0% found this document useful (0 votes)
2K views4 pages

MOP (Method of Procedure)

This document outlines the steps for a method of procedure (MOP). It includes sections for the purpose and scope of work, activity details and timelines, implementation instructions, assumptions, risk factors, communication plan and contact list, and resource requirements. The system design section is not applicable as no new system is being implemented.

Uploaded by

Muhammad Noman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views4 pages

MOP (Method of Procedure)

This document outlines the steps for a method of procedure (MOP). It includes sections for the purpose and scope of work, activity details and timelines, implementation instructions, assumptions, risk factors, communication plan and contact list, and resource requirements. The system design section is not applicable as no new system is being implemented.

Uploaded by

Muhammad Noman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

MOP (Method of Procedure)

Contents
1.

PURPOSE

2.

SCOPE OF WORK

3.

ACTIVITY DESCRIPTION

4.

ACTIVITY DETAILS WITH TIMELINES

5.

OTHER RELATED INFORMATION

6.

IMPLEMENTATION INSTRUCTIONS

7.

DT/CMD FILES OR OTHER DOCUMENTS

8.

FALL BACK PROCEDURE

9.

ASSUMPTIONS

10.

SPECIAL INSTRUCTIONS

11.

DEPENDENCIES

12.

RISK FACTORS

13.

COMMUNICATION PLAN AND CONTACT LIST

14.

RESOURCE REQUIREMENTS

15.

SYSTEM DESIGN

15.1

System Descriptions

15.2

Network Architecture

15.3

Components

15.4

Software

15.5

Call Flow

15.6

Transport

15.7

Signaling

15.8

Environmental Engineering Requirements (Floor Space, HVAC, Power)

15.9

Data Flow

15.10

Customer Care Requirements

1.

Purpose

2.

Scope of Work

3.

Activity details with timelines


Provide each step of the activity with timelines in the given below table.
Activity

Step
No.

Duration

Responsible

1
2
3
4

4.

Other Related Information

5.

Implementation instructions

6.

DT/CMD Files or other documents

7.

Fall back Procedure

8.

Assumptions

9.

Special instructions

10.

Dependencies

11.

Risk Factors

12.

Communication Plan and Contact List


Name

Number

Email

Responsibility

13. Resource Requirements


No resource required.

14.

System Design

14.1 System Descriptions


14.2 Network Architecture
N/A
14.3 Components
N/A
14.4 Software
N/A
14.5 Call Flow
N/A
14.6 Transport
N/A
14.7 Signaling
N/A
14.8 Environmental Engineering Requirements (Floor Space, HVAC, Power)
N/A
14.9 Data Flow
N/A
14.10

Customer Care Requirements

N/A
---- End of Document ----

You might also like