B.1.2.1 Pipe List - 0NE2 - MEW - 0002

This document provides a pipe list for a fuel gas system as part of a combined cycle power plant project in Turkey. It includes 3 pipes: the main gas line, a gas line to the GTG1 fuel system, and a gas line to the GTG2 fuel system. For each pipe, it lists the pipe name, medium transported, material, design and operating pressures, diameter, dimensions, design and operating temperatures, pressure rating, dimension standard, and remarks. The pipe list was prepared, checked, and approved by three individuals on March 15, 2004.

Uploaded by

Jaroslav Kuruc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

B.1.2.1 Pipe List - 0NE2 - MEW - 0002

This document provides a pipe list for a fuel gas system as part of a combined cycle power plant project in Turkey. It includes 3 pipes: the main gas line, a gas line to the GTG1 fuel system, and a gas line to the GTG2 fuel system. For each pipe, it lists the pipe name, medium transported, material, design and operating pressures, diameter, dimensions, design and operating temperatures, pressure rating, dimension standard, and remarks. The pipe list was prepared, checked, and approved by three individuals on March 15, 2004.

Uploaded by

Jaroslav Kuruc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Combined Cycle Power Plant

for NUH - Turkey

DOCUMENT No.:

0 NE 2 - MEW 0002

REVISION:

TITLE

B.1.2.1 Pipe List


B.1 Fuel Gas System
Plant Technological Part
PREPARED

CHECKED

APPROVED

NAME

Miroslav VEKONY

Daniel TEREK

Miroslav PISAR

DATE

15.03.2004

15.03.2004

15.03.2004

SIGNATURE

15.03.2004

Combined Cycle Power Plant for NUH - Turkey

Project Name
Document No.:

Rev:

Name of Document:

0 NE 2 - MEW 0002

Date:

Page:

15.03.2004

B.1.2.1 Pipe List

2 of 2

Flow

Material

Delivery

Pipe line number

Design. Pres.

Oper. Pres.

DN

Dimension

Drawing No.

Revision

Design Temp.

Oper. Temp.

PN

Dim. Standard

Item

001

Pipe Name

Main Gas Line


Text91:

00EKG10 BR010

Medium

Natural gas Text91:


17,8 t/h carbon Steel
Text9
46,5 bar(a)
50 bar(a)
125
139,7 x 5,6
100 C

002

Gas line to GTG1 fuel system


Text91:

01EKG10 BR020

02EKG10 BR030

Gas
line to GTG2 fuel system
Text91:

63

25 C

63

25 C

63

I. Phase
2P-EL-1084

STN EN10216-2

Natural gas Text91:


8,9 t/h carbon Steel
Text9
46,5 bar(a)
50 bar(a)
80
88,9 x 4
100 C

2P-EL-1084

STN EN10216-2

Natural gas Text91:


8,9 t/h carbon Steel
Text9
46,5 bar(a)
50 bar(a)
80
88,9 x 4
100 C

003

25 C

Remark
I. Phase

STN EN10216-2

II. Phase
2P-EL-1084