SITE: 242 Quality Control Inspection Checklist: Project Details
SITE: 242 Quality Control Inspection Checklist: Project Details
QUALITY CONTROL
Inspection checklist
Project Details
Project Name
BEACH VILLA (B+G+1+PH) ON BVN 55 to 60 at the Pearl Qatar
Area/Building
MV/PA/GH
Date
Person doing site inspection: (Print name)
Person doing site inspection: (Signature)
X
or N/A
Item
X
or N/A