0% found this document useful (0 votes)
51 views10 pages

Create and Generate Scenario

This document describes how to generate, schedule, and verify the execution of an ODI scenario. It outlines the steps to generate a scenario in ODI Studio, schedule it for execution on an ODI agent, and then view the execution results in the ODI operator.

Uploaded by

shankar680
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views10 pages

Create and Generate Scenario

This document describes how to generate, schedule, and verify the execution of an ODI scenario. It outlines the steps to generate a scenario in ODI Studio, schedule it for execution on an ODI agent, and then view the execution results in the ODI operator.

Uploaded by

shankar680
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Generating and Scheduling Scenario with ODI 11g

Generate Scenario with ODI 11g


In order to create a new Scenario with ODI, you need to perform the following steps:
Go to Start > Programs > Oracle > Oracle Data Integrator > ODI Studio .
Select DSBWR13 from the Login Name drop-down. Enter SUPERVISOR in the User field and
password in the Password field. Click OK to login.

Expand the Pop.FFtoRT interface and expand Scenarios. Right-click the Pop.FFtoRT interface
and then click Generate Scenario as shown in the following screenshot.

Scheduling the ODI Scenario


To schedule the scenario with ODI Agent, perform the following steps:
In Topology Navigator, open: Physical Architecture > Agents > DemoAgent.
Click Test to verify connection to ODI agent, as shown below.

Expand the Pop.FFtoRT interface. Expand Scenarios > POP_FFTORT Version 001.
Right-click Scheduling and select New Scheduling.

On the screen that follows, select the agent where the scheduled scenario will run: DemoAgent.
Set Context as Global and log level to 5.
Set Execution to Simple and click the

button.

Set the execution time and Click Save button.

Expand Scheduling and verify that the GLOBAL / DemoAgent entry is now inserted under Scheduling.

Open Topology Navigator to review the scheduling of the Agent. In the Physical architecture, expand the
Agents node, double-click DemoAgent. On the DemoAgent screen, click Update Schedule.
On the screen that follows, click OK. Click OK again.

Click the View Schedule button to see the screen containing the scheduling information.

Verify Execution of Scheduled ODI Scenario


Perform the following steps, in order to verify execution of the scheduled scenario:
Click the ODI Operator tab to open ODI Operator. In ODI Operator, click the Session List tab.
Wait until scheduled execution time to view the execution results, and then click the Refresh
icon.

Expand: Date > Today >, and view the execution results for the Pop.FFtoRT interface. Note the
execution time of this scenario. That is the time that you scheduled with ODI Agent.

You might also like