0% found this document useful (0 votes)
469 views2 pages

SITE: 242 Quality Control Inspection Checklist: Project Details

The inspection checklist summarizes details of a quality control site inspection for the Beach Villa project in Qatar. It lists the project name, area, date, and person conducting the inspection. Items on the checklist include verifying that the grid system and reflected ceiling plans are approved, mechanical and electrical installations are coordinated, edge battens and additional lighting supports are installed correctly, fixing accessories and openings are properly sealed, and the final suspended ceiling surface is level and free of defects. The inspector marks yes, no, or not applicable for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
469 views2 pages

SITE: 242 Quality Control Inspection Checklist: Project Details

The inspection checklist summarizes details of a quality control site inspection for the Beach Villa project in Qatar. It lists the project name, area, date, and person conducting the inspection. Items on the checklist include verifying that the grid system and reflected ceiling plans are approved, mechanical and electrical installations are coordinated, edge battens and additional lighting supports are installed correctly, fixing accessories and openings are properly sealed, and the final suspended ceiling surface is level and free of defects. The inspector marks yes, no, or not applicable for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SITE: 242

QUALITY CONTROL
Inspection checklist
Project Details
Project Name
BEACH VILLA (B+G+1+PH) ON BVN 55 to 60 at the Pearl Qatar
Area/Building
MV/PA/GH
Date
Person doing site inspection: (Print name)
Person doing site inspection: (Signature)

Items for inspection


Item
Are the grid system approved by
the consultant?
Has the contractor prepared the
approved reflected ceiling
plans?
Has the contractor prepared a
coordinated drawing indicating
the position of mechanical and
electrical installations?
Have all edge battens been
fixed?
Has the contractor provided
additional and separate
supports for all lights fixtures,
diffusers.,,etc
Is the contractor providing the
suspension system in
accordance to the
recommendations of the
supplier?
Are all fixing accessories are
checked and inspected?
Are all the openings for sleeves
and ducts sealed properly to
avoid spread of fire?
Have all the spare sleeves
provided above the ceiling have
been sealed?
Is the suspended ceiling
accurately cut to accommodate
all fixtures?
Is the final surface free from any
waves, buckles, sags and handmarks?
Is the final surface in true level?
= yes
X = no
Quality Control Site Inspection checklist
Current Version 1 by JML

X
or N/A

Item

X
or N/A

N/A = not applicable

Quality Control Site Inspection checklist


Current Version 1 by JML

You might also like