0% found this document useful (0 votes)
335 views2 pages

Fatigue Tem

This document presents a fatigue analysis of a bracket. It calculates the stress on the bracket from normal operating conditions and various windmilling cases. It then uses these stresses to calculate the number of cycles for each case using a fatigue analysis formula. It compares the calculated cycles to allowable cycles for 1-hour and 3-hour diversion missions to determine the total damage to ensure it is less than 1.

Uploaded by

Manoj Manoharan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
335 views2 pages

Fatigue Tem

This document presents a fatigue analysis of a bracket. It calculates the stress on the bracket from normal operating conditions and various windmilling cases. It then uses these stresses to calculate the number of cycles for each case using a fatigue analysis formula. It compares the calculated cycles to allowable cycles for 1-hour and 3-hour diversion missions to determine the total damage to ensure it is less than 1.

Uploaded by

Manoj Manoharan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SUBJECT :

FILE No :

Author :

Date :

Page :

6.0 Fatigue Analysis


Cross Section of Bracket

4.8mm
X
Y
25.00

Max Ultimate Stress (Smax) form static case

141

in G Factor

32.99

Max Ultimate 1G Stress (Smax)


R = Smin/Smax

=
=

0.10 ( From Material Data Ref [3])

AFI =

1/Kt*F1*F2*F3*F4*F5*F6*F7*M*E*C

Where:
Diameter of the Bolt (D)
Effective Width (W)
Bracket thickness (t)

=
=
=

4.27 MPa

4.80mm
25.00mm
2.50mm

t/W
D/W
Kt

=
0.1
=
0.2
= 2.20 (From ESDU 09014 Figure 2)
F1(countersink effect)
= 1.00 ( From Ref [6])
F2(Fastener type effect)
= 1.00 ( From Ref [6])
F3( Fastener fitting condition effect)
= 1.24 ( From Ref [6])
F4(Effect of preload relaxation in hybrid joint)
= 1.00 ( From Ref [6])
F5(Mechanical process effect)
= 1.00 ( From Ref [6])
F6(Surface treatment effect)
= 0.75 ( From Ref [6])
F7(Lug and bushing effect)
= 1.00 ( From Ref [6])
M (2024 T42)
= 1.00 ( From Ref [6])
E =(3.175/Radius)^0.08
= 1.02 ( From Ref [6])
C (Constant)
= 510 ( From Ref [6])
AFI
= 220
q
= 0.60 ( From Ref [6])
p
= 4.60 ( From Ref [6])
Number of cycles are calculated by following forumule

AFI
N = 10

q
((1 R ) / 0.9 ) s MAX

Normal Operating Case


Maximum Wing Acceleration (Nz)
Maximum Stress G
Applied Cylcels Nnormal
Allowable cycles
d1DSG

=
=
=
=
=

32.05
136.98 MPa
8.93E+05
2.88E+04
3.23E-02

( From Ref [2])


(Smax * Nz)
(from above equation)
( From Ref [2])

2.5mm

SUBJECT :

FILE No :

Author :

Date :

103 MPa
87 MPa
27 MPa
9 MPa
83 MPa

(Smax * Q * SEI)

Page :

Windmilling Case
Stress with amplification and SEI
Initial Descent 18G
Cruise 17.4G
Final Descent 5.8G
Approach & Landing 2G
Transient 16G

=
=
=
=
=

Applied Number of cylced for Windmilling case


NInitial Descent 18G
=
NCruise 17.4G
=
NFinal Descent 5.8G
=
NApproach & Landing 2G
=
NTransient 16G
=

3.38E+06
7.24E+06
1.56E+09
2.69E+11
8.93E+06

(Smax * Q * SEI)
(Smax * Q * SEI)
(Smax * Q * SEI)
(Smax * Q * SEI)

(from above equation)


(from above equation)
(from above equation)
(from above equation)
(from above equation)

Allowable Cycles (N) for 1 hr Mission Ref [1]

Initial Descent 18G


Cruise 17.4G
Final Descent 5.8G
Approach & Landing 2G
Transient 16G

dSEI1hrDiversion =

20000
NInitialdescent

=
=
=
=
=

20000 Cylcles
25000 Cylcles
6000 Cylcles
2000 Cylcles
20 Cylcles

( From Ref [1])


( From Ref [1])
( From Ref [1])
( From Ref [1])
( From Ref [1])

25000
20
6000
2000
+
+
+
NCruise Ntransient NFinalDescent NApp roachandLanding

dSEI 1 Hr Diversion

9.38E-03

Allowable Cycles (N) for 1 hr Mission Ref [1]

Initial Descent 18G


Cruise 17.4G
Final Descent 5.8G
Approach & Landing 2G
Transient 16G

dSEI1hrDiversion =

20000 Cylcles
93000 Cylcles
6000 Cylcles
2000 Cylcles
20 Cylcles

20000 93000
20
6000
2000
+
+
+
+
NInitialdescent NCruise Ntransient NFinalDescent NApproachandLanding

dSEI 3 Hr Diversion

Damage

T otal, 1 hour Diversion

Damage

T otal, 3 hour Diversion

1.88E-02

= (d 1DSG + d SEI 1 Hr Diversion ) x 2 < 1


= (d 1DSG + d SEI 3 Hr Diversion ) < 1

total damage (1 hour diversion mission)


total damage (3 hour diversion mission)

=
=

8.33E-02
5.10E-02

You might also like