0% found this document useful (0 votes)
44 views3 pages

Tips For The Day - 4: Check List For Concrete Preparations

This document provides a checklist for concrete preparations, including ensuring enough workers are available for mixing, placing, and vibrating concrete, checking materials are available, equipment is sufficient and in good condition, construction joints are planned, lighting is arranged if working at night, and facilities for curing and rain protection are ready. It also notes concrete should be placed when the temperature is between 25 to 40 degrees C.

Uploaded by

RamBinodSharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views3 pages

Tips For The Day - 4: Check List For Concrete Preparations

This document provides a checklist for concrete preparations, including ensuring enough workers are available for mixing, placing, and vibrating concrete, checking materials are available, equipment is sufficient and in good condition, construction joints are planned, lighting is arranged if working at night, and facilities for curing and rain protection are ready. It also notes concrete should be placed when the temperature is between 25 to 40 degrees C.

Uploaded by

RamBinodSharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 3

TIPS FOR THE DAY 4

Check List for Concrete Preparations

04.03.2010

Check List for Concrete Preparations


1. Check whether enough workmen are available for
concreting,loading,mixing,placing and vibrating.
2. Check the availability of materials.
3. Review the condition and sufficiency of equipment for
mixing,transporting,placing, vibrating and curing. There should
be atleast one or two extra vibrators for standby service.
4. Confirm the proportioning of materials.
5. Before starting the concrete, decide the location of
construction joints including the joints which might need to be
installed at short notice due to unforeseen stoppage of
placement.
04.03.2010

Check List for Concrete Preparations


6. In case concreting is to be continued during night,
arrange for lighting facilities, well in advance.
7. Check whether facilities for curing and for
protection from rain are available at site.
8. Concreting shall be done when the temperature is
between 25 to 40 C