IADC Daily Report
IADC Daily Report
BADGER1_20080129_1B
REPORT NO.
2008 )
LEASE
WELL NO.
1
OPERATOR
DATE
1/29/2008
WEIGHT
GRADE
FIELD OR DISTRICT
TYPE
STRING NO.
STATE / COUNTRY
SIZE
PUMP NO.
SIZE
PUMP MANUFACTURER
TYPE
STROKE
LENGTH
MAKE
WEIGHT GRADE
NO.
JOINTS
NV/U.S.
TOOL JT OD
COUNTY
Eureka
RIG NO.
D.P. SIZE
WATER DEPTH
0.0
CONTRACTOR
RKB TO
LENGTH CSG HD.
NO. LINES
LENGTH SLIPPED
SET AT
LAST
CASING
TUBING
OR
LINER
PRESENT LENGTH
WEAR OR TRIPS
SINCE LAST CUT
DRILLING ASSEMBLY
(At end of tour )
NIGHT
DAY
ITEM
NO.
DEPTH INTERVAL
MUD RECORD
BIT RECORD
FROM
LENGTH
BIT NO.
TO
DRILL
REAM
CORE
ROTARY
TABLE
SPEED
FORMATION
(SHOW RECOVERY )
CORE
NO.
WEIGHT
ON
BIT
PUMP
PRESSURE
SPM
5.5
TIME
SIZE
PUMP NO. 1
LINER
SIZE
PUMP NO. 2
LINER
SIZE
SPM
PUMP NO. 3
LINER
SIZE
PUMP NO. 4
LINER
SIZE
SPM
SPM
TOTAL
PUMP
OUTPUT
5.5
MUD WT
2. DRILL ACTUAL
IADC CODE
DEPTH
GRADIENT
3. REAMING
FUNNEL VIS
TVD
HORIZ.
DISPL.
DEPTH
DEV.
DIR.
TVD
HORIZ.
DISPL.
Palisades #1
Company
DEPTH
DEV.
DIR.
TVD
HORIZ.
DISPL.
NIGHT TOUR
CREW
Rig No
FROM
1800
EMPL. ID NO.
TO
INJURED THIS
TOUR ?
600
NAME
HOURS
INITIAL
RIG MANAGER
3333
WILLIAM FOWLER
12.00
WF
YES / NO
NO
DERRICKMAN
0107
JAKE FOWLER
12.00
JF
NO
MOTORMAN
9164
MACK MCELROY
12.00
MM
NO
FLOORMAN
9886
ERIC SHADER
12.00
ES
NO
FLOORMAN
6688
RANDEY SLATER
12.00
RS
NO
TYPE
DIR.
DEVIATION
RECORD
MANUFACTURER
4. CORING
DEV.
1/29/2008
Toolpusher
CUMULATIVE WEAR OR
TRIPS
Date
PV / YP
TIME LOG
SERIAL NO.
10.0
GEL STR
7. LUBRICATE RIG
FROM
TO
ELAPSED
TIME
CODE
JETS
8. REPAIR RIG
FLUIDLOSS
1800
2200
4.00
pH
2200
2300
1.00
19
FISHING
2300
0500
6.00
TRIPS TOOH
0500
0600
1.00
21
TFA
SOLIDS
DEPTH IN
TOTAL DRILLED
TOTAL HOURS
CUTTING STRUCTURE
TYPE
AMOUNT
19. FISHING
OUTER
DULL CHAR
LOCATION
BRG / SEALS
GAGE
OTHER DULL
REASON
DRILLPIPE SINGLES
1.0
INNER
DRILLPIPE STANDS
1.0
22.
WT. OF STRING
23.
SM PIPE SPINNERS
A. PERFORATING
B. TUBING TRIPS
DRILLER
COMPLETION
C. TREATING
DRILLING ASSEMBLY
(At end of tour )
E. TESTING
NO.
F.
ITEM
G.
FROM
LENGTH
BIT NO.
TO
DRILL
REAM
CORE
DEVIATION
RECORD
MANUFACTURER
FUNNEL VIS
PUMP
PRESSURE
PUMP NO. 1
LINER
SIZE
SPM
PUMP NO. 2
LINER
SIZE
SPM
PUMP NO. 3
LINER
SIZE
SPM
PUMP NO. 4
LINER
SIZE
SPM
TOTAL
PUMP
OUTPUT
5.5
MUD WT
GRADIENT
12.00
WEIGHT
ON
BIT
5.5
IADC CODE
TOTALS
ROTARY
TABLE
SPEED
FORMATION
(SHOW RECOVERY )
CORE
NO.
TIME
SIZE
H.
DEPTH INTERVAL
MUD RECORD
BIT RECORD
25
WILLIAM FOWLER
D. SWABBING
DEPTH
DEV.
DIR.
TVD
HORIZ.
DISPL.
DEPTH
DEV.
DIR.
TVD
HORIZ.
DISPL.
DEPTH
DEV.
DIR.
TVD
HORIZ.
DISPL.
DAY TOUR
CREW
FROM
600
TO
EMPL. ID NO.
INJURED THIS
TOUR ?
1800
NAME
DRILLER
0593
KENNY PIERCE
DERRICKMAN
7136
KENNY URIANZA
MOTORMAN
5415
JASON FORBES
FLOORMAN
4409
URAL CHEADLE
FLOORMAN
8737
REECE MIDDLEMIST
HOURS
INITIAL
TYPE
PV / YP
TIME LOG
SERIAL NO.
GEL STR
FROM
TO
ELAPSED
TIME
CODE
JETS
600
FLUIDLOSS
pH
DEPTH OUT
HOURS STANDBY
SOLIDS
DEPTH IN
TOTAL DRILLED
TOTAL HOURS
CUTTING STRUCTURE
TOTAL DAYWORK
TYPE
AMOUNT
INNER
OUTER
DULL CHAR
LOCATION
BRG / SEALS
GAGE
OTHER DULL
REASON
DRILLPIPE STANDS
DAILY MUD COST
DRILLPIPE SINGLES
TOTAL MUD COST
KELLY DOWN
TOTAL
WT. OF STRING
DRILLER
25
YES / NO