MOV Check List Dept: Electrical: Equipment Tag No (Kks Code) Mov Name Motor Feeder No

This document provides a check list for conducting maintenance on a motor operated valve (MOV). The check list includes 19 items to inspect such as verifying documentation, checking the motor foundation, terminals, cabling, protection settings, and conducting operational tests. Completing the check list ensures the MOV is properly maintained by checking its various components for any issues. Upon finishing the inspection for each item, the results are recorded as OK/Not OK along with the date, person who checked it, and any remarks.

Uploaded by

superthambi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views3 pages

MOV Check List Dept: Electrical: Equipment Tag No (Kks Code) Mov Name Motor Feeder No

This document provides a check list for conducting maintenance on a motor operated valve (MOV). The check list includes 19 items to inspect such as verifying documentation, checking the motor foundation, terminals, cabling, protection settings, and conducting operational tests. Completing the check list ensures the MOV is properly maintained by checking its various components for any issues. Upon finishing the inspection for each item, the results are recorded as OK/Not OK along with the date, person who checked it, and any remarks.

Uploaded by

superthambi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

MOV Check List

DEPT: ELECTRICAL
EQUIPMENT TAG NO(KKS CODE)
MOV NAME
MOTOR FEEDER NO.
Sr.No

:
:
:

Activity Description

Reference Document

1.
1

Check availability of all


documents related to equipment
a.user manual
b.o&m manual
c. on site test report
d. factory test report
e. drawings

Physical verification / as
per specifications

2.
2

Check rating/Type of Enclosure


of Motor

Physical verification / as
per drawing

3.
4

Ensure motor foundation bolts


are tightened properly and no
damage to motor base

Physical verification / as
per drawing

4.
5
5.

Check the freeness of rotor

Physical verification

Ensure the external and internal


Power and control cable
tightness at both ends

Physical verification

6.
7

Ensure Vermin Proofing

Physical verification /as


per vendor document

7.
8

Check no damage to the


terminal box

Physical verification

8.
9

Ensure double earthing of


motor done

Physical verification /as


per specifications

9.
11

Measure the individual phase


winding resistance. All the three
readings shall be approximately
equal
U1-U2:
V1-V2:
W1-W2:

Result
OK/NOT
OK

Date

Checked
By

Remarks

Physical verification /as


per vendor document

10.
Measure the phase insulation
resistance (with 500V insulation
tester) Reading > 5Mohms.

Physical verification

11.
14

Check the power


cable,glanding, lugging and
termination at motor side and
feeder side

Physical verification /as


per specifications

12.
17

Check for proper cable metallic


identification tags for power
cable

Physical verification /as


per specifications /cable
schedule

13.
19

Ensure motor protection


settings are done and enabled as
per recommended settings
( Setting should be recorded)

As per recommended
setting chart

14.
22

Verify the proper rating of


power and control
fuses,MCB,MCCB

Physical verification /as


per drawings

15.
23

Confirm the test conducted on


incoming power cables

As per on site test report


/as per specifications

16.
24

Confirm the incoming supply


voltage level and phase
sequence

Physical verification /as


per specifications

17.
26

Trial run the motor and check


the vibration, noise, heating of
the motor

Physical verification /as


per specifications

18.
27
19.

Check the current in various


phases and record

Physical verification /as


per specifications

Check for any abnormality

Physical verification

20.
28

Approach to MOV should be


proper

Physical verification