G Gammon OTHER SUBMISSION
(GBCMIL REF: -J3039 /308.7.1/ Do4TaT
Major Trade Contractor [Gammon Building Construction (Macau) Limited | Page:| (1 ) of (2 )
We submit herewith the following submission to HCEM for (¥ ) Comment /Approval — (__) Information
(_) Others —
TAPECTED COMMENTAPPROVAL DATE: BNOV 2005 LATEST APPROVAL DATE
‘SUBJECT: PRESTRESS TRANSFER BEAM — DESTRESSING METHOD STATEMENT
DETAILS: Further to our submission ref. SUB/2120/MIS/208 concerning the method statement for post-ensioning
work, we are pleased to submit the distressing method for temporary tendon of TB2, TB3, T836 & TB37
for your approval
Ort Wa wi_wetsofenet (7 wie ere | Autorzed Represeriave Soc
()AEDAS wh_setofenel ooo ort
(JORP wget ofoncl ¢ wi—ateateret | Charlz Yan
(PAR wo sem feral CY wats tere | Project Manager
{Bw seoferet wets of ert jt
(VyeacmL wh ete tere ots fl Uber
et of enc set ote :
Submission Date (IMD) 31 Oct 2008
be. Atitecural Structural! MAE GS (Plonaing
fa had received the abave submission rom Najor Wade Contractor, Gammon Building Construction (Macau) Utd, The
Icuomission is considered necessary for your corresponding response.
ndorsed by:
Kenneth Yio (Project Nanager)
PBA/MPS/LBB)
TAuextad Represorad
[rome neice ter
Sionauwe
Baie offoeue WMD)
ja Terward herewith the above consulant’s response and endorse the same for your follow up action,
Endorsed by: Date:
Kenneth Via (Project Manager)
Hin Chong Engineering (Macau) Li,
TV wh_eteoferet (POA woes chem
(YAEDAS wh__setsofenel (LAB wl_sets of
‘
‘
YOAP— w_petsenet—()GBCML wi s0t of ne.
YPBA —wi__setsofencl () wants of enc.OTHER SUBMISSION
‘SUBMISSION REF.: | SUB/ 2120/8 /272
GBCMIL REF. "§8039 3047.1 7 Doat47
Major Trade Contractor [Gammon Building Construction (Macau) Limited
Page (2 jof( 2 )
SUBJECT, PRESTRESS TRANSFER BEAM _DESTRESSING METHOD STATEMENT,
States
eee (conse)
Consultant Remark
comments
DESTRESSING METHOD
STATEMENT
“ae
2 sprcee cansncton wiht ute cro
1 “prcee erciutonsbjerta sangeet
‘Rett sora procenars asa remnantFreyssinet Macau Ltd
‘Transfer beam of Venetian project
Method statement of de-tension strands
De-tensioned will be handled with mono jack. There will be one by one strand for de-
tensioned and will be step by step beginning from high pressure until the 0 pressure.
The single mono jack used combine with de-tension chair.
Put the de-tension chi
corresponds.
on top the anchorage block follow the block pattern
Install the mono jack into the previous stressed strand on the first top line of
anchorage.
The mono jack is positioned must away from the front of de-tension plate
about 100 mm.
Connect the hydraulic hose to the mono jack and pump together (must
check on each port are corrected)
Apply smoothly pressure up to the maximum force into the
strand {sometime must apply higher pressure than previous force)
Whenever see the jaws are moved from the block then stop apply the
pressure.
Use the screwdriver or hook removed the jaws away from the block about
50 mm.
Then slowly release pressure from the jack until 0 bars, then will see the
jaws position moved close to the block again.
So, repeat from the beginning until the last procedure again then the force
in strands will be come non force.
Then keep doing another strand until all strands are free load.
DETENSION CHAIR