Dailyreportfrom Site: Date 01.02.2013

The daily report from site number 32 at M/s Baldev alloys pvt. LTD summarizes communications, materials, staffing, and progress at the site on February 1st, 2013. Key updates include no communications or materials received, payments of contractor and refractory work required, and boiler and ESP construction work in progress including ducting, piping, and platform installations. The report was prepared and approved by site manager M.E. Manikandan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Dailyreportfrom Site: Date 01.02.2013

The daily report from site number 32 at M/s Baldev alloys pvt. LTD summarizes communications, materials, staffing, and progress at the site on February 1st, 2013. Key updates include no communications or materials received, payments of contractor and refractory work required, and boiler and ESP construction work in progress including ducting, piping, and platform installations. The report was prepared and approved by site manager M.E. Manikandan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILYREPORTFROM SITE

S.No:32

1.

Date 01.02.2013

Site: M/s Baldev alloys pvt. LTD.


Vwta020,VWHA052,053,054

Details of
communications
received on (E-mail,
Fax, Courier, Post, by
hand etc.,)

Nil.

2.

Details of communications sent to HO


on

Daily report ,guest house asset detail, C- form

3.

Details of consignments / materials


received from HO / others

Nil.

4.

Details of payments received from HO /


others

Nil.

5.

Attendance with details


:

MR.M.E.MANIKANDAN(2141)

5.1

Staff (VEESONS)

Mr. DINESH KUMAR.S (1832)

5.2

6.

Contract Workers (Contractor wise)

Important brief feedback about Fabrication


/ Erection / Commissioning (delay with
reference to schedule, major problems
etc.,)

Utkal Engineers:
Boiler: Supervisor:00 IB
00; Riger-02;grinder-0 Helper-05(Total=09)

1.contractor man power shortage

2. Radiography film required from con


3.customer side insert plates

7.

Materials, documents, payments urgently


required from HO with details

1. Utkal engg Contractor payment.

8.

Any urgent / important site complaints

UTKAL Engineering Should be


increasing his manpower.
Refractory contractor required
for 3XWHRB boiler ABC Ducts.

Site status:

VWTA020 BOILER:
Work started time: 08-00AM work end time: 8-00PM
1) Dividing chute Support erection work completed.
2) Air heater to esp ducting Support ground fit up Work
completed.
3) LP dosing piping erection work U/P.
4) Drum top level plat form hand rail work completed.
5) Integral piping supports erection work U/P.

ESP;
1) Sealing roof plates erection arrangement work U/P.

Prepared by (Name):

M.E.MANIKANDAN

Checked & Approved by (Name) :

M.E.MANIKANDAN

Signature:

Signature:

Staff No : 2141