G Gammon OTHER SUBMISSION
‘SUBMISSION REF.:
GBCML REF: 13039 7304747 DOBSHS
‘Major Trade Coriractor {Gammon Building Construction (Macau) Limited | Page: | (1 ) of ( 2
‘We submit herewith the following submission to HCEM for (¥ ) Comment / Approval (_) Information|
(_) Others
[LATEST APPROVAL DATE:
EXPECTED COMMENTIAPPROVAL DATE: _ 24 MAR 2006 21 MAR 2006
‘SUBJECT: METHOD STATEMENT FOR MAKING GOOD FOR INSUFFICIENT SLAB THICKNESS
DETAILS: We submit the captioned for your perusal
GG GL wi__semafenal (
()AEDAS — wl__setsof eel
(JOKP wi sets of ee
wi__setsoferat | Authorized Representative
weet of enet
_senoterct | Charlz Yan
>
)
)
’
>
y
‘
‘
(jen inet | tractor | projet anager :
()UB or asteoteet enone (law LA-
(/)68CML wists of enc“ ‘w___ sets of enc r
Ce i —wonste () epoch ,
Siibmision Dale WAMVD) 7 MAR 2006 Sepawwe CYIAGIALIRNTET
bec, Architectural! Structural! MLE/-OS-/ Planning
je had received the above submission from Major Trade Gonractor, Gammon Building Construction (Macau) Lid. The
submission is considered necessary for your corresponding response.
Endorsed by: Date:
‘Kenneth Viu (Project Manager)
Hsin Chong Engineering (Macau) Lid.
[We forward herewith the above consultant's response and endorse the same for your follow up action,
lEndorsed by: Date:
Kenneth Viu (Project Manager)
Hsin Chong Engineering (Macau) Ltd
GG | VG wh wemofemt (PBA wise efena ‘Official Use
()AEDAS w_setsotenel, (LAB wt__sets of ena
(OK w_setsefencl (GBC. w__sts of rc.
fl
VPA wi_setscferc, ()—wl_sotsofnc.G Gammon OTHER SUBMISSION
[su5/zi20/0ms 1465
GBCML Rer.: 93039 7304.74 1 DOBSSS
Major Trade Contactor [Gammon Building Construction (Macau) Limited (2 jor( 2)
SUBJECT: METHOD STATEMENT. (GOOD FOR INSUFFICIENT SLAB THICKN!
Consultant Remark
Method Statement
2 “proce constuction witout ber cane
ceed io corstcon stot chang cated
ket ro proouang eestor ersconMethod Statement for Make Good of the Location of
Insufficient Slab Thickness
‘The location of insufficient slab thickness (less than 150mm) is inspected by the
Engineer.
Roughen the concrete surface and form a joint of minimum 10mm (Figure 1).
Make good the surface by approved cementitious grout.
Grout with Approved Cementitious Grout
Original Concrete Surface
Roughen Conerete Surface
150mm
FIGURE 1