Notification of Tapping Connection (External Water Supply Systems)
Notification of Tapping Connection (External Water Supply Systems)
Notification of Tapping Connection (External Water Supply Systems)
: ____________________________________________________
Address
: ____________________________________________________
____________________________________________________
Name of Development
: ____________________________________________________
File No.
: ____________________________________________________
Date
: ____________________________________________________
60 % SKP Receipt No
: ____________________________________________________
Date
: _________________________
b).
Time
: _________________________
c).
Place to meet
: _________________________
Please ensure that the preparation works are ready for tapping connection on the above date.
Signature
: ______________________
Signature
: ______________________
Name
: ______________________
Name
: ______________________
Date
: ______________________
Date
Copy to
: (Developer)
: ______________________
FORM EPS 16
SYABAS DISTRICT: .
(EXTERNAL WATER SUPPLY SYSTEM)
TO
FROM
: ___________________________________________________
Applied by:
..
(Contractor)
: ____________________________________________________
Address
: ____________________________________________________
____________________________________________________
Name of Development
: ____________________________________________________
File No.
: ____________________________________________________
Date
: ____________________________________________________
Date
: _________________________
b).
Time
: _________________________
c).
Place to meet
: _________________________
Please ensure that the preparation works are ready for sterilizing / flushing/ water quality on the above
date.
Signature
: ______________________
Signature
: ______________________
Name
: ______________________
Name
: ______________________
Date
: ______________________
Date
Copy to
: (Consultant)
: ______________________