Test Reports - Circuit Breaker

This test report summarizes inspection of a switch. It provides the client and location details, and lists the switch specifications. Contact resistance and insulation resistance were tested between phases and from phases to ground. Measurements were within acceptable limits. The report was prepared by a testing engineer, checked by the head of quality standards, and confirmed by another party.

Uploaded by

Ronniel de Ramos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views8 pages

Test Reports - Circuit Breaker

This test report summarizes inspection of a switch. It provides the client and location details, and lists the switch specifications. Contact resistance and insulation resistance were tested between phases and from phases to ground. Measurements were within acceptable limits. The report was prepared by a testing engineer, checked by the head of quality standards, and confirmed by another party.

Uploaded by

Ronniel de Ramos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

TEST REPORT

SWITCH
Client Name:
Address:
Location:
SPECIFICATION
Rated Current:
Rated Voltage:
Phase:

Make:
Type:
Serial No.:
I. CONTACT RESISTANCE TEST
TEST POINT
MEASURED VALUE ()

Phase A

Phase B

REMARKS
II. INSULATION RESISTANCE TEST
A. CLOSE CONTACT
LINE TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

Insulation Resistance Test @


TEST POINT
Phase A to Phase B
Phase B to Phase C
Phase C to Phase A

B. OPEN CONTACT
LINE TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

Insulation Resistance Test @


TEST POINT
Phase A to Ground
Phase B to Ground
Phase C to Ground

NOTES:
1. Contact resistance result must not deviate more than 50% of the lowest value from the adjacent poles.
2. Insulation resistace result must be more than 5 Giga-Ohms between phases and phase to ground.
III. REMARKS

TESTED BY:

PREPARED BY:

Testing & Commissioning


Engineer
Testing Technician/s

CHECKED BY :

EDUARDO M. PATI, PE
SPQS, Head

Date of Test :

TEST REPORT

Document No.:

SWITCH

SPECIFICATION
Rated Current:
Rated Voltage:
Phase:

Phase B

Phase C

LINE TO LINE
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Phase B
Phase B to Phase C
Phase C to Phase A

LOAD TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

REMARKS

CHECKED BY :
EDUARDO M. PATI, PEE
SPQS, Head

CONFORME:

Signature Over Printed Name

Designation

TEST REPORT
SWITCH
Client Name:
Address:
Location:
SPECIFICATION
Rated Current:
Rated Voltage:
Phase:

Make:
Type:
Serial No.:
I. CONTACT RESISTANCE TEST
TEST POINT
MEASURED VALUE ()

Phase A

Phase B

REMARKS
II. INSULATION RESISTANCE TEST
A. CLOSE CONTACT
LINE TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

Insulation Resistance Test @


TEST POINT
Phase A to Phase B
Phase B to Phase C
Phase C to Phase A

B. OPEN CONTACT
LINE TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

Insulation Resistance Test @


TEST POINT
Phase A to Ground
Phase B to Ground
Phase C to Ground

NOTES:
1. Contact resistance result must not deviate more than 50% of the lowest value from the adjacent poles.
2. Insulation resistace result must be more than 5 Giga-Ohms between phases and phase to ground.
III. REMARKS

TESTED BY:

PREPARED BY:

Testing & Commissioning


Engineer
Testing Technician/s

CHECKED BY :

EDUARDO M. PATI, PE
SPQS, Head

Date of Test :

TEST REPORT

Document No.:
CB-0001

SWITCH

SPECIFICATION
Rated Current:
Rated Voltage:
Phase:

Phase B

Phase C

LINE TO LINE
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Phase B
Phase B to Phase C
Phase C to Phase A

LOAD TO GROUND
Insulation Resistance Test @ _________ VDC
TEST POINT
MEASURED VALUE (G)
Phase A to Ground
Phase B to Ground
Phase C to Ground

REMARKS

REMARKS

CHECKED BY :
EDUARDO M. PATI, PEE
SPQS, Head

CONFORME:

Signature Over Printed Name

Designation

You might also like