The project involves providing pipe lengths and fittings from stock to a client for use on an offshore oil rig. The goods must be quality assured, inspected, and shipped by the deadline to avoid delays. The main objective is to deliver the correct products that meet the technical specifications on time. The project will be considered successful if all goods are delivered to the client by the agreed upon deadline and meet the product specifications and purpose. Functional and technical specifications, costs, quality control testing, training, and health and safety requirements must all be addressed.

Uploaded by

sirjamles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
465 views2 pages

Project Specification

The project involves providing pipe lengths and fittings from stock to a client for use on an offshore oil rig. The goods must be quality assured, inspected, and shipped by the deadline to avoid delays. The main objective is to deliver the correct products that meet the technical specifications on time. The project will be considered successful if all goods are delivered to the client by the agreed upon deadline and meet the product specifications and purpose. Functional and technical specifications, costs, quality control testing, training, and health and safety requirements must all be addressed.

Uploaded by

sirjamles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BTEC Level 3 Diploma In Manufacturing Engineering

Project Specification

Project Overview

Brief description of project


Provide pipe lengths and pipe fittings from stock/suppliers to a
client. Includes the preparation and shipment of goods. These
goods are quality assured and thoroughly inspected before release
from the company premises. The goods are to be implemented on
an offshore oil rig system.

Project Objectives

Detail the main goals and objectives of the project


The main objective of the project is to provide the relative goods
while reaching the designated deadline to ensure the end-client is
not affected by any delay caused by the company. All products will
be under a technical specification to which they are made. This is
to ensure the grade and quality of the products is satisfactory and
manufactured to all requirements outlined in its aforementioned
technical specification.

Success Criteria

Detail what outcomes will determine if the project has been


successful.
Providing all goods are shipped to the end client and are fit to
specification and purpose (product name/specification should be
outlined during the quote/enquiry process when approaching the
sales dept) and are supplied to the end client within the agreed due
dates, the project will be considered a success. If the project is to
exceed the agreed due date and is considered late, this may
jeopardize the payment aspect of the project as well as the
relationship with the client themselves.

Functional Specification

Specify the functional requirements of the project Scope

Technical Specification
Specify technical requirements that must be achieved
Costs

Specify the agreed financial budget, detail proposed development


and introduction costs if available.
Testing and Quality Control
Highlight any specific testing or quality control tools that will be
required during the project

Training and Documentation

Identify training & documentation requirements for successful


project introduction/integration

Future Development
Identify scope for further development following project
completion.

Health & Safety, Legislation and Environmental


Identify any factors that are required to ensure successful project
completion.