The document provides specifications for installing a diesel firing burner and supply line, noting that a minimum gap of 75mm is required between the burner and any boundary wall, the diesel pipe has a diameter of 323mm, and there must be a minimum clearance of 150mm from the burner to any plate, for a total minimum clearance from the boundary wall of 550mm.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
41 views1 page
Heat Treatment Layout
The document provides specifications for installing a diesel firing burner and supply line, noting that a minimum gap of 75mm is required between the burner and any boundary wall, the diesel pipe has a diameter of 323mm, and there must be a minimum clearance of 150mm from the burner to any plate, for a total minimum clearance from the boundary wall of 550mm.