Fuse Blows Power Lost Motor(s) Overheat

The work order is for an electrical issue at the CNC LAB location involving fuse blowing and power loss at Asset Numbers 1,2,3,4 which are Fagor Turning machines. The problem was a power spike. The technician moved nearby high current devices away and installed surge protection to prevent future issues. The work order status is closed.

Uploaded by

Ibraheem Khress
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views2 pages

Fuse Blows Power Lost Motor(s) Overheat

The work order is for an electrical issue at the CNC LAB location involving fuse blowing and power loss at Asset Numbers 1,2,3,4 which are Fagor Turning machines. The problem was a power spike. The technician moved nearby high current devices away and installed surge protection to prevent future issues. The work order status is closed.

Uploaded by

Ibraheem Khress
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Work Order

Work Order NO : 000006

Work Trade :Mechanical

Work Order Status : Closed

Work Type : corrective

Work priority : Emergency


Assigned to : FET Collage
Received by : ibraheem khress
shgair
Received Data/Time :

Requester : Dr khaleel Abu


Phone Number :

PM Target Start Data :

PM Target End Data :

Problem Description : Electrical (Fuse blows, Power lost, Motor(s) overheat)


Note to Technician :
Failure Code : 1

Check list No:

Asset No : 1,2,3,4

Location NO : 2

Asset Name : Fagor Turning


Case description

Power spike

Location Name : CNC LAB


Action Taken

Prevention Taken

- Move any nearby high current switching


devices (arc welders, inductive motors)
away from the machine.
- Properly ground equipment and install
surge protection to insulate against
lightning strikes.

Part and labor Details

**D=Direct Issue , I = Inventory

Data and Time work was started


Time :
Data and Time work was completed
Certification and Work Completion
Name and Signature of
Technician/Engineer
Name

Signature
Data :
Time :
Please rate our services :

Data :
Data :

Time :

Name and Signature of


Requester/Supervisor
Name

Signature
Data :
Time :

1-Poor

2-Fair

3-Good

4-Very Good

Excellent

Work Order
Work Order NO : 000006
:Mechanical
Work Order Status : Open
Prevention
Work priority : Normal
PM checklist Daily
Checklist No : 2
Checklist Desc:
1234-

Check all connections, wires, boards, connectors etc...


Check and adjust sin/cosine on clock card (DC machines only)
Check ground integrity
Adjust position loop gain

Work Trade
Work Type :

5-