Protection

Sector Energy PTI NC


Theodor Connor

Copyright Siemens AG 2008. All rights reserved.

Content

Protection principle
Network details
Network calculation

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 1

01.2008

Th. Connor

PTD SE PTI

Task of network protection

Protection of persons against the effects of short-circuits


Protection of operational equipment from destruction and damages
Maintaining the power system operation in case of failures

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 2

01.2008

Th. Connor

PTD SE PTI

Owner of high voltage networks


Public utility companies
Interconnected system, National network, Regional system, Urban network
Industrial companies
Steel, Cement, Chemistry, Automobile . . .
Power plants
Railways
Special systems
Airports, Hospitals, Testing stations, Ships . . .

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 3

01.2008

Th. Connor

PTD SE PTI

Voltage levels

Extra-high voltage
700 kV
360 kV
220 kV

Transmission

High voltage
150 kV
110 kV
60 kV

Medium voltage
30 kV
20 kV
10 kV
6 kV

Distribution

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 4

01.2008

Th. Connor

PTD SE PTI

System structure: meshed network

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 5

01.2008

Th. Connor

PTD SE PTI

System structure: radial network for public supply

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 6

01.2008

Th. Connor

PTD SE PTI

System structure: radial network in the industry

M
M
M

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 7

01.2008

Th. Connor

PTD SE PTI

Main components of electrical networks


Generator

Three-winding
transformer

Earth fault
compensation coil
Bus coupler

Double
busbar

Switch

Short-circuit current
limiting reactor

Cable

M
Motor

Substation

Filter circuit

Overhead
line

Shunt
reactor

Consumer
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 8

01.2008

Th. Connor

PTD SE PTI

Protection target

Fast

Selective

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 9

01.2008

Th. Connor

PTD SE PTI

Protected zone

Circuit-breaker
Current transformer

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 10

01.2008

Th. Connor

PTD SE PTI

Criteria indicating fault condition


I
U

I (t) = I sin t + e

t
T

Current

r
I> I>

Voltage

U<

Impedance

Z<

Phase angle

Power

r r
P Q

Frequency

I>>

I I dI
dt

U>

S(t)

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 11

01.2008

Th. Connor

PTD SE PTI

Overcurrent-time protection

Definite-time
overcurrentprotection

t2

t1
IN

I>

I >>

Inverse-time
overcurrent-protection

IN

I
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 12

01.2008

Th. Connor

PTD SE PTI

Differential protection
Line

Load condition

Istart - Iend = 0

I = 0

I 0

Fault condition

Istart - Iend 0

Busbar
IA

IB

Load condition

IC
IA

IA + IB + IC = 0
IB

Fault condition

IC

IA + IB + IC 0

I = 0

I 0

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 13

01.2008

Th. Connor

PTD SE PTI

Overvoltage - Undervoltage

Overvoltage
U>
UN
U<

Undervoltage

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 14

01.2008

Th. Connor

PTD SE PTI

Impedance protection

U
=Z
I

Load

Load

I
U

Load

U
=Z
I

Fault

Fault

<< Z

Load

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 15

01.2008

Th. Connor

PTD SE PTI

Distance protection

Z
X

= l Z'

Fault

Line

Line

Load

Z Load

UN
=
S Load

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 16

01.2008

Th. Connor

PTD SE PTI

Back-up protection I

t = 700 ms
t = 400 ms
t = 100 ms

I>

I>

I>

I>

I>

I>

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 17

01.2008

Th. Connor

PTD SE PTI

Back-up protection II

t = 400 ms
t = 100 ms

Z<

Z<

Z<

t = 1000 ms
t = 700 ms
t = 300 ms
t = 0 ms

I
I>

I
I>

I
I>
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 18

01.2008

Th. Connor

PTD SE PTI

Survey

Equipment - Type of protection

Line

Time-graded protection
Differential protection

Transformer

Differential protection
Time-graded protection

High voltage - Medium voltage

Busbar

Reverse interlock
Differential protection

Transformer

Fuse
Time-graded protection

Medium voltage - Low voltage

Time-graded protection
Overload protection

Motor

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 19

01.2008

Th. Connor

PTD SE PTI

History

1900
Electromechanical relays

1980
Analog electronical relays

1990
Numerical relays
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 20

01.2008

Th. Connor

PTD SE PTI

Network calculation

Power plant Transformer

Switching
station

Line

Load

Three-phase system

Single-line
diagram

Equivalent circuit in
symmetrical components

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 21

01.2008

Th. Connor

PTD SE PTI

Load flow
A non-linear task

U = f(I)

U UN

UN
I = f(U)

Iteration-process:
Current iteration
Newton - Raphson

PN, QN

I = f(U)

ILoad =

SN
3 UN
2

Z Load

U
= N
SN

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 22

01.2008

Th. Connor

PTD SE PTI

Short-circuit calculation

UN

Ik

Ohms Law:

I =

U
R

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 23

01.2008

Th. Connor

PTD SE PTI

Time characterictics of short-circuit currents


Fault occurrence in
the voltage maximum

Fault occurrence at
voltage zero

Remote
Fault location
t

Fault location
close to the
generator

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 24

01.2008

Th. Connor

PTD SE PTI

Fault currents

Current
Initial symmetrical
short-circuit
current

2 2 I "

2 2 Ia

Peak short-circuit
current

Breaking current

2 2 Ik Sustained short-

circuit current
Time
ta

Ik3
Ia
ip
Sk
Sa
Fault current contributions
Fault current distribution in the system
Ik2E
IEE
Ik2
Ik1
Ik max
Ik min
VDE
Preloaded short-circuit
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 25

01.2008

Th. Connor

PTD SE PTI

Types of short-circuits in three-phase systems

3-pole

2-pole

1-pole
For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 26

01.2008

Th. Connor

PTD SE PTI

Typical equipment data Network

S = 3 U I
"

ZSystem

U
=
S

System

"

UN

SK

IK

ZSystem

380 kV

26 GVA

40 kA

5.5

110 kV

1 GVA

5 kA

12.1

5 GVA

26 kA

2.4

350 MVA

10 kA

1.1

500 MVA

14 kA

0.8

500 MVA

28 kA

0.2

20 kV

10 kV

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 27

01.2008

Th. Connor

PTD SE PTI

Typical equipment data Transformer

U
ZTransf.= N uK
SN
Ztransf.

UN1/UN2

SN

uK

380/110 kV

300 MVA

15 %

110/20 kV

40 MVA

15 %

20/0.4 kV

630 kVA

6%

ZTransf.
380 kV

110 kV

20 kV

72

0.2

45

1.5
37.0

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 28

01.2008

Th. Connor

PTD SE PTI

Typical equipment data Line

ZLine = l (R1 + j X1)


ZLine

R1

X1

Z1

C1

Overhead line

0.03

+ j 0.25 /km

0.25 /km

14 nF/km

Overhead line
Cable

0.07
0.04

+ j 0.38 /km
+ j 0.11 /km

0.39 /km
0.12 /km

10 nF/km
400 nF/km

Overhead line
Cable

0.31
0.20

+ j 0.36 /km
+ j 0.13 /km

0.48 /km
0.24 /km

10 nF/km
300 nF/km

380 kV
110 kV

20 kV

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 29

01.2008

Th. Connor

PTD SE PTI

Data for a sample calculation


System

Transformer

Line A

Line B

F2

F1

3 GVA 110/20 kV
110 kV 40 MVA
15 %

5 km
0.2 /km
(0.5 /km)

System

5 km
0.2 /km
(0.5 /km)

(110 10 )
= 1.1

Transforme r

Cable
(Overhead line)

(20 10 ) = 0.15

(110 10 )
3 10
(20 10 ) 15 = 1.5
=
3

F3

40 10
Z

Line A

100

= 5 0.2 = 1.0

Line B

= 5 0.2 = 1.0

(2.5 )
(2.5 )

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 30

01.2008

Th. Connor

PTD SE PTI

Short-circuit current calculation Results

Cable

F1

F2

F3

I K3 =

I K3 =

I K3 =

1.1 20 10 3

3 [0.15 + 1.5 ]

Overhead line

(7.7 kA)

= 7.7 kA

1.1 20 10 3

3 [0.15 + 1.5 + 1.0 ]

1.1 20 10 3

= 4.8 kA

3 [0.15 + 1.5 + 1.0 + 1.0 ]

= 3.5 kA

(3.1 kA)

(1.9 kA)

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 31

01.2008

Th. Connor

PTD SE PTI

Short-circuit current calculation Results

System

Transformer

Line A

Line B

F2

F3

4.8 kA

3.5 kA

F1

7.7 kA
(7.7 kA)

(3.1 kA)

(1.9 kA)

Cable

Overhead line

For internal use only. / Copyright Siemens AG 2008. All rights reserved.

Page 32

01.2008

Th. Connor

PTD SE PTI