0% found this document useful (0 votes)
31 views2 pages

New State Project

This document outlines the tasks, start dates, durations, and end dates for the construction of a new state building. It lists 9 main tasks from architecture through finishes and key handover. The architecture task started on February 2nd 2012 and landscaping was completed by May 4th 2012. The full construction was scheduled to be completed and ready for key handover by October 31st 2013.

Uploaded by

james
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

New State Project

This document outlines the tasks, start dates, durations, and end dates for the construction of a new state building. It lists 9 main tasks from architecture through finishes and key handover. The architecture task started on February 2nd 2012 and landscaping was completed by May 4th 2012. The full construction was scheduled to be completed and ready for key handover by October 31st 2013.

Uploaded by

james
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

02-Feb-12

Architecture

Landscaping

Foundations

External construction

Intenal construction

Roof

Services

Finishes

Key Handover and opening

20-Aug-12

08-Mar-13

24-Sep-13

New State Building


Tasks
Architecture
Landscaping
Foundations
External construction
Intenal construction
Roof
Services
Finishes
Key Handover and opening

Start Date
2-Feb-12
25-Mar-12
4-May-12
3-Jul
7-Jan-13
1-Jun-13
7-Jul-13
15-Sep-13
30-Oct-13

Duration
(days)
50
40
60
270
180
35
70
45
1

End Date
25-Mar-12
4-May-12
3-Jul-12
30-Mar-13
7-Jul-13
5-Jul-13
15-Sep-13
30-Oct-13
31-Oct-13