Simple Loop1
Simple Loop1
Proj' No'
Calc' No'
142/
Area No'
Item Tag
Ref' Drg' No'
Sheet No'
PROJECT
SUBJECT FLAT EXPANSION LOOP CALCULATION
PR'P'D BY
CH'K'D BY
APP'D BY
DATE
DATE
DATE
Of
Colour key :
Loop width
mandatory input
optional input
Guide sp. 2
Loop height
intermediate result
final result
error / warning
Guide sp. 1
Guides
Anchor distance
Notes
Line No.
6"-1001
8"-2002
12"-3003
Location
grid 1 & 11
grid 2 & 22
grid 3 & 33
168.3
219.1
304.8
7.112
6.350
6.350
228.6
304.8
381.0
Ec (N/mm )
Anchor dist' [m]
2.034E+05
100.000
2.034E+05
100.000
2.034E+05
100.000
5 - 427
5 - 427
5 - 427
Material or PipeSpec'
[ref']
CS-1
CS-1
CS-1
5.761
5.761
5.761
576.1
576.1
576.1
5500
6000
6500
5500
6000
6500
12000
12000
12000
18000
18000
18000
7969
10154
15732
1767
2538
4334
368.2
405.5
472.4
172.0
172.0
172.0
Friction coeff'
0.00
0.00
0.00
0.0
0.0
0.0
Frict' anchor
load [N]
Total Anchor
load [N]
7969
10154
15732
Suggested maximum
= 70kN per beam
NOTES :
Simple-loop.xls
Pipe Dia, D =
168.3
[mm]
Wall thk.
7.112
[mm]
Cold Modulus, Ec
203395
Loop height, H =
5500.0
[mm]
Loop width, W =
5500.0
12000.0
[mm]
18000.0
1.172E+07
[mm4]
Elbow radius, R
228.6
[mm]
Flex. characteristic, h
0.250
Bend SIF,
2.27
Total exp., S
576.1
[mm]
Length, L = G - 8R+2H+2RK =
30639.62
[mm]
-89.7531
[mm]
Pipe Inertia, I
80.6
Flexibility factor, K
6.59
I CG =2(W-2R)(H/2)2+2RK(H/2-0.363R)2+(((H-2R)3)/6)+(G-2W)*(H/2)2-(L*Y2)
I CG = 172309690432 [mm3]
Mp = Fx (H/2 + Y) =
21200437
[Nmm]
M = greater of Mp & Mc =
22630984
[Nmm]
Stress = M**D/(2*I) =
368
[MPa]
1767
[N]
Fx =S I E / ICG =
7969
Mc = Fx (H/2 - Y) = 22630984
[MPa]
[mm]
[mm]
[mm3]
[mm]
[N]
[Nmm]
Pipe Dia, D =
219.1
[mm]
Wall thk.
6.350
[mm]
Cold Modulus, Ec
203400
Loop height, H =
6000.0
[mm]
Loop width, W =
6000.0
12000.0
[mm]
18000.0
2.403E+07
[mm4]
Elbow radius, R
304.8
[mm]
Flex. characteristic, h
0.171
Bend SIF,
2.92
Total exp., S
576.1
[mm]
40035.95
[mm]
0.0000
[mm]
Pipe Inertia, I
Length, L = G - 8R+2H+2RK =
Dim., Y = (2W - G)(H/2)/L =
106.4
Flexibility factor, K
9.65
I CG =2(W-2R)(H/2)2+2RK(H/2-0.363R)2+(((H-2R)3)/6)+(G-2W)*(H/2)2-(L*Y2)
I CG = 277362533901 [mm3]
Mp = Fx (H/2 + Y) =
30461503
[Nmm]
M = greater of Mp & Mc =
30461503
[Nmm]
Stress = M**D/(2*I) =
406
[MPa]
2538
[N]
Fx =S I E / ICG =
10154
Mc = Fx (H/2 - Y) = 30461503
[MPa]
[mm]
[mm]
[mm3]
[mm]
[N]
[Nmm]
Pipe Dia, D =
304.8
[mm]
Wall thk.
6.350
[mm]
Cold Modulus, Ec
203400
Loop height, H =
6500.0
[mm]
Loop width, W =
6500.0
12000.0
[mm]
18000.0
6.632E+07
[mm4]
Elbow radius, R
381.0
[mm]
Flex. characteristic, h
0.109
Bend SIF,
3.95
Total exp., S
576.1
[mm]
Length, L = G - 8R+2H+2RK =
58307.76
[mm]
55.7387
[mm]
Pipe Inertia, I
149.2
Flexibility factor, K
15.19
I CG =2(W-2R)(H/2)2+2RK(H/2-0.363R)2+(((H-2R)3)/6)+(G-2W)*(H/2)2-(L*Y2)
I CG = 493978960165 [mm3]
Mp = Fx (H/2 + Y) =
52006044
[Nmm]
M = greater of Mp & Mc =
52006044
[Nmm]
Stress = M**D/(2*I) =
472
[MPa]
4334
[N]
Fx =S I E / ICG =
15732
Mc = Fx (H/2 - Y) = 50252275
[MPa]
[mm]
[mm]
[mm3]
[mm]
[N]
[Nmm]
History
1. Original loop formula developed by ????? (scan in sheet)
2. Results are found to be conservative compared to Caesar.
2. This spreadsheet modified from original uncertain origin by SEB July 03.
3.
QA.
Scan in QA from Caesar etc.