RAMGARH GAS THERMAL POWER PLANT
A
PRACTICAL TRAINING & INDUSTRIAL VISIT REPORT
Submitted for the partial fulfillment of the requirement of the
Degree
of
BACHELOR OF TECHNOLOGY
in
ELECTRICAL ENGINEERING
Submitted To:
Submitted By
Prof. Vidya Sagar Kalla
Jitendra Kumar
(Head, Electrical Engg.)
(IV B.Tech., VII Sem)
Department of Electrical Engineering
S.L.B.S Engineering College,
Jodhpur (Raj.)
Rajasthan Technical University,
Kota (Raj.)
Session-2014-2015
CERTIFICATE
This is to certify that practical training & industrial visit report entitled RAMGARH GAS
THERMAL POWER PLANT being submitted by JITENDRA KUMAR (B.Tech IV Year VII Sem.) for
the partial fulfillment of the requirement of the degree of
Bachelor of Technology in Electrical
Engineering to the Department of Electrical Engineering of S.L.B.S Engineering College, Jodhpur is a
record of seminar given by him/her on his practical training & industrial visit during the period from
02/06/2014 to 30/06/2014.
Mr. Manish Sharma
Prof. Vidya Sagar Kalla
(Asst. Prof., Electrical Engineering)
(Head, Electrical Engineering)
Date:
Place:
ACKNOWLEDGEMENT
an engineer with theortical knowledge is not a complete engineer. practical knowledge is very important to
develope and to apply engineering skills. It gives me a good pleasure
to have an opportunity to acknowledge and to express to those who were associated with me during my
training at Ramgarh Gas Thermal Power Plant.
Special thanks to Mr. Sawantaram (Executive Engineer) for providing me with an opportunity to
undergo training under able guidance. I express special thanks and gratitude to
Ramgarh Gas Thermal Power Plant authority for allowing me to undego the training.
I Will always thanks to them for their constant interest and excellent guidance in my training work,
morever for providing me with an opportunity to work and gain experience.
Jitendra kumar
(B. Tech. IV Year, VII Sem.)
Roll No 11ESLEE011
CONTENTS
Page No
1. Introduction About RGTPP
1.1 First
Unit
1.2 Second Unit
1.3 Availibility Of Water
2
3
1.4 Electrical Transmission System
1.5 Expected System Operation
3
3
1.6 Gas Transportation System
2. Power Plant Cycle
2.1 Open Cycle
2.2 Combined Cycle
2.3 Advantage Of Combined Cycle
2.4 Brayton Cycle
2.5 Rankine Cycle
3. Brief Introduction To Plant Operation
4. Gas Turbine And Their Equipments
4.1 Compressor
4.2 Combustor
4.3Transiton Pieces
4.4 Turbine
4.5 Exhaust
10
4.6 Starting System
10
4.7 Lubricating Oil System
10
4.8 Air Intake System
11
4.9 H.R.S.G. And Steam Turbine Equipments
12
4.10 Condensant Circuit Equipments
12
4.11 Feed Water Curcuit
12
4.12 Common Support System For GT And ST
13
5. Constructional Details of Gas Turbine
14
5.1 Compressor Section
14
5.2 Combustion Section
14
5.3 STG (Steam Turbine Generator)
16
5.4 Heat Recovery Steam Generator (H.R.S.G.)
17
5.5 Water & Steam Cycle Equipment
19
5.6 HP Bypass & LP Bypass(HPBP & LPBP)
19
5.7 Auxillaries
20
6. Constructional Details Of Generator And Exciter
21
6.1 Stator
21
6.2 Rotor
24
6.3 Bearings
24
6.4 Generator And Air Cooler
27
6.5 Excitation System
27
7. 132 KV Switch Yard
28
8. Conclusion
REFERENCES
Annexure-I