0% found this document useful (0 votes)
76 views2 pages

STG Temporary Bridge Template

This document provides details of a temporary bridge for an employee named Rohith S working as a SSE on the DB Systel project with code PRJ 1710. The bridge is required for a client demo from 2:00 pm to 4:00 pm and will be overseen by the project director Inigo Angelus.

Uploaded by

rajeevrocks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

STG Temporary Bridge Template

This document provides details of a temporary bridge for an employee named Rohith S working as a SSE on the DB Systel project with code PRJ 1710. The bridge is required for a client demo from 2:00 pm to 4:00 pm and will be overseen by the project director Inigo Angelus.

Uploaded by

rajeevrocks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Temporary Bridge Template

Sr.
No. Location
Name of the Emp
1 Chennai Rohith S

Emp
Emp
Code
Designation
Emp Email ID
24769 SSE
[email protected]

Project Name
DB Systel

Project Director /
DU Head name
Inigo Angelus

Project
Code
PRJ 1710

Project Finance
Code
Reasons for Bridge Requirement
1380 Client Demo

Bridge Start Date Bridge End Date &


& Time
Time
2.00 pm
4.00 pm

You might also like