Method Statement For Timber Items
good
Uploaded by
Gary Lo
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Method Statement for Timber Items For Later
Download
Save
Save Method Statement for Timber Items For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(1)
100% found this document useful (1 vote)
403 views
Method Statement For Timber Items
good
Uploaded by
Gary Lo
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Method Statement for Timber Items For Later
Carousel Previous
Carousel Next
Save
Save Method Statement for Timber Items For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 7
Search
Fullscreen
G Gammon OTHER SUBMISSION fork Package - 2120 - Hotel Concrete Superstructure J3039 Venetian Macau in Cotai, Macau ee SuaMISSIONReR.: | SUB/S120/mS 012 GBCML ReF.: “J9099 /3087.4 / 012601 Major Trade Contractor |Gammon Building Construction (Macau) Limited | Page: | ( 1 ) of (2 ) We submit herewith the following submission to HCEM for (v )Comment/ Approval (_) Information (_) Others ———___ EXPECTED COMMENT/APPROVAL DATE: 21 JUN 2006 LATEST APPROVAL DATE: 21 JUN 2006 Subject: Package 5130 — Hotel Fit Out VIP, Hospitality, Club Lounge ‘Submission of Method Statement for Timber Items, (Remarks: this method statement has been approved under work package 5120 as attached for easy reference) ©: ( JVGL__wi___sisofenc. ( }CSDPLANT wl_—setsofee | Authorized Representative ()AEDAS wets oferet () wet ent (0a wi_setsotenct. ( ) w__sesoten. | Charlz Yan ()PBA— wsstofereh wi—sets tena. | project Manager (jus wlosboten ww _aset ent (Ayazeme waste tent) ete ofr O wets eres) tet oer. 7 Sulmicion ala (ONIN) 7 JUN 2006 Signature CVI TWIRSIS aac [a had recived the above submission rom Major Trade Contractor, Gammon Building Construction (Macau) Ltd. The submission is considered necessary for your corresponding response. Endorsed by. Date: Kennelh Viu (Project Manager) Hsin Chong Engineering (Maceu) Ltd. CONSULTANT’S REPLY ty acsas/oap/poa/mes ta) REMARK: [authorized Represeniative |oiamen tock toter [Signature Date oftesue (YIM) |We forward heréwith the above consullant’s response and endorse the same for your foliw up clon. JEndorsed by: Date: ‘Kenneth Viu (Project Manager) Hsin Chong Engineering (Macau) Lt, CG ( jVG w_setwofend —( )PBA wi__selsofenct (Offical Use ()AEDAS w__setsofend. —( )L8B_— w_aes of enc, ()ORP —wl__sets fens. ()GBCML wi__ses of ee. ()PBAwl__setsofenc,§—() wees of eneG Gammon OTHER SUBMISSION fork Package - 2120 - Hotel Concrete Superstructure 4J3038 Venetian Macau in Cotai, Macau ‘SUBMISSION Rer.; | SUB/5130/MS 012 (GBCML REF. ‘J8038 7208.7. 12804 Major Trade Contractor [Gammon Building Construction (Macau) Limited | Page: | ( 2 ) of ( 2 ) ‘SUBJECT: Submission of Method Statement for Timber Items Consultant Remark, (ee ne #) Method Statoment for Tenber items 2 ceed carson vtboul tbe enge 8 “roceas ts carstucson sujet changes cated © “fess porto procereng io beaten or conectionSundart Engineering Services (Macau) Ltd. Venetian Macau WP-S130 Hotel Fit Out — VIP, Hospitality, Club Lounge at L6 & 17 Method Statement— Timber Items 6 June 2006 1. Scope of Work This method statement is to illustrate the method and procedure for timber decorative items and built in fixtures installation at Suites and Corridors under Sundart scope. Construction Procedures A. General Procedure B. Preparation works of Pre-Fi i ili Generally, the carpentry works are prefabricated and pre-finished items supplied by Employer’s named supplier and these items include wall moulding, newel post, wardrobe shelf, staircase tread and riser and skirting etc. Minor assembly work will be carried out on site, Built in fixture and moulding are to be designed and manufactured in accordance with the approved material and shop drawings. ‘All wood preservative shall be applied to the unexposed surfaces of timber items facing masonry wall in the supplier’s factory. Alll fire retardant paint shall be applied to all timber decorative items in the supplier’s factory before deliver to site. ished Timber items (Fabrication Stage) All dimensions of timber items and built in fixtures are to be checked and verified as per the approved drawings and approved samples. Coordinate with Major Trade Contractor’s and other sub-trades for correct work sequence, Wet trade, drywall and MEP works should have been completed and work areas are to be made watertight and kept cleared and free from construction debris before timber items installation. All material and finishes of timber decorative items and built in fixtures, are to be quality checked at factory before deliver to site. C. Installation of Pre-Finished Timber Items Generally ii. Set out all timber items on wall and floor as required. Check all dimensions on site in ensuring that the prefabricated and pre- finished timber items will fit the site dimensions. Coordinate with Major Trade Contractor and other sub-trades MEP teams for work sequences and formation of cut outs. Coordinate other subcontractors for adjoining finishing works, v3‘Sundart Engineering Services (Macau) Ltd. ‘Venetian Hotel Macau WP-5130 Out — VIP, Hospitality, Club Lounge at L6 & L7 Method Statement — Timber Items 6 June 2006 vi. D. iii. iv. Install the timber items in position as indicated in approved shop drawings. Co-ordinate with Major Trade Contractor and MEP teams for subsequent E&M installations. Installation in Particular Wall Moulding and Skirting - Wall moulding shall be pre-cut and pre- mitred at factory and fixed to wall by liquid nail and pneumatic driven secret fixing pin. Skirting shall be cut and mitred on site to suit actual site dimensions and fixed to wall by liquid nail and pneumatic driven secret fixing pin. ‘Newel Post — Install stee! frame first and then install the prefabricated and pre-finished newel post in: position. The newel post shall be fixed to the previously installed steel frame by secret fixing screw. Screw heads shall be filled and painted to match, ‘Timber Staircase Tread and Riser 1. Timber ground shall be fixed to concrete steps by liquid nail and concrete nail. 2. Install the lower step by liquid nail and pneumatic driven fixing nail to timber ground as mentioned in item 1 above. The lower step shall be pre-assembled and pre-finished in factory. 3. Install the first step riser. The riser shall be fixed by liquid nail and pneumatic driven fixing nail to timber ground. 4, Install the first step tread board by screw fixing to timber ground. ‘The screw head shall be covered by wood plug (grommet) with same finishes. Wardrobe Shelf - The shelf support frame shall be screw fixed to wardrobe wall and the wardrobe shelf shall be placed on the pre-installed framework accordingly. Suitable wall substrate shall be provided by others to facilitate the screw fixing process. ‘Touching up works i. To fill all the screw / nail heads with approved filler and paint to match adjacent surface finishes, ji, Touch up minor scratches / chip due to damages to match adjacent finishes, ifany. |. For major defects, replace the damaged timber items. iv. Adjust hardware for correct alignment and smooth operation (if 28Sundart Engineering Services (Macau) Ltd. Venetian Macau WP-5130 Hotel Fit Out — VIP, Hospitality, Club Lounge at L6 & L7 Method Statement - ‘Timber Items 6 June 2006 applicable). F, Inspection and protection i, Submit inspection request for inspection before protection. ii, Protection of carton paper and plastic sheet will be provided on finished surface only. 3. Plant and Equipment List of plant and equipment to be used for installation Electric drill Electric screwdriver Knife / cutter Laser operated leveler Powder actuated tool 4. Risk Assessment Risk assessment to be submitted in Safety Plan separately. 33BlN 2a G@icammon arene VENETIAN: a Macao Memorandum MEMO-002868 Ms Jacqueline Hul (P2120) - Gammon Construction Limited _ ‘Johnny Teh = Sart Enanecerig Series (Maen) Limes ‘Fwd: 5120 Hotel Fit Out Central Wing, Lift Lobbies & Lift Cars ~ SUB/5120/MIS/0i4- ‘Submission of Method Statement for Timber Items Installation at Sultes and Corridors Dear All We forward herewith below CMA for your follow up Regards Sherman From: Acton Kwan (Proj Coordinator Hotel) ‘Sent: Wednesday, Jan 25,2006 9:01 FM EST AEDT ‘Tos Yolenda Chan (WP2124), David Kook (INP2120), Chale Yan (WP2120) Ce: Aedas Zone & - Hotel, Actan Kwan (Pr Coordinatr-Hote), Angelo Taul (Ste Sec~ Hotel), Kocher Wong(Deputy Proj Mgr = Hotel), Ming Fal Yeung(Admin Assist), Ele Yung( Sensor Proj Coordinator), Jay Cho, Jaan O'Connel Mail Number: CMA-002675 ‘Sulbject: Fd: 5120 Hotel Fit Out Cental Wing, Lit Lobbes & Lit Cars ~SUB/5120/MIS702S- Submission of Method Statement for Timber ‘ems Istaation at Sues and Conors Response: B - Approved with Below Consultants Comments rom: David Chim Sent: Thursday, Jan 12,2006 6:51 PM EST AEDT Ta: Louis Cnu(S Project Coord - Hotel), Acton Kwan (Prof Coordinator Hotel, Alex Wong (BS Eng - hotel) Ce: Nenad Bra, Serena Chan, Calin Stang, Wate Yue, Aedas Zone 4 Hotel Mal Number: AA-004662 ‘Subject: Re: 5120 Hotel Fit Out Central Wig, Lift Lobbies& Lift Cars -SUB/5120/MIS/O14 ~ Submissan of Methed Statement for Timber ‘tems Intallton at Sutes and Comdors Dear Sirs, Response to the above submission as follows: 4. No adverse comments on the method statement for Installation of timber doors 2. Contractor/ supplier te provide shop drawings, and indleating arrangements and instalation as per method statement toy http://au1 aconex.cony ViewCorrespondence ?Correspondence_ID=23917828&CORRESPOND... 2006/6/6BIA HA 2. recommendatio code: "8, approved subject fo review/ comment by Hsin Chong regards, David From: Acton Kwan (Poj Coordinator Hote) Sent: Thuesday, Jan 12,2006 5:41 PM EST AEDT ‘To: Actas Zone 4 - Hote! Ce: Acton Kwan (Proj CoordinatorHotl), Angela Tsul (Site Sec~ Hote), Kocher Wong{Deputy Proj Mor - Hote), ing Fai Yeung(Amin Assistant), Ee Yung Sener Proj Coordinator), tan OConnel Mail Number: TRANSHIT-010958 ‘Subject: Fd: 5120 Hotel Fit Out Corral Wing, Lift Lobbies 8 Lit Cars - SUB/S120/MIS/014 - Submission of Method Statement for Timber ‘Mens Insallaton 3 Sues and Corridors Please review and comment on the captioned submission, rom: Yolenda Chan (WP2120) ‘Sent: Tuesday, Jan 10, 2006 10:49 PM EST ACOT ‘Tot Angela Tau (Ste Sec~ Hotel) Ce: Sherman Tang (WWP2120), Tony Wong (WP2120), Lous Yung (WP2120), Lous ChuSr Project Coord ~ Hotel), Ednard Ho(Pianning Engineer), Arnold Ho(Serior BS Engineer), Acton Kuan (ro) Coordnator-Hotel), Ch Kit Lal (Eng - Hote), Alex luce (Deputy Proj Mgr ote), Jey LI(BS Eng - Hote, Robert Pery (Design Mx), Alex Wong (ES Eg ~ heel), Patick Wong (Const Mgr ote, Kocher Wong(Deputy Pro} Mar - Hote Tony Wi (BS Mer-Zone Hotel), Staley Wo( Sensor 8S Engineer), Mig Fal Yeung(admin Assistant), Kenneth Yi(Peoject Manager, Eric Yung Senor Pro} Coordinator, Jimmy Chung, Henry C. H. NG ‘Mall Number: 5120/¥IS-014 ‘Subjact: 5120 Hotel Fit Out Central Wing, Ut Lobes & Uf Cars -SUB/S120/MIS/014- Submiston of Nethod Statement for Tenber Items Installation at Sultes and Corigors CHAWISTALYIpa GBOMI Ref, 33039/204.7.1/006577 __From Company Subject, +http:/faul aconex.com/ViewCorrespondence ?Correspondence_ID=2391782&CORRESPOND... 2006/6/6
You might also like
Method Statement For Construction of Drainage and Manholes
PDF
81% (16)
Method Statement For Construction of Drainage and Manholes
18 pages
Method Statement for Slab
PDF
No ratings yet
Method Statement for Slab
12 pages
Method Statement For Trees
PDF
No ratings yet
Method Statement For Trees
6 pages
MS For Spatterdash (Nitobond) Rev.1
PDF
No ratings yet
MS For Spatterdash (Nitobond) Rev.1
18 pages
Method Statement For Fixing of Slab Formwork
PDF
100% (2)
Method Statement For Fixing of Slab Formwork
5 pages
Method Statement For Demolition & Modification Works at Existing Retaining Wall RW5
PDF
80% (5)
Method Statement For Demolition & Modification Works at Existing Retaining Wall RW5
47 pages
2 Finishing Works Method Statement For Building Construction
PDF
No ratings yet
2 Finishing Works Method Statement For Building Construction
15 pages
Iron Mongeries-Method Statement
PDF
100% (1)
Iron Mongeries-Method Statement
4 pages
MOS Wood Doors Installation
PDF
100% (1)
MOS Wood Doors Installation
2 pages
Work Method Statement - PARTITIONS
PDF
0% (1)
Work Method Statement - PARTITIONS
3 pages
Method Statement For Floor Screeding and Concreting
PDF
100% (1)
Method Statement For Floor Screeding and Concreting
16 pages
BD List of Approved Foundation System
PDF
No ratings yet
BD List of Approved Foundation System
2 pages
Method Statement For Excavating Additional 3m Deep Trial Pits (2013!08!13)
PDF
0% (2)
Method Statement For Excavating Additional 3m Deep Trial Pits (2013!08!13)
16 pages
Zaxis 75
PDF
100% (1)
Zaxis 75
2 pages
Method Statement For Excavating Additional 3m Deep Trial Pits (2013!08!13)
PDF
0% (2)
Method Statement For Excavating Additional 3m Deep Trial Pits (2013!08!13)
16 pages
Method Statement For Timber Doors Installation
PDF
No ratings yet
Method Statement For Timber Doors Installation
8 pages
MOS Fire Rated Door Installation
PDF
50% (2)
MOS Fire Rated Door Installation
3 pages
Method Statement Glass Door Fixing.
PDF
100% (1)
Method Statement Glass Door Fixing.
1 page
Method Statement Wooden
PDF
0% (1)
Method Statement Wooden
7 pages
Method Statement Aluminium
PDF
No ratings yet
Method Statement Aluminium
7 pages
Miscellaneous Metal Works
PDF
No ratings yet
Miscellaneous Metal Works
6 pages
Method Statement For Building Work 20180816 PDF
PDF
No ratings yet
Method Statement For Building Work 20180816 PDF
16 pages
METHOD OF STATEMENT - ALKHOMRA PROJECT - Almunium Window
PDF
No ratings yet
METHOD OF STATEMENT - ALKHOMRA PROJECT - Almunium Window
6 pages
Methodology For Replacement of Wall & Floor Tiles
PDF
No ratings yet
Methodology For Replacement of Wall & Floor Tiles
4 pages
MOS For Drainage Pipe Installation
PDF
100% (1)
MOS For Drainage Pipe Installation
2 pages
Method Statement-Ceiling Strips-Rev00
PDF
No ratings yet
Method Statement-Ceiling Strips-Rev00
7 pages
Work Method Statement FOR Plastering Works at Information Center
PDF
No ratings yet
Work Method Statement FOR Plastering Works at Information Center
2 pages
MOS Installation of Aluminium Strip Ceiling
PDF
No ratings yet
MOS Installation of Aluminium Strip Ceiling
3 pages
TEC-031100G-MET-DoR-001a (Method Statement For The Erection and Dismantling of GFT Formwork)
PDF
No ratings yet
TEC-031100G-MET-DoR-001a (Method Statement For The Erection and Dismantling of GFT Formwork)
7 pages
Method Of Statement For Porcelain tiles works
PDF
No ratings yet
Method Of Statement For Porcelain tiles works
12 pages
UAC Fixing Manual New
PDF
No ratings yet
UAC Fixing Manual New
16 pages
Method Statement Waterproofing
PDF
No ratings yet
Method Statement Waterproofing
6 pages
0012-wms For Wall & Floor Tiles
PDF
100% (2)
0012-wms For Wall & Floor Tiles
7 pages
METHOD STATEMENT - CONSTRUCTION OF 8no. STANDARD ABLUTION BLOCKS
PDF
100% (2)
METHOD STATEMENT - CONSTRUCTION OF 8no. STANDARD ABLUTION BLOCKS
6 pages
10.method Statement - Urinal partition-GFM
PDF
No ratings yet
10.method Statement - Urinal partition-GFM
4 pages
WORK METHOD STATEMENT-installation of Fittings
PDF
No ratings yet
WORK METHOD STATEMENT-installation of Fittings
23 pages
Method Statement Pigmented Plaster Repair
PDF
No ratings yet
Method Statement Pigmented Plaster Repair
10 pages
Method of Statement - Alkhomra Project - Interlocking
PDF
No ratings yet
Method of Statement - Alkhomra Project - Interlocking
6 pages
Work Method Statement - LVT Vinyl Flooring
PDF
No ratings yet
Work Method Statement - LVT Vinyl Flooring
3 pages
Water Rec
PDF
No ratings yet
Water Rec
9 pages
Block Work MS (Sample)
PDF
100% (1)
Block Work MS (Sample)
18 pages
MOS of Shear Stud Installation
PDF
No ratings yet
MOS of Shear Stud Installation
3 pages
Method Statement Suspended Ceiling
PDF
No ratings yet
Method Statement Suspended Ceiling
25 pages
Method Statements 05 - Painting Works
PDF
No ratings yet
Method Statements 05 - Painting Works
7 pages
Ms Block Works
PDF
No ratings yet
Ms Block Works
3 pages
Method Statement For Cement Rendering
PDF
No ratings yet
Method Statement For Cement Rendering
1 page
Method of Statement Gypsum Board Works &ITP
PDF
100% (1)
Method of Statement Gypsum Board Works &ITP
11 pages
Quality Systems Manual Method Statement
PDF
No ratings yet
Quality Systems Manual Method Statement
9 pages
Method Statement For Tiling, False Ceiling & Lightings Installation Work
PDF
No ratings yet
Method Statement For Tiling, False Ceiling & Lightings Installation Work
10 pages
Mos For Gypsum Partitions
PDF
No ratings yet
Mos For Gypsum Partitions
8 pages
MOS-CVL-05Dry Wall Partition - Gypsum MOS
PDF
No ratings yet
MOS-CVL-05Dry Wall Partition - Gypsum MOS
1 page
MOS-002B Door Frame, Door Leaf & Ironmongeries
PDF
No ratings yet
MOS-002B Door Frame, Door Leaf & Ironmongeries
6 pages
Construction Method For Ground Beam and Slab
PDF
100% (1)
Construction Method For Ground Beam and Slab
4 pages
Work Method Statement - LACQUERED GLASS PANELING
PDF
100% (1)
Work Method Statement - LACQUERED GLASS PANELING
2 pages
MOS Grills and Diffusers
PDF
100% (1)
MOS Grills and Diffusers
5 pages
Method Statement Cladding
PDF
0% (1)
Method Statement Cladding
2 pages
Method Statement For Installation of Pre-Finished Engineering Flooring and Skirting
PDF
No ratings yet
Method Statement For Installation of Pre-Finished Engineering Flooring and Skirting
7 pages
MOS of Installation Rise Floor
PDF
No ratings yet
MOS of Installation Rise Floor
13 pages
Method Statement For Installation For Curtain Wall Unitized PDF
PDF
No ratings yet
Method Statement For Installation For Curtain Wall Unitized PDF
38 pages
Method Statement - Concreting Work
PDF
No ratings yet
Method Statement - Concreting Work
4 pages
Method Statement of Liftcore Wall 1 Bulging Repair
PDF
100% (1)
Method Statement of Liftcore Wall 1 Bulging Repair
4 pages
Concrete Pavers Method Statement-DRAFT (1)
PDF
No ratings yet
Concrete Pavers Method Statement-DRAFT (1)
15 pages
Method Statement For Wallpaper Installation
PDF
No ratings yet
Method Statement For Wallpaper Installation
5 pages
Method Statement For Curtain Wall and Glazing and Aluminium Cladding
PDF
No ratings yet
Method Statement For Curtain Wall and Glazing and Aluminium Cladding
137 pages
Dokumen - Tips - Method Statement For Steel Balustrade and Railing Installation
PDF
100% (1)
Dokumen - Tips - Method Statement For Steel Balustrade and Railing Installation
6 pages
General Notes. Finishes. Legend Revisions: Gspublisherengine 0.0.100.100
PDF
No ratings yet
General Notes. Finishes. Legend Revisions: Gspublisherengine 0.0.100.100
1 page
1102 W Hik SWL C10 301a
PDF
No ratings yet
1102 W Hik SWL C10 301a
1 page
Kobelco Rk250-7 Spec
PDF
100% (4)
Kobelco Rk250-7 Spec
4 pages
RA-003-Risk Assessment For Installation of Temporary OHL Masts & Back-Ties
PDF
No ratings yet
RA-003-Risk Assessment For Installation of Temporary OHL Masts & Back-Ties
5 pages
1102 W Hik SWL C10 301a
PDF
No ratings yet
1102 W Hik SWL C10 301a
1 page
1102 W Hik SWL Q08 395a
PDF
No ratings yet
1102 W Hik SWL Q08 395a
1 page
Location Plan: East Rail
PDF
No ratings yet
Location Plan: East Rail
1 page
APP129
PDF
No ratings yet
APP129
10 pages
Central Data Bank List For Fixing
PDF
No ratings yet
Central Data Bank List For Fixing
49 pages
Appendix - A Details of Temporary OHL Mast, Back-Tie Brackets & Protective Fence
PDF
No ratings yet
Appendix - A Details of Temporary OHL Mast, Back-Tie Brackets & Protective Fence
6 pages
Short Term Program - Pit by Pit (7sw-D-fr65)
PDF
No ratings yet
Short Term Program - Pit by Pit (7sw-D-fr65)
3 pages
FR65 (Instrumentation) Initial Report
PDF
No ratings yet
FR65 (Instrumentation) Initial Report
1 page
C U L C U L: Location Plan
PDF
No ratings yet
C U L C U L: Location Plan
1 page
1102 W Hik SWL C14 018a
PDF
No ratings yet
1102 W Hik SWL C14 018a
1 page
Method Statement For Construction of Drainage and Manholes (Rev. A)
PDF
No ratings yet
Method Statement For Construction of Drainage and Manholes (Rev. A)
53 pages
1102 W Hik SWL C14 013a
PDF
No ratings yet
1102 W Hik SWL C14 013a
1 page
1102-ERFC-CM (SCLC) - CS-0001701 (Marked)
PDF
No ratings yet
1102-ERFC-CM (SCLC) - CS-0001701 (Marked)
1 page
1102 W Hik SWL C14 012a
PDF
No ratings yet
1102 W Hik SWL C14 012a
1 page