procedure
Cold Cutting Procedure
Oxy-Acetylene Cutting Procedure
Bolt Tightening Procedure
Piping Fabrication & Installation Procedure
Guideline for Installation of Final Tie-in Golden Joint
Equipment, Instrument and Electrical Installation Procedure
Radiography Testing Procedure
Magnetic Particle Inspection Procedure
Ultrasonic Testing Procedure
Piping Flushing & Hydrotesting Procedure

Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3

1.0
1.1
1.2
1.3
2.0
2.1

2.2
2.3
3.0
3.1
3.2

4.0

5.0

6.0

7.0

8.0

9.0

Page 1 of 64

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:
SECTION
9.14
9.15
10.0
11.0
11.1

11.2

12.0
12.1
12.2
12.3
12.4
13.0

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001
WORKPACK ITEM DESCRIPTION (TURNAROUND)
System Reinstatement Testing & Nitrogen Purging Procedure
Repair & Touch-up Painting Procedure

June 2, 2015
BOOK
Book 2 of 3
Book 2 of 3

Job Hazard Analysis (JHA)

Book 2 of 3

Drawing (Turnaround)
TKP-A
Process & Instrumentation Diagram
Piping
Instrument
Electrical

Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3
Book 2 of 3

WLDP-C
Process & Instrumentation Diagram
Piping
Instrument
Electrical

Book 3 of 3
Book 3 of 3
Book 3 of 3
Book 3 of 3
Book 3 of 3

Site Visit Reports


Structural
Mechanical
Piping
Electrical & Instrument

Book 3 of 3
Book 3 of 3
Book 3 of 3
Book 3 of 3
Book 3 of 3

Bolt Torqueing & Flange Management (Turnaround)

Book 3 of 3

Page 2 of 64

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

1.0 Introduction
1.1 Project Summary & Overall Scope of Work
1.2 Organizational Charts
1.3 Emergency Response Plan

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

1.0 Introduction
1.1 Project Summary & Overall Scope of Work

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

1.0 Introduction
1.2 Organizational Charts

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

1.0 Introduction
1.3 Emergency Response Plan

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

2.0

Turnaround Scope of Work (SOW)


2.1 Detailed Turnaround Scope of Work
2.2 Inspection Test Plan (Inspection
Methodology)
2.3 Pre-commissioning & Commissioning
Procedure

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

2.0

Turnaround Scope of Work (SOW)


2.1 Detailed Turnaround Scope of Work
TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

2.0

Turnaround Scope of Work (SOW)


2.1 Detailed Turnaround Scope of Work
WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

2.0

Turnaround Scope of Work (SOW)


2.2 Inspection Test Plan (Inspection
Methodology)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

2.0

Turnaround Scope of Work (SOW)


2.3 Pre-commissioning & Commissioning
Procedure

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.1 Individual Activity Job Method Statement
(Jobcards) with Manhours - TKP-A
3.2 Individual Activity Job Method Statement
(Jobcards) with Manhours - WLDP-C
3.3 Manhours Summary List - TKP-A
3.4 Manhours Summary List - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.1 Individual Activity Job Method Statement
(Jobcards) with Manhours - TKP-A
General

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.1 Individual Activity Job Method Statement
(Jobcards) with Manhours - TKP-A
Piping

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.1 Individual Activity Job Method Statement
(Jobcards) with Manhours - TKP-A
Instrument

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.1 Individual Activity Job Method Statement
(Jobcards) with Manhours - TKP-A
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.2 Individual Activity Job Method Statement
(Jobcards) with Manhours - WLDP-C
General

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.2 Individual Activity Job Method Statement
(Jobcards) with Manhours - WLDP-C
Piping

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.2 Individual Activity Job Method Statement
(Jobcards) with Manhours - WLDP-C
Instrument

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.2 Individual Activity Job Method Statement
(Jobcards) with Manhours - WLDP-C
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.3 Manhours Summary List - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

3.0

Job Method Statement (Jobcards) with


Manhours
3.4 Manhours Summary List - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

4.0

Manpower Mobilization Plan (TA)


4.1 Manpower Loading & List (TA) - TKP-A
4.2 Manpower Loading & List (TA) - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

4.0

Manpower Mobilization Plan (TA)


4.1 Manpower Loading & List (TA)
TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

4.0

Manpower Mobilization Plan (TA)


4.2 Manpower Loading & List (TA)
WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

5.0

Blind/Spading List
5.1 TA Physical Isolation List & Spading Plan
(P&ID Mark-up) - TKP-A
5.2 TA Physical Isolation List & Spading Plan
(P&ID Mark-up) - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

5.0

Blind/Spading List
5.1 TA Physical Isolation List & Spading Plan
(P&ID Mark-up) - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

5.0

Blind/Spading List
5.2 TA Physical Isolation List & Spading Plan
(P&ID Mark-up) - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

6.0
6.1
6.2
6.3
6.4

Material & Consumable List


Overall Material Take-off (TKP-A)
Overall Material Take-off (WLDP-C)
Material Take-off (TA) and Consumable List
- TKP-A
Material Take-off (TA) and Consumable List
- WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

6.0

Material & Consumable List


6.1 Overall Material Take-off (TKP-A)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

6.0

Material & Consumable List


6.2 Overall Material Take-off (WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

6.0

Material & Consumable List


6.3 Material Take-off (TA) and Consumable List
- TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

6.0

Material & Consumable List


6.4 Material Take-off (TA) and Consumable List
- WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

7.0
7.1
7.2
7.3
7.4

Equipment & Tools Loading


Equipment & Tools Loading Detail List
(TKP-A)
Equipment & Tools Loading Detail List
(WLDP-C)
Equipment Loading Plan with Layout (TKPA)
Equipment Loading Plan with Layout
(WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

7.0

Equipment & Tools Loading


7.1 Equipment & Tools Loading Detail List
(TKP-A)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

7.0

Equipment & Tools Loading


7.2 Equipment & Tools Loading Detail List
(WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

7.0

Equipment & Tools Loading


7.3 Equipment Loading Plan with Layout (TKPA)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

7.0

Equipment & Tools Loading


7.4 Equipment Loading Plan with Layout
(WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

8.0

Project Schedule
8.1 Overall Offshore HUC Schedule (TKP-A &
WLDP-C)
8.2 Turnaround Schedule (TKP-A & WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

8.0

Project Schedule
8.1 Overall Offshore HUC Schedule (TKP-A &
WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

8.0

Project Schedule
8.2 Turnaround Schedule (TKP-A & WLDP-C)

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

9.0
9.1
9.2
9.3
9.4
9.5
9.6
9.7

Site Specific Procedures (Turnaround)


Project Quality Plan
Lifting & Rigging Procedure
Scaffolding Procedure
Cold Cutting Procedure
Oxy-Acetylene Cutting Procedure
Bolt Tightening Procedure
Piping Fabrication & Installation Procedure

9.8 Guideline for Installation of Final Tie-in


Golden Joint
9.9 Equipment, Instrument and Electrical
Installation Procedure
9.10 Radiography Testing Procedure
9.11 Magnetic Particle Inspection Procedure
9.12 Ultrasonic Testing Procedure
9.13 Piping Flushing & Hydrotesting Procedure
9.14 System Reinstatement Testing & Nitrogen
Purging Procedure
9.15 Repair & Touch-up Painting Procedure

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR


MAINTENANCE SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

10.0

Job Hazard Analysis

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.1 TKP-A
Process & Instrumentation Diagram
Piping
Instrument
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.1 TKP-A
Process & Instrumentation Diagram

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.1 TKP-A
Piping

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.1 TKP-A
Instrument

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.1 TKP-A
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.2 WLDP-C
Process & Instrumentation Diagram
Piping
Instrument
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.2 WLDP-C
Process & Instrumentation Diagram

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.2 WLDP-C
Piping

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.2 WLDP-C
Instrument

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

11.0
Drawing (Turnaround)
11.2 WLDP-C
Electrical

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
12.1
12.2
12.3
12.4

Site Visit Reports


Structural
Mechanical
Piping
Electrical & Instrument

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.1 Structural - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.1 Structural - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.2 Mechanical - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.2 Mechanical - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.3 Piping - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.3 Piping - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.4 Electrical & Instrument - TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

12.0
Site Visit Reports
12.4 Electrical & Instrument - WLDP-C

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

13.0

Bolt Torqueing & Flange Management


(Turnaround)
TKP-A

PROVISION OF HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE


SERVICES FOR YEAR 2013 - 2018

Contract No :
Work Order No:

PROVISION OF HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE


REJUVENATION PROJECT - PL381/210
CHO/2012/DFHD/193
DFHD/2015/042A/001

13.0

Bolt Torqueing & Flange Management


(Turnaround)
WLDP-C