Hasil OK Jalan TP & Follow Up QC: To From R&D

This document outlines the process for facility checks from research and development. It involves testing a prototype, checking the results, conducting further tests if needed, and submitting a final report to R&D. If test results are OK, then specifications can proceed to mass production. Otherwise, additional testing may be required.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Hasil OK Jalan TP & Follow Up QC: To From R&D

This document outlines the process for facility checks from research and development. It involves testing a prototype, checking the results, conducting further tests if needed, and submitting a final report to R&D. If test results are OK, then specifications can proceed to mass production. Otherwise, additional testing may be required.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

A

To From R&D

Fasility Check

Spec TP

Schedule PPC
NO

Hasil OK
Jalan TP & Follow Up QC
Order Test & T1
Report QC
Schedule From PPC A
NO

Hasil TP OK
Test T1

Order Test Ke LAB

Final Report to R&D


Hasil Test
LAB

Judgement R&D

Internal Report Analysis


NO Test OK
Hasil

NO

Hasil Test OK
Spec Mass Production