0% found this document useful (0 votes)
303 views

Earth Mat Layout

Earth Mat Layout
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
303 views

Earth Mat Layout

Earth Mat Layout
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
BBS MAHATRANSCO Office of the Chief Engineer, PHONE : (O) 26598588/95 Transmission Projects Deptt, (P) 26598589 3°,4"&5"Floor,Prakashganga FAX 126598587 Plot No. C-19, E-Block, Bandra Kurla Complex, Bandra(E), MUMBAI ~ 400 051. MNT T95 ETCIICOTTP) auTtaveut ayes oH il a08 ltd. Maneja Works Maneja, Vadodara Subject: Earthing layout of 132KV Rajur $/S- Approval thereof Ref. No- Y.L.No. PTPS/PH.0180 dt.01.02.2008 Dear sir, ‘The earth mat layout drawing no. (YN1H300841-126) of 132KV Rajur Sub-station submitted by you vide your letter dated 01.02.2008 have been scrutinized with respect to our drawing no. 252.482 dated 10.01.2008 forwarded to you vide letter no. 654 dtd. 14.01.2008 and hence found generally in order with minor modification in your drawing, also correct our drawing no 252.483 accordingly. If any variations required as per site coordination the same may be carried out in consultation with our field officers. ‘One copy of approved drawings enclosed ‘Thanking You Enclosed as above Yours Faithfully CE (fir Projects) Copy fw.c.to: C.E, EHVCC com O&M Zone, MSETCL, Aurangabad Copy to: 1) 5.6, EHV CC,MSETCL,, Aurangabad Along with copy of approved drawings 2) S.E(TKP) ((Moni-A), MSETCL, CO-Mumbai 2 2508 410000. 150 THIS TABLE HAS BEEN COPIED FROM MSBTCL DRG NO. TRP—1/B4RTHAT/252.481 DID-10.01.2008 -EARTHMAT DESIGN FOR 132/39kV RAIPUR SUB-STATION LAYOUT ? ° g ? ° g ° e na pe ILL 412000- 02, FAULT LEVEL 9500 MVA VOUUGE NEL OF SvB-STATON—— 159 ‘ 000 15000 45000 15000 of Fav cuRmeN £138254 as, a T a r 7 t Tt 1 tT | Of. tenors cr se-stanon PLOT to ates tuveyo__unefr neyo unegs, ves Neyo Nese nest 98: BROM OF cus Staton PL tor ws Gr, weno, oF ExcoRoDeS oe v0 oaths OF wat Soran —— ea, etcetera Soucton cece soos ts 12: Leva Gf tan Conousione ON 12 tiger Or Sen Solara 1as0ee wes 1 Nein tsar br Sone 265003 Ne Te oer cance ae 14. NO OF GRID CONDUCTOR- 15 NOS, - 18. TOUCH POTENTIONAL (E Touch). 301,349. VOLTS. 16, STEP POTENTIONAL (€ Step )——————. 275.168 VOLTS. tt ReSeMGe 9 eno canton Gay Seer 18, RESISTANCE OF ELECTRODES (Ro): 0.1780 OHVS 12 Reset or Ges teeth hone eam —aaeee Onis 20, COMBINED RESISTANCE (fc): 0.1046 OHMS Bt woot er war Sooo; ————— ane 2 wae & can coeur bodied 3 Bee ee eee Saas ; 2 SEE oF San meee aie a ima theme! eeu tae AHPROVED-T Bee ‘Nore: ‘= ALL OMENSIONS ARE BY MM. ins Bhs capa WS REE TERN on DRG. NO, TKP—I/EARTHMAT/262.481 DID-10.01.2008 01, VOLTAGE LEVEL OF SuB-StaTON—————— 152 wv, 02. LENGTH OF ‘SuB-STATION PLOoT—————— 110 rs. 03, BROTH OF SUB-STATION PLOT 110 MRS. (04, ~@-NO. OF ELECTRODES: 78 NOS. 05. —esPioRG OF Man ConducroR- 15.00 NIRS! 08. ——SPACING OF GRID CONDUCTOR————— 07.00 NIRS. 7. LENGTH OF MAN CONDUCTOR (75x10 Mil MS) 2883 IRS, - 08. LENGTH OF GRO CONDUCTOR (30x8 MM MS) 1693 MTRS, 5.0 MIRE DE] (09. LENGTH OF. EQPT EARTHING CONDUCTOR (50x8 Ma Ci) 2617 MTRS, : 1b. TOW Lm oF conoueror 7388 ts, 11. NO OF MAN CONDUCTOR (75x10 MM MS)——8+2 = 10 NOS, WA TRAEO fsuvn TRAFO- 12, NO OF GRID CONDUCTOR (5038 MM MS) — 18 Nos, ‘REFERENCE DRAWING: 1) 132/33 RV SHYD PLAN LAYOUT ~ YN1H300341-105-R2 F 2) 132/33 Kv SWYD SECTION LAYOUT ~ YWIH300541—109-R2 3) 132/33 KV RAJUR SUBSTATION EARTHING LAYOUT — ise “TKP-I/EARTHVAT/252.481 OTD~ 10.01.2008. (ISSUED BY MSETCL) 3 4) EARTHING SET STANON TYPE ‘a’ ~ EE/PL/W=1/056A. O7D=2.8.86 ; 5) DETALS OF EQUPHENT EARTHNG - YuIHS00S41~426 8 aaa « 8 2 1. AL OMENSIONS ARE IN MM. UNLESS OTHERWSE SPECIFIED. 2. UNDERGROUND FISER/EARTHMAT WLL BE LAD GOOMM GELOW FROM. THE GROUND LEVEL. |. EARTHING CONDUCTOR RUNNING BELOW CABLE TRENCHES, ORANS, ROADS & RAL vat 8 LAD 300uK BELOW THEM, THIS ORAMNG IS ONLY SYMBOLIC REPRESENTATION OF EARTHING CONCUCTOR LAYOUT. g AS PER ACTUAL SE CONDON, CONDUCTOR WiLL BE ROUTED IN SUCH MAQDIER SO ‘THAT IT DOES NOT FOUL WH ANY FOUNDATION, '. FOR DETAILS OF RISER CONNECTION & INOMDUAL EOPT EARTHING , REFER EQPT EARTHING ETAL, ORG. 6. CABLE TRENCH EARTHING WILL 8E DONE WITH SOXB GI FLAT AND RUN ALONG THE CALE TRENCH > ON TOP OF CABLE SUPPORTING ANGLES. EARTH FLAT OF CABLE TRENCH WiLL BE CONNECTED TO TO THE EARTHMAT AT SOMTR INTERVAL. 7. DISTANCE OF EARTHING GRD FROM FOUNDATION SHALL BE MINIMUM AS POSSIBLE 1, THIS DRAWN TO BE REFERRED FOR EARTHING ONLY, 1 frais DRAWING HAS BEEN PREPARED IN LINE WITH MSETOL DRAWING] INO. TkP-1/EARTHMAT/252.481, DATED=10.01.2008,. VIDE LETTER ~ MSBTCL/CO/Ts.Proj,/D&E-1V/VID/Rajur/Layout/654 [ava.~i4 JAN 2008. : g 8 of te 1 3 - roa/soxy 192 UNE BAY gs seapoet BAY "FROM dAINA-L 2 Ett i mavintcaisco aE /o0 ARNDT ee OT7 7 = cd Sn TESTABLISHMENT OF 192/33 sus-starion at Rar = Fo So ‘nonae = Dee ee] hr TERPS SHAT >| Saas ‘Benne went | ABB 29 unites YN1H300341-126 ¥ 6 = = 2 W 0 a 3 7 @ 3 * 3 2 7

You might also like