Sar Debit Note

The document provides details of modification work carried out at a power plant, including 31 debit entries. Each debit entry includes the SAR number, date, description of the modification work, man-hours involved, and cost details. The total man-hours and costs for the modification work amounted to 314945 Rs. and 241820 Rs. respectively, with most of the work debited to the plant itself or to B&H (boiler and heat exchanger department).
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views14 pages

Sar Debit Note

The document provides details of modification work carried out at a power plant, including 31 debit entries. Each debit entry includes the SAR number, date, description of the modification work, man-hours involved, and cost details. The total man-hours and costs for the modification work amounted to 314945 Rs. and 241820 Rs. respectively, with most of the work debited to the plant itself or to B&H (boiler and heat exchanger department).
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 14

DEBIT DETAILS

SL.NO:

DESCRIPTION

Manhours for
modification
(Hrs)

SAR NO:

SAR DATE

SAR-WHRB-1

22.12.08

HOPPER BELOW ECONOMISER

348

SAR-WHRB-2

23.12.08

WHRB SADDLE FDN DESCRIPANCY

366

SAR-WHRB-6

20.03.09

MAIN DOWNCOMER SUPPORT

80

SAR-WHRB-7

25.03.09

DC4/1 & DC 4/2

SAR-WHRB-8

20.04.09

SUPERHEATED PIPING FOULING


WITH BRACING

40

SAR-WHRB-9

20.04.09

SILENCER SUPPORTING
STRUCTURE MODIFICATION

112

SAR-WHRB-10

15.05.09

RISER PIPES FROM EVA-III TOP


HRD FOUND SHORT IN LENGTH

SAR-WHRB-10A 15.01.09

EVA COILS & SUPERHEATER COILS


FOUND DAMAGE IN
TRANSPORTATION

SAR-WHRB-11

15.05.09

EVAPORATOR-III CROSS OVER


PIPES

10

SAR-WHRB-12

20.06.09

PURLINS ARE NOT AVAILABLE AT


EACH CORNERS FOR COVERING
THE CANOPY SHEETS

11

SAR-WHRB-13

20.06.09

RISER PIPES FROM EVA-II TOP HRD


FOUND SHORT IN LENGTH

12

SAR-WHRB-14

20.06.09

RISE PIPE 3/1 FOULING WITH


BRACING

180

13

SAR-WHRB-15

27.07.09

ATTEMPERATOR PIPING

14

SAR-WHRB-16

20.06.09

RISER PIPE 6/2

15

SAR-WHRB-17

20.06.09

DOWNCOMER SUPPORT BEAMS


SPLICING

16

SAR-WHRB-18

20.06.09

R 5/2 & R 2/1

17

SAR-WHRB-19

02.07.09

SEALING PLATES ARE NOT


AVAILABLE ON INTERMEDIATE
PANELS

128

18

SAR-WHRB-20

30.06.09

PLATFORM SHIFTED FOR


POSITIONED DRUM SAFETY VALVE

60

19

SAR-WHRB-21

12.07.09

RISER PIPES FOULING WITH


BRACING

120

20

SAR-WHRB-22

20.07.09

SHIELDING PLATE CONTOUR NOT


MATCHING

88

21

SAR-WHRB-23

20.07.09

SPR 14 & SPR-17 FOULING WITH


1-VBR-1 & 1-VBR-3

84

22

SAR-WHRB-27

12.08.09

SUP-05 & SUP-10,BEAMS FOUND


SHORT IN LENGTH, HENCE
SPLICING DONE

56

23

SAR-WHRB-29

12.08.09

SUPPORT CLAMP MODIFICATION


OF SPR-20

32

24

SAR-WHRB-30

12.08.09

INLET DUCT SUPPORTING


STRUCTURE

25

SAR-WHRB-31

12.08.09

THERMOWELL STUB MODIFICATION

274

26

SAR-WHRB-32

12.08.09

LRSB-2 FOULING WITH BRACING

56

27

SAR-WHRB-33

12.08.09

ECO TO ESP DUCT NO. D2


MODIFICATION

118

28

SAR-WHRB-34

12.08.09

SILENCER PIPING MODIFICATION

60

29

SAR-WHRB-C

10.08.09

ECO TO ESP DUCT NO.D7


MODIFICATION

173

30

SAR-WHRB-D

10.11.09

HAND RAILING MODIFICATION

196

31

SAR-WHRB-A

13.07.09

FEED WATER LINE MODIFICATION /


TERMINAL POINT

EBIT DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Structural
Material
Amount in
Extra Inch Joint cost
Cost
Rs.
dia welding @ 1000/Debit to
involved @
( to include
involved per inch dia
Rs.45/- per
all cost)
Kg

15660.00

2000.00

17660.00

B&H

16470.00

1500.00

17970.00 CLIENT

3600.00

3600.00

B&H

0.00

16

16000.00

16000.00

B&H

1800.00

1800.00

B&H

5040.00

5040.00

B&H

0.00

24

24000.00

24000.00

B&H

0.00

21

21000.00

21000.00

B&H

0.00

32

32000.00

32000.00

B&H

8100.00

4500.00

12600.00

B&H

0.00

16

16000.00

16000.00

B&H

0.00

6000.00

6000.00

B&H

0.00

6000.00

6000.00

B&H

0.00

6000.00

6000.00

B&H

2700.00

2700.00

B&H

0.00

12

12000.00

12000.00

B&H

5760.00

2700

8460.00

B&H

2700.00

2700.00

B&H

5400.00

5400.00

B&H

3960.00

3960.00

B&H

3780.00

3780.00

B&H

2520.00

2520.00

B&H

1440.00

1440.00

B&H

0.00

0.00

B&H

12330.00

12330.00

B&H

2520.00

2520.00

B&H

5310.00

5310.00

B&H

0.00

32

32000.00

32000.00

B&H

7785.00

8550

16335.00 POWER

8820.00

8820.00 POWER

0.00

9000.00

9000.00

TOTAL

314945.00

B&H

DEBIT DETAILS

SL.NO:

DESCRIPTION

Manhours for
modification
(Hrs)

SAR NO:

SAR DATE

SAR-AFBC-1/
MDR-30

07.01.09

AFBC COLUMN BK2 FOUND BEND


IN TRANSPORTATION

636

SAR-AFBC-2

12.01.09

AFBC COLUMN BK2 BASE PLATE


ORIENTATION CHANGED

120

SAR-AFBC-3

19.02.09

ECONOMISER SUPPORT BOTTOM


FRAME MODIFICATION

24

SAR-AFBC-4

26.04.09

MAN HOLE DOORS COVERS ON


RHS WW PANEL FOULING WITH
PLATFORM

SAR-AFBC-5

20.04.09

ECONOMISER CUM APH HOPPER


PLATE FOULING WITH CIVIL
STRUCTURE BEAM

100

SAR-AFBC-6

10.06.09

PURLINS ARE NOT AVAILABLE AT


EACH CORNERS FOR COVERING
THE CANOPY SHEETS

180

SAR-AFBC-7

10.06.09

APH TO PLENUM DUCT


MODIFICATION

80

SAR-AFBC-8

10.06.09

MAIN DOWNCOMER FOULING WITH


PLATFORM BEAMS ON BOTH SIDE

SAR-AFBC-9

10.06.09

SA DUCT FOULING WITH BRACKET


BKT2

11

SAR-AFBC-11

02.09.09

DOWNCOMER PIPE DC-5 FOULING


WITH STRUCTURAL BRACING

13

SAR-AFBC-13

24.09.09

RISER PIPE MODIFICATION

15

SAR-AFBC-15

10.06.09

BUNKER BEAMS SPLICED AT 6


PLACES

35

16

SAR-AFBC-16

02.09.09

DOWNCOMER PIPE DC-7,8,12


FOULING WITH STRUCTURAL
BEAMS & CIVIL BEAMS

17

SAR-AFBC-17

05.10.09

MISC. PR. PART SUPPORT OF PRI.


SH COILS IS NOT MATCHING WITH
TUBE OD.

18

SAR-AFBC-18

05.10.09

INTEGRAL PIPING-III LINE


MODIFICATION

19

SAR-AFBC-19

19.10.09

PIPING SUPPORT FOR INTEGRAL


PIPING

12

29

SAR-AFBC-I

10.11.09

HAND RAIL POST MODIFICATION

232

30

SAR-AFBC-J

07.12.09

FUEL FEED CHUTE TOP FLANGE


MODIFICATION

120

31

SAR-WHRB-K

08.12.09

HARDWARE PURCHASE FOR FUEL


FEED CHUTE BOTTOM FLANGE

DEBIT DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Amount in
Extra Inch Joint cost
T&P/ Crane Rs.
dia welding @ 1000/Debit to
Charges
( to include
involved per inch dia
all cost)

Material
Cost
involved

28620.00

12840.00

5400.00

3465.00

3500.00

1080.00

1080.00

B&H

0.00

0.00

B&H

4500.00

4500.00

9000.00

B&H

8100.00

4500.00

12600.00

B&H

3600.00

B&H

3600.00

41460.00

B&H

12365.00 POWER

0.00

0.00

B&H

0.00

0.00

B&H

24

24000.00

24000.00

B&H

28

28000.00

28000.00

B&H

1575.00

4275.00

5850.00

B&H

72

72000.00

72000.00

B&H

0.00

B&H

12

12000.00

12000.00

B&H

540.00

1485.00

2025.00

B&H

10440.00

5400.00

5400.00

B&H

2000.00

B&H

TOTAL

241820.00

0.00

2000.00

10440.00 POWER

It involves
drilling
work

DEBIT DETAILS

SL.NO:

SAR NO:

SAR DATE

DESCRIPTION

Manhours for
modification
(Hrs)

MDR NO.-26 &27 13.12.08

COLLECTING PLATE DAMAGE IN


TRANSPORTATION

368

SAR-ESP-1

29.01.09

ESP BEARING PLATE SIZE


MODIFICATION

329

MAIL SENT TO
H.O

28.03.09

COLLECTING PLATE ASSLY


HARDWARE PARTIALLY SUPPLIED
BY ENVIRO. SO LOCALLY
PURCHASED

SAR NO.ENV/HD/7733/00 07.06.09


2/06/09

PENT HOUSE COLUMN STICH


WELDING TO BE FULL WELDED

130

SAR-ESP-2

STAIRCASE TO DISCHARGE
HOPPER PLATFORM MODIFICATION

16

19.10.09

DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Material
Cost
involved

16560.00

14805.00

Amount in
T&P/ Crane Rs.
Debit to
Charges
( to include
all cost)
1500.00

18060.00 ENVIRO

6900.00

21705.00 ENVIRO

7800.00

7800.00 ENVIRO

5850.00

5850.00 ENVIRO

720.00

720.00 ENVIRO
TOTAL

54135.00