Problem
Impact
Stage 4 East
Stage 4 West
Stage 3
Action
Who
When
1. Lay refractory
bricks around
the cone bottom
2. Cast the
intersection of
the cone and
feed pipe
3. Replace the
diptube
1. Lay refractory
bricks around
the cone
2. Replace the dip
tube
Production
KSD
Production
KSD
Methods
KSD
Production
KSD
Methods
KSD
1. Put castable
around the dip
tube
Production
KSD
1. Put castable
around the dip
tube
Production
KSD
Stage 2 East
1. Put castable
around the dip
tube
Production
KSD
Stage 1
South
Reduced
temperature hence
increase fuel
consumption
Reduced cyclone
collecting efficiency
Can lead to a
cyclone blockage
Reduced cyclone
collecting efficiency
Methods
KSD
Methods
Advice
after KSD
Stage 1
North
Damaged diptube
Production
3. Remove the
metal rod
1. Replace the
diptube
Methods
Advice
after KSD