Trial # Total Mass (KG) Time (S) 1 2 3: Bucket Catch
Trial # Total Mass (KG) Time (S) 1 2 3: Bucket Catch
Trial #
Time (s)
1
2
3
Pitot Tube
Width of Channel (m)
1
2
3
Weir
Height of Fluid (m)
1
2
3
Y1 (m)
1
2
3
Hydraulic Jump
Y2 (m)
Bucket Catch
Mass of Water (kg)
Q (m^3/s)
Trial #
1
2
3
Time (s)
Pitot Tube
Velocity (m/s)
Q (m^3/s)
Trial #
1
2
3
Weir
Height of Fluid (m)
Q (m^3/s)
Trial #
1
2
3
Hydraulic Jump
Area (m^2)
Q (m^3/s)
Trial #
1
2
3
Bucket Catch
Total Mass (kg)
Pitot Tube
Mass flow rate (kg/s)
Weir
Mass flow rate (kg/s)
Hydraulic Jump
Mass flow rate (kg/s)
Low Jump
High Jump
Bucket Catch
Bucket Catch
Time (s)
10.23
10.65
45.00
46.00
42.50
43.50
4.15
4.08
Pitot Tube
Channel Width (m)
0.10
0.10
7.42
7.41
45.50
45.00
45.50
0.00
0.00
0.00
bucket lbs
2.5
Pitot Tube
0.10 Channel Width (m)
8.33
0.10
0.10
Pitot M
0.10
0.00
0.00
0.00
0.00
Hydraulic Jump
Hydraulic Jump
Y1 (m)
0.02
0.02
0.02 Y1 (m)
0.02
0.02
0.02
Y2 (m)
0.06
0.06
0.06 Y2 (m)
0.09
0.09
0.09
Area (m^2)
0.00
0.00
0.00
0.00
0.00
2.26
2.37
3.04
3.13
3.16
10.3
9.2
9.4
0.45
0.42
0.43
10
9.6
9.5
0.44
0.43
0.43
10
9.4
9.2
0.44
0.43
0.42
Weir
Channel Width (m)
0.10
0.10
0.10
0.21
0.21
0.21
17
15.2
17.8
0.16
0.16
0.16
0.58
0.55
0.59
0.06
0.05
0.06
17.2
18
17.2
V
H
V
0.58
17.2
0.58
0.59
18.4
0.60
0.58
17.2
0.58