Earned Value Excel Template Simplified - XLSM

This document tracks blog posting submissions for 25 individuals over 29 weeks. It includes information such as physical progress, actual costs, budgeted costs, schedule variance, cost variance, schedule performance index, and cost performance index for each week. It also calculates estimated cost at completion and to-complete performance index for the overall project based on the weekly data. The document aims to monitor blog posting assignments and compare actual performance to the budget and schedule on a weekly basis.

Uploaded by

Soeghy Alie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
389 views40 pages

Earned Value Excel Template Simplified - XLSM

This document tracks blog posting submissions for 25 individuals over 29 weeks. It includes information such as physical progress, actual costs, budgeted costs, schedule variance, cost variance, schedule performance index, and cost performance index for each week. It also calculates estimated cost at completion and to-complete performance index for the overall project based on the weekly data. The document aims to monitor blog posting assignments and compare actual performance to the budget and schedule on a weekly basis.

Uploaded by

Soeghy Alie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 40

KLY BLOG POSTING SUBMISSION

Goal : Blog Posting Tracking Sheet


Week Number

1 hour $

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

W1

W2

W3

6
26
200.00

Name

EDC

2-Nov

9-Nov

16-Nov

LDC

16-Nov

23-Nov

30-Nov

W01

W02

W03

Blog
Joining
Status

Charles Okonkwo
Joseph Adewale
Tega Ziregbe
Rotimi Ojo
Livinus Onuh
Folakemi Fadahunsi
Stella Ngozi Ekeke
John Bwala
Lucky Edjenekpo
Nwachukwu Reginald

Yes

Yes

Yes

Yes

Yes

0R

Yes

Yes

Yes

Yes

Yes

Adedoyin Talabi

Yes

Eze Norbert O.

Yes

1R

Oge Aniagboso
Akinboade Jide
Adesanya Segun
Makinde James
Ajimmy Mervyn
Ukoko Gideon
Okocha Chidiebere
Lashae Davis
Kentebe Mary
Ugboma Asibeli
Iserhienrhien Austin
Okonweze Hycienth
Stephon Chikezie
Rasheed I braheem

Yes

Yes

Yes

1R

Yes

Yes

????

Yes

Yes

1R

Yes

Yes

Yes

Yes

1R

Yes

Yes

1R

1
1

1
1

Physical % Complete (Units Accepted/Units Committed)

Team
Perform
ance
Indices
per
Week

Actual Cost of Work Performed


Budgeted Cost of Work Performed
Budgeted Cost of Work Scheduled
Budgeted Cost At Completion
Schedule Variance
Cost Variance
Schedule Performance Index
Cost Performance Index
EAC using CPI
EAC using CPI X SPI
TCPI Using CPI EAC
TCPI Using CPI X SPI EAC
BEI
Hit/Miss
?????
?????
?????

Control Manhours

Verify this value against MS Project:

ACWP (AC)
BCWP (EV)
BCWS (PV)
BAC

92.31%

61.54%

53.85%

$10,600.00

$8,000.00

$3,800.00

9,600

6,400

5,600

10,400

10,400

10,400

(800)

(4,000)

(4,800)

(1,000)

(1,600)

1,800

0.92

0.62

0.54

0.91

0.80

1.47

106.00
10,600

80.00
(26.00)
(2,600)

38.00
(42.00)
(4,200)

9,600

(3,200)

(800)

EAC

TCPI

EAC
(realistic) =
= (BACACWP+
BCWP)/
(BAC(EAC-ACWP)
BCWP)/CPI

EAC

TCPI

(BAC= (BACBCWP)/(SPI
BCWP)/
* CPI)
(EAC-ACWP)

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13
Week #

23-Nov

30-Nov

7-Dec

14-Dec

21-Dec

28-Dec

4-Jan

11-Jan

18-Jan

25-Jan

7-Dec

14-Dec

21-Dec

28-Dec

4-Jan

11-Jan

18-Jan

25-Jan

1-Feb

8-Feb

W04

W05

W06

W07

W08

W09

W10

W11

W12

W13

2 weeks behind schedule vs Early Dates; 0

5 weeks behind schedule vs Early Dates; 3

1 week BEHIND schedule vs Early Dates, 1

6 weeks behind schedule vs Early Dates; 4

+0 week AHEAD of schedule vs Early Dates

1 week BEHIND schedule vs Early Dates, 1

1 week BEHIND schedule vs Early Dates, 1

+1 weeks AHEAD of schedule vs Early Date

+1 weeks AHEAD of schedule vs Early Date

2 weeks behind schedule vs Early Dates; 0

4 weeks behind schedule vs Early Dates; 2

4 weeks behind schedule vs Early Dates; 2

5 weeks behind schedule vs Early Dates; 3

5 weeks behind schedule vs Early Dates; 3

5 weeks behind schedule vs Early Dates; 3

4 weeks behind schedule vs Early Dates; 2

6 weeks behind schedule vs Early Dates; 4

4 weeks behind schedule vs Early Dates; 2

4 weeks behind schedule vs Early Dates; 2

4 weeks behind schedule vs Early Dates; 2

4 weeks behind schedule vs Early Dates; 2

3 weeks behind schedule vs Early Dates; 1

3 weeks behind schedule vs Early Dates; 1

4 weeks behind schedule vs Early Dates; 2

+1 weeks AHEAD of schedule vs Early Date

+1 weeks AHEAD of schedule vs Early Date

38.46%

26.92%

19.23%

$3,200.00

$7,800.00

$6,000.00

4,000

2,800

2,000

10,400

10,400

10,400

(6,400)

(7,600)

(8,400)

26.67%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

800

(5,000)

(4,000)

0.38

0.27

0.19

1.25

0.36

0.33

32.00
(6.00)
(600)

78.00
46.00
4,600

60.00
(18.00)
(1,800)

0.00
(60.00)
(6,000)

0.00
0.00
0

0.00
0.00
0

0.00
0.00
0

0.00
0.00
0

0.00
0.00
0

0.00
0.00
0

(1,600)

(1,200)

(800)

(2,000)

W14

W15

W16

W17

W18

W19

W20

W21

W22

W23

W24

Week #
1-Feb

8-Feb

15-Feb

22-Feb

1-Mar

8-Mar

15-Mar

22-Mar

29-Mar

5-Apr

12-Apr

15-Feb

22-Feb

1-Mar

8-Mar

15-Mar

22-Mar

29-Mar

5-Apr

12-Apr

19-Apr

26-Apr

W14

W15

W16

W17

W18

W19

W20

W21

W22

W23

W24

schedule vs Early Dates; 0 Weeks behind vs Late Dates.

D of schedule vs Early Dates, +3 Weeks AHEAD of schedule vs Late Dates


schedule vs Early Dates; 3 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates, 1 Week AHEAD of schedule vs Late Dates
schedule vs Early Dates; 4 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT

D of schedule vs Early Dates, +2 Weeks AHEAD of schedule vs Late Dates


schedule vs Early Dates, 1 Week AHEAD of schedule vs Late Dates
schedule vs Early Dates, 1 Week AHEAD of schedule vs Late Dates

D of schedule vs Early Dates, +3 Weeks AHEAD of schedule vs Late Dates

D of schedule vs Early Dates, +3 Weeks AHEAD of schedule vs Late Dates


schedule vs Early Dates; 0 Weeks behind vs Late Dates.
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 3 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 3 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 3 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 4 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT

D of schedule vs Early Dates, +3 Weeks AHEAD of schedule vs Late Dates


schedule vs Early Dates; 1 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 1 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT
schedule vs Early Dates; 2 Weeks behind vs Late Dates. IN VIOLATION OF CONTRACT

0.00%

0.00
0.00
0
0

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

W25

W26

19-Apr

26-Apr

26-Apr

26-Apr

W25

W26

W27

W27

W28

W28

W29

W29

Err:504

ACWP

BCWP

Cumulative
From
Individual
time cards
(AC)

From EV
calculations
(EV)

Current
Week #

% Of Physical
Progress To
Date (Units
accepted/Units
Committed)

16%

$1,000

$1,664

28%

$2,400

$2,912

4%

$800

$416

16%

$2,200

$1,664

0%

$1,400

$0

24%

$2,800

$2,496

20%

$2,800

$2,080

16%

$2,200

$1,664

28%

$2,400

$2,912

28%

$2,400

$2,912

16%

$2,000

$1,664

8%

$1,800

$832

8%

$1,000

$832

4%

$600

$416

4%

$200

$416

4%

$600

$416

8%

$800

$832

0%

$0

$0

8%

$800

$832

8%

$400

$832

8%

$600

$832

8%

$800

$832

28%

$3,400

$2,912

8%

$1,600

$832

12%

$1,800

$1,248

8%

$2,600

$832

0.00%

0.00%

0.00%

0.00%

0.00%
$39,400
$33,280

29
27

BCWS

BAC

From Cost
Current
Loaded
Approved BAC
Schedule (PV)

Individual Performance
CV
SPI

SV
=BCWPBCWS =
Schedule
Variance

=BCWPACWP =
Cost
Variance

3
3

CPI

100
100

EAC 1

= BCWP /
EAC (realistic) =
= BCWP / ACWP =
BCWS =
ACWP+(BACCPI
SPI
BCWP)/CPI

$2,400

$10,400

-$736

$664

0.69

1.66

4,868

$2,400

$10,400

$512

$512

1.21

1.21

6,676

$2,400

$10,400

-$1,984

-$384

0.17

0.52

15,577

$2,400

$10,400

-$736

-$536

0.69

0.76

10,709

$2,400

$10,400

-$2,400

-$1,400

0.00

0.00

#DIV/0!

$2,400

$10,400

$96

-$304

1.04

0.89

9,087

$2,400

$10,400

-$320

-$720

0.87

0.74

10,904

$2,400

$10,400

-$736

-$536

0.69

0.76

10,709

$2,400

$10,400

$512

$512

1.21

1.21

6,676

$2,400

$10,400

$512

$512

1.21

1.21

6,676

$2,400

$10,400

-$736

-$336

0.69

0.83

9,736

$2,400

$10,400

-$1,568

-$968

0.35

0.46

17,524

$2,400

$10,400

-$1,568

-$168

0.35

0.83

9,736

$2,400

$10,400

-$1,984

-$184

0.17

0.69

11,683

$2,400

$10,400

-$1,984

$216

0.17

2.08

3,894

$2,400

$10,400

-$1,984

-$184

0.17

0.69

11,683

$2,400

$10,400

-$1,568

$32

0.35

1.04

7,788

$2,400

$10,400

-$2,400

$0

0.00

#DIV/0!

#DIV/0!

$2,400

$10,400

-$1,568

$32

0.35

1.04

7,788

$2,400

$10,400

-$1,568

$432

0.35

2.08

3,894

$2,400

$10,400

-$1,568

$232

0.35

1.39

5,841

$2,400

$10,400

-$1,568

$32

0.35

1.04

7,788

$2,400

$10,400

$512

-$488

1.21

0.86

9,457

$2,400

$10,400

-$1,568

-$768

0.35

0.52

15,577

$2,400

$10,400

-$1,152

-$552

0.52

0.69

11,683

$2,400

$10,400

-$1,568

-$1,768

0.35

0.32

25,313

$62,400
$270,400
-$29,120
-$6,120
0.53
0.84
$320,125

8700
8100

EAC 2

TCPI 1

TCPI 2

EAC (Best
Practice) =
ACWP+(BACBCWP)/
(CPIXSPI)

Using CPI EAC


-EAC'= (BACBCWP)/(EACACWP)

Best Pracies
EAC'= (BACBCWP)/(EACACWP)

$8,572

1.28

1.15

$7,486

1.28

1.47

$111,569

1.28

0.09

$18,859

1.28

0.52

#DIV/0!

#DIV/0!

#DIV/0!

$11,326

1.28

0.93

$15,723

1.28

0.64

$18,859

1.28

0.52

$7,486

1.28

1.47

$7,486

1.28

1.47

$17,144

1.28

0.58

$61,512

1.28

0.16

$34,173

1.28

0.29

$83,677

1.28

0.12

$27,892

1.28

0.36

$83,677

1.28

0.12

$27,338

1.28

0.36

#DIV/0!

#DIV/0!

#DIV/0!

$27,338

1.28

0.36

$13,669

1.28

0.72

$20,504

1.28

0.48

$27,338

1.28

0.36

$10,606

1.28

1.04

$54,677

1.28

0.18

$27,185

1.28

0.36

$88,850

1.28

0.11

Team Performance
Indices Cumulative to
date

$565,759
0.84
0.45

PLEASE DO NOT DELETE SOMEONE ELSE'S HOURS.

Weekly -Time Card


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Total

Adedoyin Talabi
Adesanya Oluwasegun
Ajimmy Mervyn
Akinboade Jide
Charles Okonkwo
Eze Norbert O.
Folake Fadahunsi
Iserhienrhien Austin
John Bwala
Joseph Adewale
Kentebe Mary
Lashae Davis
Livinus Onuh
Lucky Edjenekpo
Makinde James
Nnaemekam Chikezie
Nwachukwu Reginald
Oge Aniagboso
Okocha Chidiebere
Okonweze Hycienth
Olusegun Ofuya
Rasheed I braheem
Rotimi Ojo
Stella Ngozi Ekeke
Tega Ziregbe
Ugboma Asibeli
Ukoko Gideon

Weekly Report

MAP Tools & Technique

Solve Assignments

1
2
3

0
1
2
1

12.00

10.00

Competitive Bid

2.500 WORDS PAPER

Weekly Blog

Total
7.00
-

6.00

5.00

6.00

10.00
-

5.00

7.00
-

8.00
-

1.00

3.00
-

4.00

4.00

12.00

12.00
-

38.00

30.00

90.00

PLEASE DO NOT DELETE SOMEON

Weekly -Time Card


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Total

Adedoyin Talabi
Adesanya Oluwasegun
Ajimmy Mervyn
Akinboade Jide
Charles Okonkwo
Eze Norbert O.
Folake Fadahunsi
Iserhienrhien Austin
John Bwala
Joseph Adewale
Kentebe Mary
Lashae Davis
Livinus Onuh
Lucky Edjenekpo
Makinde James
Nnaemekam Chikezie
Nwachukwu Reginald
Oge Aniagboso
Okocha Chidiebere
Okonweze Hycienth
Olusegun Ofuya
Rasheed I braheem
Rotimi Ojo
Stella Ngozi Ekeke
Tega Ziregbe
Ugboma Asibeli
Ukoko Gideon

Total
7.00
3.00
8.00
8.00
13.00
5.00
14.00
8.00
13.00
10.00
7.00
6.00
-

102.00

PLEASE DO NOT DELETE SOMEONE ELSE'S HOURS.

Weekly -Time Card


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Total

Adedoyin Talabi
Adesanya Oluwasegun
Ajimmy Mervyn
Akinboade Jide
Charles Okonkwo
Eze Norbert O.
Folake Fadahunsi
Iserhienrhien Austin
John Bwala
Joseph Adewale
Kentebe Mary
Lashae Davis
Livinus Onuh
Lucky Edjenekpo
Makinde James
Nnaemekam Chikezie
Nwachukwu Reginald
Oge Aniagboso
Okocha Chidiebere
Okonweze Hycienth
Olusegun Ofuya
Rasheed I braheem
Rotimi Ojo
Stella Ngozi Ekeke
Tega Ziregbe
Ugboma Asibeli
Ukoko Gideon

Weekly Report

MAP Tools & Technique

Solve Assignments

2
1
2

10.00

1.00

6.00

Competitive Bid

2.500 WORDS PAPER

Weekly Blog

Total
4.00
-

6.00

11.00
-

21

25.00
-

2.00

12

15.00
-

8.00
-

6.00

9.00
-

53.00

16.00

86.00

PLEASE DO NOT DELETE SOMEONE ELSE'S HOURS. SOMEONE DELETED MY HOU

Weekly -Time Card


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Total

Adedoyin Talabi
Adesanya Oluwasegun
Ajimmy Mervyn
Akinboade Jide
Charles Okonkwo
Eze Norbert O.
Folake Fadahunsi
Iserhienrhien Austin
John Bwala
Joseph Adewale
Kentebe Mary
Lashae Davis
Livinus Onuh
Lucky Edjenekpo
Makinde James
Nnaemekam Chikezie
Nwachukwu Reginald
Oge Aniagboso
Okocha Chidiebere
Okonweze Hycienth
Olusegun Ofuya
Rasheed I braheem
Rotimi Ojo
Stella Ngozi Ekeke
Tega Ziregbe
Ugboma Asibeli
Ukoko Gideon

Weekly Report

MAP Tools & Technique

Solve Assignments

1
2
1

2
1
1

12.00

1.00

4.00

DELETED MY HOURS LAST WEEK - FOLAKEMI


Competitive Bid

2.500 WORDS PAPER

Weekly Blog

Total
9.00
-

7.00

9.00

9.00

5.00
-

15

19.00
-

4.00

8.00
-

6.00

11.00
-

51.00

19.00

87.00

Weekly -Time Card


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Total

Adedoyin Talabi
Adesanya Oluwasegun
Ajimmy Mervyn
Akinboade Jide
Charles Okonkwo
Eze Norbert O.
Folake Fadahunsi
Iserhienrhien Austin
John Bwala
Joseph Adewale
Kentebe Mary
Lashae Davis
Livinus Onuh
Lucky Edjenekpo
Makinde James
Nnaemekam Chikezie
Nwachukwu Reginald
Oge Aniagboso
Okocha Chidiebere
Okonweze Hycienth
Olusegun Ofuya
Rasheed I braheem
Rotimi Ojo
Stella Ngozi Ekeke
Tega Ziregbe
Ugboma Asibeli
Ukoko Gideon

Weekly Report

MAP Tools & Technique

Solve Assignments

1
3
1
1
1

2
2
1
1
2
1
1
1

3
2

19.50

1.00

11.00

Competitive Bid

2.500 WORDS PAPER

Weekly Blog

Total
-

40

45.00

3.00

7.00

5.00

5.50

7.00

3.00

7.00
-

5.00

9.00

15

18.00
-

6.00

7.00

5.00

6.00

4.00
-

4.00

9.00

9.00
-

7.00
-

100.00

40.00

171.50

Weekly -Time Card

Weekly Report

MAP Tools & Technique

Solve Assignments

Adedoyin Talabi

Adesanya Oluwasegun

Ajimmy Mervyn

Akinboade Jide

Charles Okonkwo

Eze Norbert O.

Folake Fadahunsi

Iserhienrhien Austin

John Bwala

10

Joseph Adewale

11

Kentebe Mary

12

Lashae Davis

13

Livinus Onuh

14

Lucky Edjenekpo

15

Makinde James

16

Nnaemekam Chikezie

17

Nwachukwu Reginald

18

Oge Aniagboso

19

Okocha Chidiebere

20

Okonweze Hycienth

21

Olusegun Ofuya

22

Rasheed I braheem

23

Rotimi Ojo

24

Stella Ngozi Ekeke

25

Tega Ziregbe

26

Ugboma Asibeli

27

Ukoko Gideon

Total

39.00

2.00

1.00

Total

Competitive Bid

2.500 WORDS PAPER

Weekly Blog

7.00

5.00

7.00

7.00

7.00

6.00

7.00

5.00

8.00

7.00

5.50

5.00

1.00
0

7.00

7.00

6.00

7.00

7.00

7.00

7.00
-

3.00

6.00

9.00

2.00
2

6.00
-

56.50

53.00

151.50

You might also like